Professional Documents
Culture Documents
ENGINEERING COLLEGE
TJS Nagar, Peruvoyal, Near Kavaraipettai, Gummidi Pundi-601206
Description Marks
Presentation* 10
Viva* 20
Handout 10
Guide (evaluation of the work
10
from previous review to present review)
Total Marks 50
Allocation of
Review Weightage Total
Marks
I 50 20 20
II 50 20 20
III 50 20 20
IV 50 20 20
Report Preparation* 20
*Report marks will be awarded by HoD on the basis of the recommendation of Individual
Supervisor
T.J.S. ENGINEERING COLLEGE
TJS Nagar, Peruvoyal, Near Kavaraipettai, Gummidi Pundi-601206
Department of Computer Science and Engineering
CS8811-Project Work
Project Work - Review Evaluation form
Review: _________ Date:______
Batch ID/ Title of the Project Date /Time of Review
Batch Members 1.
2.
3.
4.
Work completed
Work to be presented
Work to be completed
Remarks(by the
supervisor)
Signature of the
supervisor with date
Evaluation criteria Member 1 Member 2 Member 3 Member 4
Total
Remarks