You are on page 1of 4

RESUME

Shirish J. Thak
Email: shirishthak@gmail.com
Mob: 08888875675 /9511823434

Objective:
To get a Dynamic & Challenging growth oriented Career in manufacturing
organization and at the same time enhance them through with professionals and to facilitate the organizational
growth.

Work Experience:
Presently working with Infra,market As Pan India Head for Manufacturing and Projects for
building materials from Jan 2022 to till date reporting to board of directors.

Company profile: -
1) Currently Working with Infra Market As Head Manufacturing And projects for Building
materials
Responsibilities
1. Erecting and commissioning of AAC blocks and drymix Plants .
2. Looking after supply chain for the products .
3. Contract Manufacturing, Leasing of plants capacities .
4. Cost evaluations of plants for merger /Acquisition.
5. Daily Operations of plants monitoring from Ho .
6. Rm Sourcing for the operation units.
7. Implementation of quality systems at plat level ISO, ,Kaizen ,TPM ,5S
8. Responsibility for Profitability of building material vertical.

2)Biltech Building Elements Ltd – As Plant Head

Responsibility
 Manage day to day Operations in plant.
 Ensure safety and Plant Efficiency
 Responsible for P& L.
 Analyze and submit the performance curves to directors monthly
 Managing Budgets for Capex and opex .
 Ensuring the raw material supply chain against the inventories and specific orders.
 Handling the local, Plant level IR issues .
 Looking after Production, Quality, Maintenance, Dispatches, Accounts , HR & Admin ,Stores And Safety .

3)ECOREX BUILDTECH PVT LTD in an Avant-garde green construction material: “Ecorex” - Aerated Con-
crete Blocks. These blocks are manufactured in a state-of-the-art plant (European Technology) located in Raipur, Chhattis-
garh with an installed capacity of 180,000 CuM. P.A. (450 CuM per day) and adhere to BIS-2185 (III).
Key Performance Area: -
Planning
 ·Planning the complete operations using ERP, integrating SD, MM & PP module, SOP,KRA/KPI (Preparation and
implementation).Overseeing daily Business Operations.
 ·Sales target wise Planning - from Raw Materials to Dispatch
 ·Ensure micro plans from each department/section are prepared and communicated to factory & HO.
 ·Prepare contingency plans if required.
 ·Utilization of machines and manpower. Ensure non utilization losses to zero
 ·To chase materials and sales for raw materials and orders for factory utilization for the required capacity.
 Researching and identifying the growth opportunities
Production Planning & Control
 ·To ensure all production activities are carried out as per plan and rated efficiency of capacity.
 ·To reduce COP by maximum utilization of resources.
 ·Reduction in cycle time from raw material loading to finished goods
 ·Reduction in Fuel, Tools, Manpower and production consumables
Manufacturing Engineering /Projects /CAPEX
 ·To bring low cost automation in factory to improve productivity
 ·To initiate capacity expansion projects, Quotations, comparison and finalization.
 · Creating and managing budgets for OPEX , CAPEX with cost benefit analysis and target Dates.
 ·To improve material movement system in factory to improve productivity.
 - Project Time sheet Preparations and scheduling of activities.
Outsourcing / Job Works
 ·To make cost Vs Time benefit analysis of outsourcing / job works options
 ·To create required vendors/Suppliers/Transporters for outsourcing / job works
Inventory Management
 ·To keep only optimum inventory at plant – incoming and in process and finished
 ·Accountable for stock inventory in excess, non-movable, unutilized, scrap.
Maintenance
 ·Ensure plant and machines are maintained as per the required standards, following 5S & OEE.
 ·Reduction in Maintenance budget by innovative approaches
 ·Machine availability to an extent of 95% on monthly basis, monitoring MTTR & MTBF.
 ·Reduction in Electricity Costs by energy audits. Root cause analysis, Internal and external audits .
 Ensure Preventive Maintenance Schedules, Critical Spares Inventory And Breakdown & Shutdown maintenance
Action Plans.
Quality
 ·All product approvals to be done from customer requirements &as per QAP (Quality Assurance Plan )
 ·3rd party inspections, customer inspections to be done on time with no deviations
 ·Responsible for ISO 9001:2014, EHS ISO 9001:14001 and BIS-2185 P III certification, Internal &external audit
and compliances
 ·Ensure quality is visible in all aspects of operations from materials to dispatch.
 Hands on experience for AAC blocks mix design setup. Raw material selection and smooth working of mix in
manufacturing process.
 Receipe Calculations and set up, Energy VS Time Calculation, Autoclave cycle Setup, Rejection control ,Product
Consistency. Maintenance of standard Deviation in Product properties as Per QAP.
Dispatch
 ·To ensure all customer clearance are received before dispatch
 ·To ensure all documentation / export documentation are carried by plant
 ·To dispatch on time, right quantity and ensure the acceptance from customer
 ·To address all customer issues on dispatch & clearance
 ·Responsible for dispatch till customer acceptance
Design/Engineering/Quality
 ·To keep all design & quality documents of the customer
 ·To address all quality requirements of each order
 Continual improvement in Work Practices .Implementations of new ideas.
 Standard work Practices and good work culture.
Logistics
 ·Optimization of Logistics cost and fleet availability.
 ·To update on Plan Vs actual Daily, Monthly.
 ·No delay on logistics / zero demurrage
Stores & Consumables
 ·To drive cost reduction programs in stores & consumables
 ·To ensure optimum inventory is kept in ware house for uninterrupted product Cycle.
 · Ensure All purchases and expenses are recorded in ERP
 ·The physical stock and SAP stock reconciliation with books on monthly basis
HR / ER / Compliances / Housekeeping
 ·To run the factory operations with the budgeted manpower and following factory act .
 ·To ensure reduction in manpower with innovative approaches.
 ·Evaluating performance and productivity of managers and staff.
 ·To ensure safety of the Employee and Contract manpower on all respect
 ·Hiring Employee and contractor manpower for the required output.
 ·Responsible for factory compliances related to labour, CPCB,CSEB,GST,ESIC,PF Customer etc
 ·5S in each section
 ·To train and develop required skills on continuous basis by doing competency mapping.
 Factory Commercial
 ·Responsible for all expenses to be spent diligently
 To ensure all documentation required are properly maintained and recorded.
 Ensure the Security in Factory Premises. Also trained People for Emergency Plans.

