UMRI BYPASS ALIGNMENT OPTIONS

START OF OPTION-3

7)
-10
Gortha CH:0+000

(AU
To Mu
dkhed 0
Railway LC A (AU-10
6)

kar
START OF OPTION-2 100

Bho
CH:0+000 115
87.
+1
=0
PC
200

To
To 5
.23

Mu DETAILS-A 259
=0+
PT

d kh UMRI TOWN BUILT-UP AREA UMRI ROB @ LC C


300
ed VUP@CH:0+300

(A U VU
-10 RA O N 400
P@C
6) ILW Venkateshnager
T I
START OF OPTION-1 AY TA 500 ROB@CH:0+495 H:1
YS
LIN +04
CH:0+000 E A 0
W
0
60 3
.59 To K
L
552

ark
AI
=0+
TS

Rai heli

00
IR
3
.59
lwa

7
12

2
2.0
+6
=0
yL
MR

83

0
SC
CC

0+

44
80
02

.0
=
2.

73
0 0+89

TS
U RO

+6
44

=0
90 C =

3.0
B@C

CS
S

73
0+ =
Railway LC B

ST
87
988.7
CS =
0+
H:1
1000
+20
7
ST =1+048
.78

1100
0

UMRI TOWN BUILT-UP AREA

CURVE DETAILS OPTION-3

-3
HORIZONTAL CURVE DETAILS HIP CH: 0+211.573

5
95
CURVE NUMBER 1
OPTIO

ON
RADIUS (m) 250
N-1

3+
CURVE LENGTH (m) -

TI
TOTAL

H
TRANSITION LEADING (m) 90

OP
LENGT

T
LENGTH (m) TRAILING (m) 90

NG
H 3+700 SUPERELEVATION (e%) 7.0

LE
DESIGN SPEED (KMPH) 80
END OF OPTION-1
CH:3+700 CURVE DETAILS OPTION-3

AL
HORIZONTAL CURVE DETAILS HIP CH: 0+570.703

T
CURVE NUMBER 2

TO
RADIUS (m) -250

ToKa
CURVE LENGTH (m) - CURVE DETAILS OPTION-3

TRANSITION LEADING (m) 90 HORIZONTAL CURVE DETAILS HIP CH: 1+750.020

ligaon LENGTH (m) TRAILING (m) 90 CURVE NUMBER 4


Umri - Ba

regao
SUPERELEVATION (e%) 7.0 RADIUS (m) 700

DESIGN SPEED (KMPH) 80 CURVE LENGTH (m) -


TRANSITION LEADING (m) 70

n(AU
no
LENGTH (m) TRAILING (m) 70

ga
SUPERELEVATION (e%) 5.0

ale

-1
DESIGN SPEED (KMPH) 100

07)
LEGEND:
-T
ri CURVE DETAILS OPTION-3 CURVE DETAILS OPTION-3
UMRI ROB AT LEVEL OPTION - 2
Um

HORIZONTAL CURVE DETAILS HIP CH: 0+951.271 HORIZONTAL CURVE DETAILS HIP CH: 3+614.784

*FOR DISCUSSION ONLY


CROSSING "C
CURVE DETAILS OPTION-2 CURVE NUMBER 3 CURVE NUMBER 5
OPTION-1 RADIUS (m) 250 RADIUS (m) 250
HORIZONTAL CURVE DETAILS HIP CH:2+208.255
OPTION-2 TOTAL LENGTH 4+ CURVE LENGTH (m) - CURVE LENGTH (m) -
OPTION-3
CURVE NUMBER
RADIUS (m)
1
1000
500 TRANSITION LEADING (m) 90 TRANSITION LEADING (m) 90

MAJOR ROAD CURVE LENGTH (m) - LENGTH (m) TRAILING (m) 90 LENGTH (m) TRAILING (m) 90

TRANSITION LEADING (m) 50 SUPERELEVATION (e%) 7.0 SUPERELEVATION (e%) 7.0


RAILWAY LINE
LENGTH (m) TRAILING (m) 50 END OF OPTION-2 END OF OPTION-3 DESIGN SPEED (KMPH) 80 DESIGN SPEED (KMPH) 80

RIVER SUPERELEVATION (e%) 5.00 CH:4+500 CH:3+955


DESIGN SPEED (KMPH) 100

BUILT-UP LOCATION

CLIENT : CONSULTANT : PROJECT : DRAWING TITLE : SCALE ON A2


Horizontal 1:2000

01
DRAWING NUMBER:- VASUPRADA/492/HIG/OPT/ DATE
DRAWN DESIGNED CHECKED APPROVED
16-10-2020
OCT 2020 R0 FIRST SUBMISSION -
DATE No BY REV : R-0
HORIZONTAL CURVE DETAILS HIP CH:0+223.178
CURVE NUMBER 1
RADIUS (m) -2500
CURVE LENGTH (m) 72.120
To Mu
dkhed HIP EASTING (X) 779251.748
(AU-10
6) CO-ORDINATE NORTHING (Y) 2107945.819
0
TRANSITION LEADING (m) 0
LENGTH (m) TRAILING (m) 0
SUPERELEVATION (e%) 0
DESIGN SPEED (KMPH) 100 100

)
107
AU-
115
87.

