You are on page 1of 1

 

Review No Dates Works to be completed/Evaluation  criterion

Zeroth Review 04/01/2021 1.Title of the project.


2.Abstract (250 words) .
3.Existing System and Proposed System.
4. Details about the tools to be used for the project implementation.
5.Base paper and journal details of Base Paper .

First Review 25/01/2021 1. Literature survey (min 15 papers)


2. System Architecture
3 UML modeling/ ER diagram
4.  Module description (min 2- max 4)
5.  Database design
6.Individual dataflow diagram for each module
 
Second Review 8/02/2021 1.  Implementing the Corrections
2.  Modules Demo (50% to be completed)
 
Third Review 22/02/2021 1.Implementing the corrections
2.Project Demo and Testing
3.Submit the rough draft  of the project
 
Fourth  Review 11/03/2021 1.Final demo
2.Final power point presentation
3.Final report submission
T.J.S. ENGINEERING COLLEGE
TJS Nagar, Peruvoyal, Near Kavaraipettai, Gummidi Pundi-601206

Department of Computer Science and Engineering


CS8811-Project Work
Important Dates

You might also like