4) Formerly working with BILTECH BUILDING ELEMENTS LTD, AAC Palghar Maharashtra.
Period: - Sept 2012 to March 2015 As Maintenance Head.
Job Responsibilities:
 Looking after Boiler Operations And Maintenance of AAC plant machineries like batching plant, cutting
machines, Tilting cranes, autoclaves, agitators, Screw feeders, DG sets and forklifts.
 Established strong Preventive maintenance system which leads to increase in Productivity of equipments.
 To exercise control over the daily consumption of utility items and track variances on a periodic basis in produc -
tion.
 Annual budget preparation for engineering consumables and capital goods.
 Monitor and control the budget Vs actual.
 Technical and statistical calculation for the OEE and Breakdowns.
 Leading a team of executives of electrical, automation and mechanical departments.
 To initiate and drive energy cost reduction projects to realize the budgeted Total Delivered Cost savings.
 Ensure safety compliance to new EHS guidelines in regular plant maintenance as well in Capex projects.
 Assessment of Hazards and identification of Critical Elements
 Unique identification, classification and registration of critical equipments.
5) Formerly working with GRAPHITE INDIA LTD, GE Division. NASHIK.
Job Responsibilities:
 Analysis of equipments performance and spare parts in the dept.
 Experience in the heavy machinery like chain bucket elevator, duel roller crusher, morgenson screen, eirish mixer,
alpine mill, hammer mill, Isostatic press, autoclaves, compressors and vacuum devices.
 Working in core team of dept for implementation of EMS 14001 and maintain the entire document for EMS
audit.
Details of work experience:
1) Experience in operation and maintenance of hydraulic press as 800t, 500t, 300t, 150t, and Isostatic press.
2) Experience in operation and maintenance of oil-fired furnace, PLC controlled furnaces and burners ThermoPac.
3) Experience in erection and commission of ETS Plant, 3MVA transformers, elevators and material conveying systems.
4) Handled the project of relocation of AX(Anti oxidation Acid treatment ) Plant from Bangalore to Nashik, independently.
5) Handle the project of erection of scrubber system, pulse jet dust collectors.
6) Handled the project of DC Graphite tube furnace erection and commissioning.
6) Experience in operation and maintenance of electrical transformers and HVAC circuits, EOTC (1mt-60mt),Distribution
Panels, Control And power circuits .Also hands on experience in centrifugal pumps,blowers,vacuum devices, Hydraulic ckts
7) Familiar with SAP MM/PP/PM module, as a super user.
8) Experience in budget preparation and capitalization of new equipments, cost estimation for projects and for maintenance
work, Maintenance budget monitoring & controlling.
6) Astral Glass Pvt Ltd.Igatpuri Nashik.
Period: 10-05-2006 to 4 sept 2006 Designation: Trainee Engineer
Profile: -Glass manufacturing interested in manufacturing of designer perfumes glass bottles. I was working in mould
manufacturing workshop which consist of lathe machines, milling machine, pentagraphs and special machines for bottles
die manufacturing.
7) Precision Engineering Industries, Nashik.
Period: 2-10-2005 To 10-05-2006. Designation: Production Supervisor.
Profile: - Automobile ancillary having work interest in automotive seat frame fabrications, fixtures and Dies. Handled
shop floor activities like production planning, manpower distribution, stock status, Daily dispatch shipments.
Education:
 Completed B.E.in“Mechanical Engineering “from V.Y.W.S. College of Engineering Badnera,
Amaravati University with an aggregate of 64.79 % and degree of 70.85%. In 2001-2005.
 Completed H. S. C from Jagruti junior college with 72.00%. In 1999-2001.
 Completed S. S. C from Bharat vidhylaya with 69.20% in 1998-99.
 Completed full time training course of SAP MM ECC 6.0 module from Siemens Bangalore.
Total Emoluments: Rs 18 lacks PA + perks.
Notice Period: - 30 days /1 month
Personal Profile:
Passport No. : F8598926. Date of Birth: 29th July 1983.
Sex: Male Marital Status: Married
Language of dialects: English, Hindi, and Marathi. Reference: - Available on Request
Present Address:
505, A10- Rutu Enclave ,Anand Nagar ,Thane MH..
Permanent Address:
Asara Niwas, Sudhir colony, Akola.Maharashtra 444001.
Declaration
I consider myself familiar with “Mechanical Engineering” aspects. I am also confident of my ability to work in a
team. I hereby declare that the information furnished above is true to the best of my knowledge.

SHIRISH J. THAK

You might also like