(
+1
=0

kar
PC
200

Bho
To
35
2 5 9.2
0+ =
PT

300
VUP@CH:0+300

400 To K
ark
heli
UMRI TOWN BUILT-UP AREA
500 ROB@CH:0+495

Railway LC C
0
60 93
0 + 552.
5
=
TS

0
3

0
.59

7
2

.02
61
0+

32
=

0
SC

8
5

0+

44
0
2
HORIZONTAL CURVE DETAILS HIP CH:0+643.051

.0

0
=

3.
2
89

7
CURVE NUMBER 2

+6
+

44
=0

0
RADIUS (m) 200

=
3.0
SC
0

CS
3
0 CURVE LENGTH (m) 60.451

+7
9

0
HIP EASTING (X) 779083.959

T=
CO-ORDINATE NORTHING (Y) 2107561.369

S
8.78
7 TRANSITION LEADING (m) 60
98
=0+ CS LENGTH (m) TRAILING (m) 60
1000 SUPERELEVATION (e%) 5.56%

HORIZONTAL CURVE DETAILS HIP CH:0+941.606 DESIGN SPEED (KMPH) 50

87 CURVE NUMBER 3
48.7
ST =1+0 RADIUS (m) -180
LEGEND:

*FOR DISCUSSION ONLY


UMRI ROB AT LEVEL CURVE LENGTH (m) 96.762
CROSSING "C 1100 HIP EASTING (X) 778844.531
OPTION-1 CO-ORDINATE NORTHING (Y) 2107383.444
OPTION-2 TRANSITION LEADING (m) 60
MAJOR ROAD LENGTH (m) TRAILING (m) 60
RAILWAY LINE SUPERELEVATION (e%) 6.17%
RIVER DESIGN SPEED (KMPH) 50

BUILT-UP LOCATION

CLIENT : CONSULTANT : PROJECT : DRAWING TITLE : SCALE ON A2


UMRI BYPASS ALIGNMENT OPTIONS & Horizontal 1:2000
(DETAIL-A)
DRAWING NUMBER:- VASUPRADA/492/HIG/OPT/
02 DATE
DRAWN DESIGNED CHECKED APPROVED
16-10-2020
OCT 2020 R0 FIRST SUBMISSION -
DATE No BY REV : R-0
PROPOSED RIGHT OF WAY 30000
CL OF PROPOSED CARRIAGEWAY
1000 1500 1500 1000
3500 3500

SHOULDER

SHOULDER

SHOULDER
EARTHEN

EARTHEN
CARRIAGEWAY CARRIAGEWAY

SHOULDER

PAVED

PAVED
'V' DRAIN 'V' DRAIN
ROW LIMIT

ROW LIMIT
1000 3.0% 2.5% 2.5% 3.0% 1000
1 1
CATCH WATER 1 1 CATCH WATER
DRAIN DRAIN

BITUMINOUS CONCRETE - 40mm


DENSE BITUMINOUS MACADAM - 60mm
WET MIX MACADAM - 250mm
GRANULAR SUBBASE - 200mm
SUBGRADE - 500mm

TCS-1:-EXISTING 2 LANE RECONSTRUCTION AND WIDENING TO 2LANE CONCENTRIC


(CUT SECTION)

UMRI BYPASS
PROPOSED RIGHT OF WAY 30000

7000
2000 1500 VARIES VARIES 1500 2500 2500 1500 VARIES VARIES 1500 2000
CARRIAGE WAY

EARTHEN DRAIN
SHOULDER

SHOULDER
TOE BERM

TOE BERM
EARTHEN DRAIN

SHOULDER

SHOULDER
EARTHEN

EARTHEN
CORRIDOR

CORRIDOR
PAVED

PAVED
UTILITY

UTILITY
PROPOSED CL

150MM THK.
GRANULAR MATERIAL
ROW LIMIT

ROW LIMIT
150MM THK.
SELECTED EARTH GRANULAR MATERIAL

3.0% 2.5% 2.5% 3.0% SELECTED EARTH


2 2
1 1
G.L G.L

BITUMINOUS CONCRETE - 40mm


DENSE BITUMINOUS MACADAM - 60mm
WET MIX MACADAM - 250mm
GRANULAR SUBBASE - 200mm
SUBGRADE - 500mm

TCS -2 : CARRIAGEWAY WITH PAVED SHOULDER REALIGNMENT


(Open Country - Plain & Rolling Terrain)

UMRI BYPASS
40000

300 1500 500 2000 2000 500 1500 300


7000
CARRIAGEWAY

FOOTPATH

FOOTPATH
SHOULDER

SHOULDER
BARRIER

BARRIER
PAVED

PAVED
CRASH

CRASH
HAND RAIL HAND RAIL
PROPOSED CL

2200 1000 1000 2200


1500 7500 7500 1500

CORRIDOR
CORRIDOR

LHS SERVICE ROAD RHS SERVICE ROAD

UTILITY
UTILITY

DRAIN DRAIN

ROW LIMIT
RE WALL BITUMINOUS CONCRETE - 40mm RE WALL
ROW LIMIT

DENSE BITUMINOUS MACADAM - 80mm

WET MIX MACADAM - 250mm


GRANULAR SUBBASE - 200mm
SUBGRADE - 500mm

2.5% 2.5%

G.L G.L

RCC Drain RCC Drain


BITUMINOUS CONCRETE - 40mm (VG40) BITUMINOUS CONCRETE - 40mm (VG40)
DENSE BITUMINOUS MACADAM - 50mm (VG40) DENSE BITUMINOUS MACADAM - 50mm (VG40)

WET MIX MACADAM - 250mm WET MIX MACADAM - 250mm


GRANULAR SUBBASE - 200mm GRANULAR SUBBASE - 200mm
SUBGRADE - 500mm
TCS-3 : ROB APPROACH FOR 2 LANE HIGHWAY SUBGRADE - 500mm

UMRI BYPASS
40000
15600
300 1500 500 2000 2000 500 1500 300
7000
CARRIAGEWAY

FOOTPATH

FOOTPATH
SHOULDER

SHOULDER
BARRIER

BARRIER
PAVED

PAVED
CRASH

CRASH
HAND RAIL HAND RAIL
PROPOSED CL

RE WALL RE WALL

ROW LIMIT
BITUMINOUS CONCRETE - 40mm
ROW LIMIT

DENSE BITUMINOUS MACADAM - 80mm

WET MIX MACADAM - 250mm


GRANULAR SUBBASE - 200mm
SUBGRADE - 500mm

G.L G.L

TCS-4 : AT ROB FOR 2 LANE HIGHWAY (15.6m Deck) CHAINAGE:


0+840 & 6+830

UMRI BYPASS
DATE
OCT 2020
R0
No
DESIGN CHAINAGE
DATUM-317.0M

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
EXISTING GROUND LEVELS
Chainage=0.000m
0 395.174 395.350 Level=395.350m
10 395.004 395.500
20 395.033 395.650
30 394.879 395.800
40 394.667 395.950

