Concrete Ingredients 
 Cement
 Aggregate
 Sand
 Water
 Admixture (Plasticizer)
Concrete Properties
 Slump 150 to 200 mm
 Temperature 32 degree C (!!)
 W/C Ratio
 M25
 Self Compacting
 Free flowing
 Scouring the bentonite cakes
 No inclusions of foreign material
 Concreting Procedure
 Underwater ( Under Drilling fluid/Bentonite)
 Through Tremie pipes
 Trimie pipe should always be inside the concrete once 
started.

 VID_20150328_111605.3gp
Theoretical line Tremie pipes
Workout 1

 A pile constructed at Judi Bridge on Biratnagar Rangali
Road has following details.
 GL Platfarm level = 0 m
 Casing length = 3 m below ground level
 Cutoff level = 4 m below ground level
 Toe of pile is 28.3 m below ground level.
 Show these points  in a graph sketch.

 Up to what level, the concrete needs to be done?
Workout 1 contd
 How much concrete is required to fill the bore hole 
theoretically?
 How much tremie is required to be installed
 Draw a theoretical line of depth  of concrete surface–
volume of concrete poured (D‐V). Take the weight of  
cement 400 kg / m3 of the approved mix.
 The depth measured after pouring concrete are as follows:
 After 10 bags = 25 m below casing level
 After 20 bags = 21 m below casing level
 After 30 bags = 16 m below casing level.
 Show these points in the graph
Work out 2
 Plateform level RL = 97.5 m
 Cut off level RL = 94.0 m
 Toe level RL = 69.2 m.
 Upto what level concrete shall be done?
 Good concrete level  RL = ?
Work Out 2
 Mix design = 400 kg/m3
 Volume of concrete per bag of cement batch = 0.125 
m3
 Pile depth = 28.3 m below Platform level
 Pile depth = 24.5 m below Cutoff level
Volume of concrete Depth of  concrete surface
0 bag Depth = 28.3 m
10 bags 25 m
20 bags 20 m
30 bags 15 m
40 bags 10 m
50 bags