You are on page 1of 8

CURRICULUM VITAE

MAILING ADDRESS PERMANENT ADDRESS


QUAZI ASIF AFZAL HASEEB QUAZI ASIF AFZAL HASEEB
Middle Isdair; house no: 111 Middle Isdair; house no: 111
Asif Vila. Asif Vila
P.O : Narayangonj P.O : Narayangonj
P.S : Fatullah P.S : Fatullah
DIST: Narayangaon DIST : Narayangonj
MOBILE: 01781219875,01300722474
E-MAIL: afzal.haseeb2015@gmail.com

Career objective:
To be an expert in various machineries and engines installation, operation
maintenance, fabrication and design. Also willing to work in the marketing sector in any
organization where success comes through creativity, hard work, sincerity and devotion
to duty. Must have to provide a sound environment for work and where I will get
sufficient scope for proofing my talent.

Specialty:
Good interpersonal and communication skills, willingness to work under a
challenging environment, eager to learn new skills and current with new trends and
technologies.

Present job position:


Manager (production) in fresh Cement co. Ltd
Personal Information:

Father s name : Quazi Ali Afzal

Mother’s name : Mrs Dilwara Begam

Nationality : Bangladeshi

Religion : Islam (Sunni)

Date of birth : 6TH November 1976

Marital status : Married

Height : 5.7”

Weight : 70 Kg

Sex : Male

Reference:

1. Husain Ahamed 2. Md.Saiful Alam


( Commissioner)
(Executive Director)
Customs, Excise and VAT
Crown cement Factory Ltd
People’s republic of Bangladesh.
Experience:

1. Appointed as an Asst. Engineer(mechanical) in Dhaka Tobacco Industry, a sister concern of

Akij Group, in 2002 on my provision period

2. Worked as a plant Engineer (mechanical) in Akij Cement co ltd from December 2002 to

February 2005.

3. Appointed as a Deputy Manager (Production) in Akij Cement Co Ltd. From February 2005 to

July 2010.

4.Appointed as a Manager,(production) in Crown cement factory ltd from 2010 to 2014 and

then worked as Asst.General Manager (Operation) in the same factory From February 2015 to

march 2019.

1. Professional A. Workshop and training on using SAP


Training: course (Standard practice and product data analysis) .

B.. Work shop Export & Import Through L/C

C. In plant training programmer on Safety at

cement plant By National Safety Council.

D. Training on ISO 2015, ISO 9001, six Sigma,


LEAN, KPMG, PWC, Leadership, Skill
Communication & Development program.
E. Completed training on Total Quality
Management(TQM) system by Track Training
Institute of IBMI
F. Training On ERP For inventory control
Management & Software.
2. Computer Skills: Microsoft Office,
M.S. Project,
Visual Basic.
3. Last job MI Cement Factory Limited
Experience

a) Position : Asst. General Manager


Duration From 29th Oct ,2015 to 3rd march 2019
Core Production in charge of 11200 MT per day Cement Plant
responsibility
Responsibility ● Make production Planning, Quality assurance with maintaining less
breakdown of machines.
● Preparation of Project Profile
● Preparation of Tender Documents
● To Make all schedules for procurement.
● Inventory Management.
● Monitor the SAP.
● Spare parts budgeting & evaluate the cost center & expenses.
● Evaluate the raw material inventory & forecast the 3 month plan for
Raw material consumption. Evaluate the price guide line to Purchase Raw
materials & spare parts which with considering all standard data of freight &
inflation & give report to management for 3 month projection ( specially
Foreign Purchase)
● Preparation of CPM, Bar Chart and monthly Progress Report.
● Evaluation of the tender & awarded the contract to the competent
tendered.
● Supervision of Erection & Installation of machineries. Implement the work
as per Specifications, Drawing & Design.
● Monitoring the total construction work as a Team Leader.
● To provide technical support to the erection team.
● General Maintenance as well as schedule & preventive.
● Make a target of minimum breakdown & maximum output.
● Plant reliability & ensure the smooth production
b Employer Akij Cement Bangladesh Ltd
Deputy manager(operation & maintenance)
Position
28th October 2002 to 8th march 2010
Duration
● Fly Ash Unloading System through dense phase conveying
Project System. Capacity: 30MT/Hr.
● Warehouse of 3000MT Capacity for fly ash.
● Extension of Packing Area.
c : ● Preparation of Project Profile
Responsibility ● Preparation of Tender Documents
● Evaluation of the tender & awarded the contract to the competent
tendered.
● Preparation of CPM, Bar Chart and monthly Progress Report.
● Coordinate with China Heavy Machinery Corporation regarding
Design & drawing as per process design..
● Supervision of Erection & Installation of all machineries
● Implement the work as per Specifications, Drawing & Design.
● Monitoring the total construction work as a Team Leader.
● To provide technical support to the erection team.
: ● Prepare the maintenance schedule
● Plant reliability & ensure availability of all plant machineries &
auxiliary/ancillary equipment at all time required for smooth
manufacturing operation in order to achieve set production target.
● Specialist input of plant modification & improved operating
efficiency.
● .Maintenance cost reduction.
● Break down elimination & down time reduction.
● Maintaining spares & administration of Technical stores for
mechanical spare parts.
● Arranging plant inspection & maintenance of records including
reporting/feedback on prevailing (If any) substandard condition of
operation, Machine, Maintenance etc.
● Arranging/organizing training of Operators to improve Technical skill.
● Asset care-critical Machinery & equipment, auxiliary equipment,
changing of oils, Crane, Payloader,Dump truck, Truck mounted crane,
Excavator, generator and shore crane.
d) Accomplishment 1. I have completed the installation of a hot gas project to improve the
quality of cement and increase production throughput.