FIRST SUBMISSION
50 394.489 396.100
60 394.371 396.250
70 394.233 396.400

G=1.500
80 394.050 396.550

L=130.555m
90 393.902 396.700
100 393.741 396.850

L=187.115m
110 393.547 397.000
120 393.337 397.150
130 393.129 397.300 Chainage=130.555m

-
Level=397.308m

BY
140 392.942 397.443
150 392.751 397.570
160 392.561 397.682
170 392.376 397.778
180 392.194 397.859

CLIENT :
190 392.029 397.924
200 391.862 397.973
210 391.702 398.006
220 391.569 398.024

L=160.000m
R=-6394.672m
230 391.455 398.027

L=72.120m
240 391.350 398.013

R=-2500.000m
250 391.286 397.984
260 391.244 397.940
270 391.194 397.880
280 391.150 397.804
290 391.048 397.712 Chainage=290.555m
Level=397.707m
300 390.677 397.612 VUP
310 390.274 397.512
320 391.014 397.412
330 390.998 397.311
340 390.932 397.211
CROSS ROAD
LVL-391.237m

350 390.869 397.111


360 390.845 397.011
370 390.869 396.911
380 390.833 396.810

CONSULTANT :
390 390.811 396.710
400 390.787 396.610
410 390.723 396.510
420 390.601 396.409

L=293.358m

G=-1.002
L=244.805m
430 390.499 396.309
440 390.362 396.209
450 390.011 396.109
460 389.169 396.009
470 389.001 395.908
480 388.678 395.808
490 386.828 395.708
500 386.808 395.608 ROB
510 386.860 395.508
RAIL TOP

520 387.034 395.407


LVL-386.576m

530 387.230 395.307 Chainage=535.359m


540 387.425 395.203 Level=395.254m
550 387.621 395.069

PROJECT :
560 387.817 394.900
570 388.013 394.695
580 388.087 394.455
590 387.903 394.179
L=85.000m
L=60.000m

R=-2835.302m

600 387.980 393.869


610 388.239 393.523
Chainage=620.359m
620 388.261 393.142
Level=393.128m
630 388.022 392.742
640 387.639 392.342
650 387.204 391.942
L=60.451m
R=200.000m

660 387.276 391.542


DETAILS-A UMRI ROB @ LC C PROFILE OPTION-1

670 387.283 391.142


680 387.109 390.742
690 386.855 390.342
700 386.584 389.942
710 386.468 389.542
L=60.000m

720 386.507 389.142


730 386.365 388.742
740 386.156 388.342
750 385.778 387.942
760 385.361 387.542
770 385.099 387.142
G=-4.000

780 384.858 386.742


L=295.827m
HORIZONTAL CURVE DETAILS HIP CH:0+223.178

790 384.886 386.342


L=98.980m

800 384.694 385.942


810 384.713 385.542
820 384.502 385.142
830 384.245 384.742
840 384.161 384.342
850 383.570 383.942
860 383.267 383.542
870 383.089 383.142
L=60.000m

880 382.698 382.742


890 382.352 382.342
900 381.961 381.942
910 381.560 381.542 Chainage=916.186m
DRAWN

920 381.085 381.141 Level=381.295m


930 380.619 380.727
940 380.168 380.296
950 379.704 379.850
L=96.762m

DRAWING TITLE :
R=-180.000m

960 379.083 379.387


970 378.533 378.908
DESIGNED

980 378.011 378.413


990 377.494 377.902
L=125.000m
R=-6188.777m

1000 376.983 377.374


1010 376.485 376.831
1020 376.024 376.271
DETAILS-A UMRI ROB @ LC C

CHECKED

1030 375.532 375.695


L=60.000m

Chainage=1041.186m
DRAWING NUMBER:- VASUPRADA/492/HIG/OPT/03

1040 375.007 375.103


Level=375.032m
1050 374.465 374.502
UMRI BYPASS ALIGNMENT PROFILE OPTION-1 &

1060 373.885 373.900


1070 373.251 373.298
1080 372.575 372.696
G=-6.020

APPROVED
L=61.502m
L=53.901m

1090 371.898 372.094


1100 Chainage=1102.688m
1102.688 371.375
371.241 371.492
371.330
Level=371.330m
SCALE ON A2

DATE
Horizontal 1:2000

REV : R-0
16-10-2020

*FOR DISCUSSION ONLY


DATE
OCT 2020
R0
No
DESIGN CHAINAGE
DATUM-317.0M

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
EXISTING GROUND LEVELS
0 395.174 395.350 Chainage=0.000m
10 395.004 395.564 Level=395.350m
20 395.033 395.778
30 394.879 395.992
40 394.667 396.206

FIRST SUBMISSION
G=2.141
50 394.489 396.420

L=77.203m
60 394.371 396.635
70 394.233 396.849
Chainage=77.203m
80 394.050 397.062 Level=397.003m
90 393.902 397.263
100 393.741 397.448

L=187.115m
110 393.547 397.616
120 393.337 397.768
130 393.129 397.903

-
BY
140 392.942 398.021
150 392.751 398.123
160 392.561 398.209
170 392.376 398.278
180 392.194 398.330

CLIENT :
190 392.029 398.366
200 391.862 398.385
210 391.702 398.388
220 391.569 398.374
230 391.455 398.344

L=280.000m
R=-6047.786m
L=72.120m
240 391.350 398.297

R=-2500.000m
250 391.286 398.234
260 391.244 398.154
270 391.194 398.057
280 391.150 397.944
290 391.048 397.815
300 390.677 397.669 VUP
310 390.274 397.506
320 391.014 397.327
330 390.998 397.131
340 390.932 396.919
CROSS ROAD
LVL-391.237m

