You are on page 1of 1

Plumbing Checklist

Slab Rough
♦ Plans on Jobsite (Com) ♦ Plans on Jobsite (Com)
♦ Water Test ♦ Water Test
♦ Minimum Grade ♦ Minimum Grade
♦ Proper Fittings ♦ Proper Fittings
♦ Proper Waste Pipe Sizing ♦ Proper Waste Pipe Sizing
♦ Proper Venting ♦ Proper Venting
♦ Minimum Coverage ♦ Minimum Fixture Clearances
♦ Clean Outs ♦ Clean Outs’s
♦ Pipe Support ♦ Pipe Protection
♦ Proper Water Pipe Sizing ♦ Pipe Support
♦ Proper Water Pipe Installation ♦ Seismic Requirements (Com)
♦ Foundation/Slab Sleeving
Water Distribution
♦ Pressure Test
♦ Proper Fittings
♦ Proper Water Pipe Sizing
♦ Pipe Protection
♦ Pipe Support/Anchoring
♦ Unconditioned Space/Insulate
♦ Backflow Requirements

Final/CO Sewer Service


♦ Pressure Reducing Valve? ♦ Minimum Size
♦ Proper Fixtures (Com/Res.) ♦ Minimum Grade
♦ Fixtures Level & Secure ♦ Minimum Depth/Protection
♦ Minimum Fixture Clearances ♦ Minimum Clean Outs
♦ Handicap Requirements ♦ Clean Outs to Grade
♦ Clean Outs to Grade ♦ Support/Foreign Material
♦ Water Heater Complete
♦ T&P/Pan Drains
♦ Backflow Requirements Water Service
♦ Unconditioned Space/Insulate ♦ Minimum Size
♦ Misc. Equipment Complete ♦ Minimum Depth/Protection
♦ Water Heater Complete ♦ Support/Foreign Material
♦ T&P/Pan Drains ♦ Foundation Sleeve
♦ Backflow Requirements ♦ Meter Connection
♦ Unconditioned Space/Insulate ♦ Backflow Requirements
♦ Misc. Equipment Complete
TCO
♦ Minimum Fixtures (Res.)
♦ Restrooms Complete (Com)
♦ SW/WS Complete (ALL)
♦ Roof Drains Complete
♦ Backflow Requirements

You might also like