2. Implemented a maintenance programmed to upgrade the existing jetty


equipment to ensure safe and efficient berthing of coaster vessels.

3. Designed and successfully tested a trial fly ash transport system. This
would reduce the handling and product loss during the feeding of the
mill.

4. Designed and supervised the installation of a cement storage godown.


This has improved the quality of stored cement delivered to customers
5. Have reduced the unscheduled stoppage from 15% to less than 1%
through the implementation of proper routine inspection and
predictive maintenance.
b. Maintenance Programme:
Introduced the Master schedule, Daily Work Schedule, Monthly inspection
checklist, Lubrication schedule, Maintenance Key Performance Index, Machine
History Card, Inspection Checklist. Etc. Through this the unscheduled
maintenance has been reduced by more than 5%. Currently the average
unscheduled stoppage is less than 1% from a high of 15%.
2006 Break Down of Mechanical:3.73%
2007 Break down of Mechanical: Average 4%( Due to unavailability of spare
Parts)
C. Budget:
The forecasted prepared in 2005 ,2006,2007,2008 Budget by myself, for the
Mechanical department is well under control. This good control of the budget
was due to the fact that proper maintenance planning was introduced to this plant
by me. Due to the low unscheduled stoppage it is very possible to ensure that
budgets forecasted are properly adhered to.
d. Spare Parts Control:

I am constantly looking at ways to improve on the current situation in


order to achieve “Zero” breakdown.
Currently, I have been appointed to be the Key Person for the
maintenance of spare parts inventory for the maintenance department in
our new Enterprise Resource Planning system.
I am also part of the plant purchasing committee to ensure that good
quality and competitive priced spare parts are sourced and purchased for
the plants.
e) Employer Akij cement co. Ltd
Duration 13th june,2002 to April 2005
Position Plant engineer
Responsibility ● Planned maintenance, preparation & execution of maintenance
schedule for all plant machinery in consultation with respective
sectional head.
● Plant reliability & ensure availability of all plant machineries &
auxiliary/ancillary equipment at all time required for smooth
manufacturing operation in order to achieve set production target.
● Specialist input of plant modification & improved operating
efficiency.
● Maintenance cost reduction.
● Maintaining spares & administration of Technical stores for
mechanical spare parts.
● Organizing archive for all design &* as built drawings, Manuals,
Specification etc and administration of that.
● Break down elimination & down time reduction.
● Arranging plant inspection & maintenance of records including
reporting/feedback on prevailing ( If any) substandard condition of
operation, Machine, Maintenance etc.
● Arranging/organizing training of Operators to improve Technical skill.
● Asset care-critical Machinery & equipment, auxiliary equipment,
changing of oils, Crane, Payloader,Dump truck, Truck mounted crane,
Excavator, generator & shore crane.
● Workshop Management-Design & fabrication of spares in house
especially of non standard items including providing support to
production for emergency Repairs.
● Proving /Ensure support for shift maintenance on as & when
Required.
● Conducting system study using appropriate tools/techniques for need
assessment for balancing, decongestion/planned
modification/maintenance work.
● Project administration & arranging 3P support for meeting emergency
plant maintenance requirements including procurement &
supervision.
● Implementation of autonomous maintenance & TPM
Will Liaison with:
● Materials, Process & Packaging Engineer for production related
issues.
● Electrical & Automation Engineer on Electrical & Automation
Related Issues.
● Commercial Department for commercial control
● Chemist for Quality control & process related issues.
Target ● Minimum 2000000bags@ 50kg of cement per week & 10000MT of bulk
cement per week .
● Ensuring 136 hrs reliability hours of operation of all sections on Weekly
Basis.
● Quantitative Target on Utility consumption, Maintenance expenditure
and down time.
Academic Details:

1. Secondary School Certificate (S.S.C), held in 1991


Secured first Division
Group : science
School : Adarsha School Narayanganj
Board : Dhaka

2. Higher Secondary Certificate (H.S.C), held in 1993


Secured first division
Group : Science
College : Govt. Science College Dhaka
Board : Dhaka

3. B.sc in Mechanical Engineering, held in 2002


Secured Second Class
Institution: CUET, Chittagonj

4. Master of Business Administration (MBA), Major in Marketing


From Stamford University, Secured 1st Class in 2006

I the under -signed, notice that the above information is true, complete and correct. This data
correctly describes my qualifications and myself.

Quazi Asif Afzal Haseeb

You might also like