350 390.869 396.690


Chainage=357.203m
360 390.845 396.446 Level=396.515m

L
Chainage=369.775m
370 390.869 396.197 Level=396.203m

G=-2.489
380 390.833 395.964

CONSULTANT :
390 390.811 395.763
400 390.787 395.592
410 390.723 395.453
420 390.601 395.345

L=293.358m

L=80.000m
R=3214.220m
430 390.499 395.268
440 390.362 395.222
Chainage=449.775m
450 390.011 395.207 Level=395.207m
460 389.169 395.207
470 389.001 395.207
480 388.678 395.207
490 386.828 395.207
500 386.808 395.207 ROB
510 386.860 395.207

G=0.000
RAIL TOP

L=104.150m
520 387.034 395.207
LVL-386.576m

530 387.230 395.207


540 387.425 395.207
550 387.621 395.207 Chainage=553.925m
Level=395.207m

PROJECT :
560 387.817 395.202
570 388.013 395.172
580 388.087 395.116
L=60.0

590 387.903 395.033


00m

600 387.980 394.923


610 388.239 394.786
620 388.261 394.623
630 388.022 394.433
640 387.639 394.216
650 387.204 393.972
L=60.451m
R=200.000m

L=180.000m

660 387.276 393.702


R=-3737.315m

670 387.283 393.404


DETAILS-A UMRI ROB @ LC C PROFILE OPTION-2

680 387.109 393.080


690 386.855 392.730
700 386.584 392.352
L=60.00

710 386.468 391.948


0m

720 386.507 391.517


730 386.365 391.059 Chainage=733.925m
740 386.156 390.580 Level=390.872m
750 385.778 390.098
760 385.361 389.616
770 385.099 389.135
780 384.858 388.653
HORIZONTAL CURVE DETAILS HIP CH:0+223.178

790 384.886 388.172


L=98.980m

800 384.694 387.690


810 384.713 387.208
820 384.502 386.727
G=-4.816
L=160.716m

830 384.245 386.245


840 384.161 385.763
850 383.570 385.282
860 383.267 384.800
L=60.0
0

870 383.089 384.319


0m

880 382.698 383.837


890 382.352 383.355 Chainage=894.641m
900 381.961 382.872 Level=383.132m
910 381.560 382.380
DRAWN

920 381.085 381.878


930 380.619 381.366
940 380.168 380.844
950 379.704 380.312
L=96.762m

DRAWING TITLE :
R=-180.000m

960 379.083 379.770


970 378.533 379.217
L=120.000m

DESIGNED
R=-9970.973m

980 378.011 378.655


990 377.494 378.083
1000 376.983 377.501
1010 376.485 376.908 Chainage=1014.641m
Level=376.630m
L=60.0

1020 376.024 376.308


DETAILS-A UMRI ROB @ LC C

CHECKED

1030 375.532 375.706


00m

DRAWING NUMBER:- VASUPRADA/492/HIG/OPT/04

1040 375.007 375.104


1050 374.465 374.502
UMRI BYPASS ALIGNMENT PROFILE OPTION-2 &

1060 373.885 373.900


G=-6.020

1070 373.251 373.298


L=88.047m

1080 372.575 372.696


APPROVED
L=53.901m

1090 371.898 372.094 Chainage=1102.688m


1100
1102.688 371.375
371.241 371.492
371.330 Level=371.330m
SCALE ON A2

DATE
Horizontal 1:2000

REV : R-0
16-10-2020

*FOR DISCUSSION ONLY


DATE
OCT 2020
R0
No
DESIGN CHAINAGE
LEVL DIFF.(FRL-OGL)
DATUM-367.0M

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
EXISTING GROUND LEVELS
Chainage=0.000m
0 370.397 370.397 0.001 Level=370.397m

20 370.113 370.783 0.670

G=1.930
Chainage=37.956m

L=37.956m
40 371.462 371.169 -0.292 Level=371.129m

FIRST SUBMISSION
60 371.856 371.578 -0.277

80 372.250 372.025 -0.224

100 372.644 372.511 -0.132

120 373.038 373.035 -0.003

-
BY
140 373.432 373.597 0.165

L=164.088m
R=10450.481m
160 373.826 374.197 0.372

180 374.220 374.836 0.617

CLIENT :
200 374.613 375.513 0.900 Chainage=202.044m
Level=375.584m

220 375.010 376.213 1.202

240 375.582 376.913 1.331

260 376.797 377.613 0.815

G=3.500
280 378.013 378.313 0.300

L=125.537m
300 379.236 379.013 -0.223

320 380.552 379.713 -0.840


Chainage=327.581m
Level=379.978m
340 381.869 380.407 -1.462

360 383.186 381.075 -2.111

380 384.070 381.713 -2.357

CONSULTANT :
400 384.856 382.323 -2.532

420 385.641 382.904 -2.738

440 386.427 383.456 -2.971

460 387.212 383.979 -3.234

480 387.998 384.473 -3.526

500 388.784 384.938 -3.846

520 389.569 385.374 -4.196

L=346.722m
R=-13823.865m
540 389.772 385.781 -3.991

560 389.640 386.159 -3.481

PROJECT :
OPTION-2 PROFILE
580 389.509 386.508 -3.000

600 389.377 386.829 -2.549

620 389.246 387.120 -2.125

640 389.114 387.382 -1.732

660 388.983 387.616 -1.366


Chainage=674.303m
680 388.851 387.822 -1.030 Level=387.765m
L=1336.827m

700 388.720 388.020 -0.699

720 388.159 388.219 0.060

740 387.547 388.417 0.870

760 386.935 388.615 1.681

780 386.323 388.814 2.491


HORIZONTAL CURVE DETAILS HIP CH:0+223.178

800 385.711 389.012 3.302

820 385.099 389.210 4.112

840 384.487 389.409 4.922

860 384.261 389.607 5.346

880 387.940 389.806 1.866

900 391.898 390.004 -1.895

920
DRAWN

393.047 390.202 -2.845


G=0.992
L=469.472m

940 394.065 390.401 -3.665


DRAWING TITLE :

