You are on page 1of 5

Asad Ali

Address: R--96, Sector- A, Sadate Amroha Cooperative Housing Society, Karachi.


Mobile Number: + 92 - 342–2638455
E-mail: engrmay90@gmail.com

OBJECTIVE
To utilize my technical and management skills for achieving the target and developing the best
performance in the organization. I would like to implement my innovative ideas, skills and creativity for
accomplishing the projects.

CORE STRENGTHS & ENABLING SKILLS


• Project Management • Production Engineering • Client Relationship Skills
• Team Working Skills
• Plant Maintenance • Inventory Management
• Decision Making Skills
• Process Engineering • Analytical Skills
.

PROFESSIONAL EXPERIENCE
Ronin Mobile Accessories, Karachi Pakistan

Working as “Manager Plant Maintenance”, (16-Dec-2021 Till Now)

Responsibilities/Accomplishments:

 As Manager Plant Maintenance Department i am leading a team including DM,AM and supervisor
allocated in different sections for maintenance facility, Report directly to Plant Manager and dotted line
reporting to the CEO for maintenance related activities.
 I am responsible for the overall availability and smooth operations & maintenance of machines in all
aspects.
 Manage and plan smooth and proper functioning of daily maintenance activities and done participating in
troubleshooting of breakdowns.
 Communicating System faults and malfunctions to principles to get them fixed in time.
 Develop and implement preventive maintenance plan of all machines for the year.
 Manage teams for proper corrective maintenance of machines and done trouble shooting of various
faults.
 Develop inventory o of critical parts of all machines as per SOP stock for the minimizing the breakdown.
 Introduce and develop TPM for different production lines and assembly lines.
 Propose upgrades and system enhancing renovations
 Presented and establish the budget for year for Maintenance Department.
 Ensure routine calibration and maintenance requirements of a variety of electro-mechanical, hydraulic
and pneumatic systems,panels,LV and HV,motors,generators, Compressor,Laser printing machine etc.
 Implement cost reduction activities for continuous improvement.
 Make RCA for critical breakdowns and provide training to the team for minimizing accident and
breakdown.
 Maintain log of fault history to minimize downtime of machines and done analysis by Pareto .
 Motivate team members for the completion of jobs.
 Ensuring compliances with health and safety
 .
GeoLinks Private Limited, Karachi Pakistan

Working as “Manager Plant Maintenance”, (March ’18 to 15-Dec-2021)

Responsibilities/Accomplishments:

 As Manager Plant Maintenance Department i am leading a team including 2 supervisor allocated in


different sections for maintenance facility, Report directly to General Manager for maintenance related
activities.
 I am responsible for the overall availability and smooth operations & maintenance of Incinerator plant in
all aspects.
 Manage and plan smooth and proper functioning of daily maintenance activities.
 Responding to the breakdowns.
 Manage teams for proper corrective maintenance of machines.
 Propose upgrades and system enhancing renovations
 Communicating System faults and malfunctions to principles to get them fixed in time.
 Ensuring compliances with health and safety.
 Implement the documented procedure and PFC as per ISO 9001:2008
 Responsible for Understanding and execution of ISO 9001 audit
 Motivate team members for completion of job.
 Presented and establish the budget for year for Maintenance Department.
 Implement cost reduction activities.
 Develop operation instructions and equipment’s (Burners, Blowers, ID Fans, Panels) specifications.
 Ensure routine calibration and maintenance requirements of a variety of electro-mechanical, hydraulic
and pneumatic systems are undertaken.
 Set department objectives/KPIs and review and assess ongoing performance of direct reports

Alsons Auto Parts, Karachi, Pakistan


Working as “Assistant Manager Plant Maintenance”, (Feb’14 –March ’17)

Responsibilities/Accomplishments :

 As Assistant Manager in Plant Maintenance Department leading a team of 27 members including 5


supervisors allocated in different sections for maintenance facility, Report to Maintenance Manager for
Maintenance work and directly to General Manager for related activities.
 I am responsible for the overall availability and smooth operations & maintenance of
machines in all aspects.
 Manage and plan smooth and proper functioning of daily maintenance activities.
(control and monitoring).
 Responding to the breakdowns.
 Manage teams for proper corrective maintenance of machines.
 Plan timely maintenance schedules.
 Propose upgrades and system enhancing renovations
 Communicating System faults and malfunctions to principles to get them fixed in time.
 Correspondences with Spot purchase Department for the solution of Critical item lists and
accurate purchasing.
 Ensuring compliances with health and safety.
 Monitoring and managing Optimized spare parts handling for maintenance department.
 Plan & Ensure overall Preventive Maintenance activities.
 Creating maintenance procedures
 Motivate team members for completion of job.
 Presented and establish the budget for year for Maintenance Department.
 Responsible for Understanding and execution of ISO 9001 audit.
Additional Responsibilities(As a Production Engineer):

 Provide engineering support for production and maintenance activities to increase production.
 Perform engineering analysis to reduce downtime.
 Evaluate current production and make recommendation for improvement.
 Implement cost reduction activities.
 Develop operation instructions and equipment’s specifications.
 Provides training and guidance to the team members to accomplish production goals.
 Identify unsafe operations.
 Develop best practices to increase production capax, quality and reliability.
 Implement the documented procedure and PFC as per ISO 9001:2008
 Motivate team members for completion of job.
 Presented and establish the budget for year for Maintenance Department.
 Responsible for Understanding and execution of ISO 9001 audit.

PROJECTS
• Pole Magnet Project
• Installation of new Assembly lines for production.
• Assembly lines Shifting
• Installation Of scrubber and cooling chambers
• Extension of chimneys

TRAININGS

 Attend training at PIM(Pakistan Institute Of Management)

Critical Drivers Of Success For Managers.

INTERNSHIP EXPERIENCE
FFBL(Fuji Fertilizers Bin Qasim Limited. Pakistan Steel Mills
Worked as “MaintenanceIntern” Worked as “ Intern”
Time Period:(2-July-27 July’12) Time Period:(18 Jan-6Feb’12)

PMDC(Pakistan Meteorological Department)


Worked as “ Intern”
Time Period:(17Sep-12Oct’12)

FINAL YEAR PROJECT

Prepare Final Year Project “MICROCONTROLLER BASED FIREFIGHTINGROBORT”

PROFESSIONAL QUALIFICATION

 Iqra University Karachi Pakistan(2015-2018) MBA Supply Chain Management And Logistics.
 Hamdard University of Engineering & Technology Karachi , Pakistan (2009 -2013)
B.E Electrical

You might also like