Professional Documents
Culture Documents
The 6 lead NGOs of ICVGD 2nd phase project, appointed by WFP, will support the VGD
enrolment process in respective upazilas that are mentioned in the respective agreements
between the partners and WFP. The support will encompass the following areas:
1. CAMPAIGN
a. Video clip: With support from WFP, a video clip is being developed to promote self-
application by beneficiaries.
i. Lead NGOs shall ensure the video clip is being aired through local cable
networks. In doing so, they should convince UNO by approaching through
the UWAO.
ii. If possible, district VGD committee should be communicated to issue a
circular for all the upazilas to circulate the video in local cable networks.
b. Leaflet: A leaflet has been prepared that contains key messages regarding VGD
enrolment. NGOs can support UWAOs in disseminating the leaflet. One possible way
to distribute it in the root level could be through Tothyo Apa.
c. Others: NGOs shall explore alternate modalities to disseminate the key messages
regarding VGD enrolment (i.e. NID requirement, own phone number, application
points: UDC, Tothyo apa, 333).
II. NGOs can explore if these staffs/entrepreneurs can be oriented via online.
Support Area 2: Support to Ensure Timely VGD Enrolment
Apart from raising awareness on the enrolment process, lead NGOs shall provide support to
their caliber to the respective UWAOs for ensuring completion of VGD enrolment in a Upazila in
time. Their support will mainly focus on:
1. ENROLMENT
a. Monitoring Applications Submission Status: Lead NGOs shall have access in the VGD
MIS and monitor the application status from time to time. Based on the monitoring,
they shall submit report to UWAO and Upazila VGD committee.
b. Support to Stakeholders in Using the MIS: A good rapport should be built with
stakeholders who will be using the VGD MIS regularly (Union committee, UDC
entrepreneurs, Tothyo apa staffs, UWAO, upazila committee). Lead NGO staffs should
establish themselves as the first point of contact in case any stakeholder faces issues
regarding use of VGD MIS.
c. Follow-up with and Support to Union Committee for Timely Submission: Lead NGO
staffs should regularly follow-up with the union committee to ensure they submit the
applications in time to the upazila VGD committee.
i. It is also critical to ensure all these applications are uploaded in the VGD MIS
by the Union committee. NGO staffs shall support union committees in this
regard. UDC entrepreneurs should be engaged in this process of data
digitization.
2. VERIFICATION
a. Random Household Verification: In consultation with the UWAO, the lead NGO staff
shall prepare a random verification plan and provide necessary support to verify the
applicants’ information through household visits.
b. Engage Female Ward Member: An effective verification modality could engage
respective female ward members. Lead NGO staffs shall facilitate the engagement of
female ward members in applicant verification. Necessary consultation with UNO and
UWAO can be made in thi regard.