960 394.088 390.599 -3.489


DESIGNED

980 394.112 390.797 -3.314

1000 394.135 390.996 -3.139


CHECKED
DRAWING NUMBER:- VASUPRADA/492/HIG/OPT/05
UMRI BYPASS ALIGNMENT PROFILE OPTION-2

APPROVED
SCALE ON A2

DATE
Horizontal 1:2000

REV : R-0
16-10-2020

*FOR DISCUSSION ONLY


DATE
OCT 2020
R0
No
DESIGN CHAINAGE
LEVL DIFF.(FRL-OGL)
DATUM-370.0M

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
EXISTING GROUND LEVELS
1000 394.135 390.996 -3.139

1020 394.158 391.194 -2.963

1040 394.181 391.392 -2.788

FIRST SUBMISSION
1060 394.204 391.591 -2.613

1080 394.227 391.789 -2.437

1100 394.250 391.988 -2.263

1120 394.273 392.186 -2.088

-
BY
1140 394.462 392.384 -2.077 Chainage=1143.775m
Level=392.422m
1160 394.937 392.573 -2.364

1180 395.000 392.734 -2.267

CLIENT :
1200 395.000 392.865 -2.135

1220 395.000 392.968 -2.032

1240 395.000 393.042 -1.958

1260 395.000 393.087 -1.913

1280 395.000 393.104 -1.897

1300 395.000 393.091 -1.909

1320 395.000 393.050 -1.951

1340 395.000 392.979 -2.021

1360 395.000 392.880 -2.120

L=408.170m
R=-13862.404m
1380 395.000 392.752 -2.248

L=50.000m

CONSULTANT :
1400 395.000 392.595 -2.405

1420 395.000 392.409 -2.591

1440 395.000 392.195 -2.806

1460 395.000 391.951 -3.049

1480 394.159 391.679 -2.479

1500 392.772 391.378 -1.393

1520 391.390 391.048 -0.341

1540 389.800 390.689 0.889


Chainage=1551.945m
Level=390.461m
1560 387.895 390.304 2.409

PROJECT :
1580 385.995 389.913 3.919

OPTION-2 PROFILE
1600 385.192 389.523 4.330

1620 385.649 389.132 3.484

1640 386.109 388.742 2.632

1660 386.574 388.351 1.778

1680 387.042 387.961 0.919

1700 386.843 387.570 0.727

1720 386.420 387.180 0.760


G=-1.953

1740 385.998 386.789 0.792


L=336.639m

1760 385.578 386.399 0.821

1780 385.160 386.008 0.848


HORIZONTAL CURVE DETAILS HIP CH:0+223.178

1800 384.231 385.618 1.386

1820 382.987 385.227 2.240

1840 381.803 384.837 3.034

1860 381.487 384.446 2.959

1880 381.177 384.056 2.878


Chainage=1888.584m
Level=383.888m
1900 380.874 383.672 2.798

1920 380.577 383.329


DRAWN

2.751

1940 380.287 383.030 2.742


DRAWING TITLE :

1960 380.004 382.775 2.771


DESIGNED

1980 380.000 382.564 2.563


L=149.933m
R=9072.655m

2000 380.000 382.397 2.396


CHECKED
DRAWING NUMBER:- VASUPRADA/492/HIG/OPT/06
UMRI BYPASS ALIGNMENT PROFILE OPTION-2

APPROVED
SCALE ON A2

DATE
Horizontal 1:2000

REV : R-0
16-10-2020

*FOR DISCUSSION ONLY


DATE
OCT 2020
R0
No
DESIGN CHAINAGE
LEVL DIFF.(FRL-OGL)
DATUM-370.0M

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
EXISTING GROUND LEVELS
2000 380.000 382.397 2.396

2020 380.000 382.274 2.273

Chainage=2038.516m
2040 380.000 382.195 2.194 Level=382.199m

FIRST SUBMISSION
2060 380.000 382.135 2.134

2080 380.000 382.075 2.074

2100 380.000 382.015 2.014

L=1375.343m
R=-1000.000m
2120 380.000 381.955 1.954

-
BY
2140 380.000 381.895 1.894

2160 380.000 381.835 1.834

2180 380.000 381.775 1.774

CLIENT :
2200 380.000 381.715 1.714

2220 380.000 381.655 1.654

2240 380.000 381.595 1.594

2260 380.000 381.535 1.534

G=-0.300
2280 379.721 381.475 1.753

L=438.167m
2300 379.280 381.415 2.135

2320 378.841 381.355 2.513

2340 378.406 381.295 2.888

2360 378.050 381.235 3.184

2380 377.933 381.175 3.242

CONSULTANT :
2400 377.822 381.115 3.293

2420 377.719 381.055 3.336

2440 377.623 380.995 3.372

2460 377.534 380.935 3.400


Chainage=2476.683m
2480 377.454 380.875 3.421 Level=380.885m

2500 377.786 380.809 3.024

2520 378.340 380.735 2.396

2540 378.895 380.653 1.758

2560 379.451 380.562 1.111

PROJECT :
OPTION-2 PROFILE
2580 380.000 380.463 0.462

2600 380.000 380.355 0.355

2620 380.000 380.239 0.239

2640 380.000 380.115 0.114


L=282.840m
R=-47602.785m

2660 380.000 379.982 -0.019

2680 380.000 379.841 -0.160

2700 380.000 379.691 -0.309

2720 380.000 379.533 -0.468

2740 380.000 379.367 -0.634

Chainage=2759.524m
2760 380.000 379.192 -0.809 Level=379.196m

2780 380.000 379.013 -0.988


HORIZONTAL CURVE DETAILS HIP CH:0+223.178

2800 380.000 378.834 -1.166


L=50.000m

2820 380.000 378.655 -1.345

2840 380.000 378.476 -1.524

2860 380.000 378.298 -1.703

2880 380.000 378.119 -1.882

2900 380.000 377.940 -2.061


G=-0.894
L=262.428m

2920
DRAWN

380.000 377.761 -2.239

2940 380.000 377.582 -2.418


DRAWING TITLE :

2960 380.000 377.403 -2.597


DESIGNED

2980 380.000 377.225 -2.776

3000 380.000 377.046 -2.955


CHECKED
DRAWING NUMBER:- VASUPRADA/492/HIG/OPT/07
UMRI BYPASS ALIGNMENT PROFILE OPTION-2

APPROVED
SCALE ON A2

DATE
Horizontal 1:2000

REV : R-0
16-10-2020

*FOR DISCUSSION ONLY


DATE
OCT 2020
R0
No
DESIGN CHAINAGE
DESIGN CHAINAGE

LEVL DIFF.(FRL-OGL)
LEVL DIFF.(FRL-OGL)

DATUM-360.0M
DATUM-360.0M

VERTICAL ALIGNMENT
VERTICAL ALIGNMENT

FINISHED ROAD LEVEL


FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
HORIZONTAL ALIGNMENT

EXISTING GROUND LEVELS


EXISTING GROUND LEVELS
4000 360.000 361.581 1.581 3000 380.000 377.046 -2.955

4020 360.000 361.520 1.520 3020 380.000 376.867 -3.134 Chainage=3021.951m


Level=376.849m

4040 360.000 361.459 1.459 3040 380.000 376.679 -3.321

FIRST SUBMISSION
4060 360.000 361.399 1.398 3060 380.000 376.469 -3.531

4080 360.000 361.338 1.337 3080 380.000 376.237 -3.763

4100 360.000 361.277 1.276 3100 380.000 375.983 -4.017

4120 360.000 361.216 1.215 3120 380.000 375.707 -4.294

-
BY
4140 360.000 361.155 1.154 3140 380.000 375.408 -4.592

4160 360.000 361.094 1.093 3160 380.000 375.088 -4.913

4180 360.000 361.033 1.032 3180 380.000 374.745 -5.255

G=-0.305

CLIENT :
L=701.820m
4200 360.000 360.972 0.971 3200 380.000 374.380 -5.620

L=325.990m
R=-18070.166m
4220 360.000 360.911 0.910 3220 380.000 373.993 -6.007

4240 360.000 360.850 0.849 3240 378.991 373.584 -5.407

4260 360.089 360.789 0.700 3260 377.766 373.153 -4.614

4280 360.396 360.728 0.332 3280 376.541 372.700 -3.842

4300 360.703 360.667 -0.035 3300 375.316 372.224 -3.092

4320 361.009 360.606 -0.403 3320 374.091 371.726 -2.365

4340 361.316 360.545 -0.771 3340 373.017 371.207 -1.811


Chainage=3347.941m
Level=370.994m
4360 361.623 360.484 -1.138 3360 372.020 370.669 -1.351

4380 361.929 360.423 -1.506 3380 371.023 370.129 -0.893

CONSULTANT :
4400 362.236 360.362 -1.873 3400 370.026 369.589 -0.436

4420 362.775 360.301 -2.473 3420 369.029 369.050 0.021


G=-2.698

4440 366.026 360.241 -5.785 3440 368.032 368.510 0.479


L=151.333m

4460 369.276 360.180 -9.097 3460 367.035 367.971 0.936

4480 372.527 360.119 -12.408 3480 365.964 367.431 1.466

Chainage=3499.274m
4500 375.777 360.058 -15.720 3500 364.875 366.891 2.017 Level=366.911m

4519 378.854 360.000 Chainage=4518.928m


Level=360.000m 3520 363.670 366.368 2.697

3540 361.517 365.874 4.357

3560 360.000 365.411 5.411

PROJECT :
3580 360.000 364.978 4.978

3600 360.000 364.575 4.575

3620 360.000 364.202 4.202

OPTION-2 PROFILE 3640 360.000 363.859 3.859

3660 360.000 363.547 3.546

3680 360.000 363.264 3.264


L=317.834m
R=13279.284m
L=1706.759m

3700 360.000 363.012 3.011

3720 360.000 362.790 2.789

3740 360.000 362.598 2.597

3760 360.000 362.436 2.435

3780 360.000 362.304 2.303


HORIZONTAL CURVE DETAILS HIP CH:0+223.178

3800 360.412 362.202 1.790


Chainage=3817.108m
3820 361.428 362.130 0.701 Level=362.139m

3840 362.445 362.069 -0.376

3860 363.462 362.008 -1.454

3880 364.478 361.947 -2.531

3900 364.342 361.886 -2.455

3920
DRAWN

362.980 361.825 -1.155

3940 361.619 361.764 0.146


DRAWING TITLE :

3960 360.257 361.703 1.446


DESIGNED

3980 360.000 361.642 1.642

4000 360.000 361.581 1.581


CHECKED
DRAWING NUMBER:- VASUPRADA/492/HIG/OPT/08
UMRI BYPASS ALIGNMENT PROFILE OPTION-2

APPROVED
SCALE ON A2

DATE
Horizontal 1:2000

REV : R-0
16-10-2020

*FOR DISCUSSION ONLY


DATE
OCT 2020
R0
No
DESIGN CHAINAGE
LEVL DIFF.(FRL-OGL)
DATUM-387.0M

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
EXISTING GROUND LEVELS
0 415.573 415.573 0.001 Chainage=0.000m
10 415.502 415.323 -0.180 Level=415.573m
20 415.432 415.073 -0.359
30 415.361 414.823 -0.539

G=-2.500
L=49.906m
40 415.252 414.573 -0.679
Chainage=49.906m

FIRST SUBMISSION
50 414.942 414.323 -0.619 Level=414.325m
60 414.631 414.070 -0.561

L=84.700m
70 413.984 413.812 -0.173
80 413.306 413.548 0.242
90 412.628 413.279 0.652
100 411.948 413.005 1.057
110 411.265 412.725 1.461
120 410.576 412.440 1.864
130 409.879 412.149 2.271

-
BY
140 409.172 411.853 2.681
150 408.454 411.552 3.099

L=150.000m
L=90.000m
160 407.722 411.245 3.523

R=-18525.422m
170 406.977 410.933 3.957
180 406.216 410.616 4.400

CLIENT :
190 405.440 410.293 4.853
Chainage=199.906m
200 404.650 409.964 5.314 Level=409.967m
210 404.376 409.633 5.257
220 404.701 409.302 4.602
230 404.954 408.971 4.018

L=73.219m
240 405.135 408.640 3.505

R=250.000m
250 405.244 408.309 3.065
260 405.284 407.978 2.694

G=-3.310
270 405.261 407.647 2.386

L=88.649m
280 405.184 407.316 2.132
Chainage=288.555m
290 405.060 406.986 1.925 Level=407.033m
300 404.899 406.670 1.771
310 404.706 406.377 1.670

L=90.000m
320 404.492 406.108 1.616
330 404.263 405.862 1.598
340 404.028 405.639 1.610
350 403.793 405.440 1.647
360 403.782 405.264 1.481
370 403.790 405.111 1.321
380 403.797 404.981 1.184

CONSULTANT :
390 403.805 404.875 1.071

L=150.000m
R=4287.325m
400 403.812 404.793 0.980

L=88.151m
410 403.820 404.733 0.913
420 403.828 404.697 0.870
430 403.835 404.684 0.849
Chainage=438.555m
440 403.845 404.695 0.849 Level=404.692m
450 403.862 404.714 0.852
460 403.890 404.733 0.843

G=0.189
470 403.935 404.751 0.817

L=46.294m
480 404.002 404.770 0.769 Chainage=484.848m
490 404.095 404.787 0.692 Level=404.779m

L=90.000m
500 404.219 404.790 0.571
510 404.379 404.776 0.397
520 404.580 404.746 0.167
530 404.824 404.701 -0.123
540 405.111 404.639 -0.472
550 405.187 404.561 -0.627
560 404.647 404.467 -0.180

PROJECT :
570 404.288 404.357 0.068
580 404.086 404.231 0.145
590 403.911 404.088 0.177
L=107.576m

600 403.766 403.930 0.164


R=-250.000m

L=190.000m

610 403.648 403.756 0.107

OPTION-3 PROFILE
R=-6215.502m

620 403.560 403.565 0.005


630 403.500 403.358 -0.141
640 403.036 403.136 0.099
650 402.569 402.897 0.327
660 402.143 402.642 0.499
670 401.752 402.371 0.619 Chainage=674.848m
680 401.389 402.086 0.698 Level=402.234m
690 401.048 401.799 0.752
L=90.000m

700 400.723 401.512 0.790


710 400.407 401.226 0.819
720 400.093 400.939 0.845
G=-2.868

730 399.799 400.652 0.852


L=63.571m

Chainage=738.419m
740 399.513 400.365 0.852 Level=400.410m
750 399.227 400.094 0.866
760 398.942 399.845 0.904
770 398.674 399.620 0.945
L=69.477m

780 398.513 399.417 0.904


790 398.351 399.237 0.887
HORIZONTAL CURVE DETAILS HIP CH:0+223.178

800 398.187 399.081 0.893


810 398.019 398.947 0.928
820 397.844 398.837 0.994
830 397.658 398.750 1.091
840 397.460 398.685 1.225
850 397.247 398.644 1.396
L=90.000m

L=175.000m
R=4341.604m

860 397.016 398.626 1.609


870 396.766 398.630 1.865
880 396.493 398.658 2.165
890 396.198 398.709 2.511
900 395.880 398.783 2.902
910 395.541 398.880 3.338 Chainage=913.419m
Level=398.918m
920 395.181 398.995 3.813
DRAWN

Chainage=930.282m
930 394.933 399.111 4.178 Level=399.114m
940 394.798 399.220 4.422
G=1.163
L=16.863m

950 394.656 399.313 4.657


DRAWING TITLE :

960 394.508 399.391 4.883


970 394.355 399.454 5.099
DESIGNED
L=151.486m
R=250.000m

L=75.000m

980 394.195 399.500 5.305


R=-6451.343m

990 394.030 399.532 5.501


1000 393.860 399.548 5.688 Chainage=1005.282m
Level=399.550m
CHECKED
DRAWING NUMBER:- VASUPRADA/492/HIG/OPT/09
UMRI BYPASS ALIGNMENT PROFILE OPTION-3

APPROVED
SCALE ON A2

DATE
Horizontal 1:2000

REV : R-0
16-10-2020

*FOR DISCUSSION ONLY


DATE
OCT 2020
R0
No
DESIGN CHAINAGE
LEVL DIFF.(FRL-OGL)
DATUM-380.0M

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
EXISTING GROUND LEVELS
1000 393.860 399.548 5.688 Chainage=1005.282m
1010 393.684 399.550 5.865 Level=399.550m
1020 393.504 399.550 6.045
1030 393.320 399.550 6.230
1040 393.132 399.550 6.418

FIRST SUBMISSION
1050 392.940 399.550 6.609
1060 392.746 399.550 6.804
1070 392.550 399.550 7.000
1080 392.352 399.550 7.198
1090 392.153 399.550 7.397

L=90.000m
1100 391.953 399.550 7.597
1110 391.753 399.550 7.797
1120 391.552 399.550 7.997
1130 391.352 399.550 8.198

-
BY
1140 391.151 399.550 8.398

G=0.000
1150 390.951 399.550 8.599

L=249.581m
1160 390.750 399.550 8.799
1170 390.728 399.550 8.821
1180 390.790 399.550 8.759

CLIENT :
1190 390.852 399.550 8.698
1200 390.913 399.550 8.636
1210 390.975 399.550 8.574
1220 391.037 399.550 8.513
1230 391.099 399.550 8.451
1240 391.160 399.550 8.389
1250 391.222 399.550 8.328 Chainage=1254.863m
1260 391.284 399.548 8.265 Level=399.550m
1270 391.345 399.534 8.189
1280 391.407 399.506 8.099
1290 391.469 399.464 7.996
1300 391.530 399.409 7.878
1310 391.592 399.339 7.746
1320 391.654 399.255 7.602
1330 391.716 399.158 7.442
1340 391.777 399.047 7.269
1350 391.839 398.921 7.083
1360 391.901 398.782 6.882
1370 391.962 398.629 6.667

L=180.000m
L=463.327m
1380 6.438

R=-7200.000m
392.024 398.463

CONSULTANT :
1390 392.086 398.282 6.196
1400 392.147 398.087 5.940
1410 392.209 397.879 5.669
1420 392.271 397.656 5.386
1430 392.333 397.420 5.087 Chainage=1434.863m
1440 392.394 397.172 4.777 Level=397.300m
1450 392.456 396.922 4.466
1460 392.518 396.672 4.154
1470 392.579 396.422 3.842
1480 392.641 396.172 3.530
1490 392.703 395.922 3.219
1500 392.764 395.672 2.907

G=-2.500
L=93.233m
1510 392.826 395.422 2.595
1520 392.888 395.172 2.284
Chainage=1528.097m
1530 392.950 394.922 1.973 Level=394.969m
1540 393.011 394.688 1.677
1550 393.073 394.478 1.406
1560 393.135 394.292 1.157

PROJECT :
1570 393.196 394.129 0.932
1580 393.258 393.989 0.731
L=80.000m

1590 393.320 393.874 0.554


R=4239.713m

1600 393.381 393.781 0.400


Chainage=1608.097m

OPTION-3 PROFILE
1610 393.442 393.712 0.271 Level=393.724m
1620 393.502 393.651 0.149
1630 393.561 393.590 0.028
L=70.000m

1640 393.619 393.528 -0.090


1650 393.675 393.467 -0.208
1660 393.730 393.406 -0.325
1670 393.783 393.344 -0.439
1680 393.834 393.283 -0.551
1690 393.884 393.222 -0.663
1700 393.932 393.160 -0.771
1710 393.978 393.099 -0.879
1720 394.023 393.038 -0.985
1730 394.065 392.977 -1.089
1740 394.106 392.915 -1.191
1750 394.145 392.854 -1.292
1760 394.183 392.793 -1.390
1770 394.025 392.731 -1.294
L=202.741m
R=700.000m

1780 393.801 392.670 -1.131


1790 393.564 392.609 -0.956
HORIZONTAL CURVE DETAILS HIP CH:0+223.178

1800 393.314 392.547 -0.767


1810 393.051 392.486 -0.565
1820 392.775 392.425 -0.351
1830 392.487 392.363 -0.123
1840 392.185 392.302 0.117
1850 391.871 392.241 0.370
1860 391.544 392.180 0.635
1870 391.207 392.118 0.912
1880 390.860 392.057 1.196
1890 390.507 391.996 1.489
1900 390.147 391.934 1.787
1910 389.812 391.873 2.061
L=70.000m

1920 389.495 391.812 2.317


DRAWN

1930 389.177 391.750 2.573


1940 388.859 391.689 2.830
1950 388.542 391.628 3.086
1960 391.566 3.101
DRAWING TITLE :

388.465
1970 388.587 391.505 2.919
DESIGNED

1980 388.708 391.444 2.735


1990 388.830 391.383 2.552
2000 388.952 391.321 2.370
G=-0.613
L=761.220m

CHECKED
DRAWING NUMBER:- VASUPRADA/492/HIG/OPT/10
UMRI BYPASS ALIGNMENT PROFILE OPTION-3

APPROVED
SCALE ON A2

DATE
Horizontal 1:2000

REV : R-0
16-10-2020

*FOR DISCUSSION ONLY


DATE
OCT 2020
R0
No
DESIGN CHAINAGE
LEVL DIFF.(FRL-OGL)
DATUM-365.0M

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
EXISTING GROUND LEVELS
2000 388.952 391.321 2.370

G=-0.613
2010 389.073 391.260 2.186

L=761.220m
2020 389.195 391.199 2.004
2030 389.317 391.137 1.821
2040 389.438 391.076 1.638

FIRST SUBMISSION
2050 389.560 391.015 1.455
2060 389.682 390.953 1.272
2070 389.803 390.892 1.089
2080 389.925 390.831 0.906
2090 390.000 390.769 0.769
2100 390.000 390.708 0.708
2110 390.000 390.647 0.646
2120 390.000 390.586 0.585
2130 390.000 390.524 0.524

-
BY
2140 390.000 390.463 0.462
2150 390.000 390.402 0.401
2160 390.000 390.340 0.340
2170 390.000 390.279 0.279
2180 390.000 390.218 0.217

CLIENT :
2190 390.000 390.156 0.156
2200 390.000 390.095 0.095
2210 390.000 390.034 0.033
2220 390.000 389.972 -0.028
2230 390.000 389.911 -0.089
2240 390.000 389.850 -0.151
2250 390.000 389.789 -0.212
2260 390.000 389.727 -0.273
2270 390.000 389.666 -0.335
2280 390.000 389.605 -0.396
2290 390.000 389.543 -0.457
2300 390.000 389.482 -0.518
2310 390.000 389.421 -0.580
2320 390.000 389.359 -0.641
2330 390.000 389.298 -0.702
2340 390.000 389.237 -0.764
2350 390.000 389.175 -0.825
2360 390.000 389.114 -0.886
Chainage=2369.317m
2370 390.000 389.053 -0.948 Level=389.057m
2380 390.000 388.983 -1.017

CONSULTANT :
2390 390.000 388.900 -1.101
2400 390.000 388.801 -1.199
2410 390.000 388.689 -1.312
2420 390.000 388.562 -1.438
2430 390.000 388.421 -1.580
2440 390.000 388.265 -1.735
2450 389.820 388.095 -1.724
2460 389.621 387.911 -1.710
2470 389.423 387.713 -1.710
2480 389.224 387.500 -1.725
2490 389.026 387.272 -1.753
2500 388.828 387.031 -1.797
2510 388.629 386.775 -1.855
2520 388.431 386.504 -1.926

L=250.000m
R=-6969.767m
2530 388.232 386.220 -2.013
2540 388.034 385.921 -2.113
2550 384.775 385.607 0.832
2560 384.336 385.280 0.943

PROJECT :
2570 383.911 384.938 1.026
2580 383.509 384.581 1.073
2590 383.106 384.210 1.104

OPTION-3 PROFILE
2600 382.704 383.825 1.122
2610 382.301 383.426 1.124
Chainage=2619.317m
2620 381.899 383.012 1.114 Level=383.041m
2630 381.496 382.592 1.096
2640 381.094 382.172 1.079
2650 380.691 381.752 1.061
2660 380.289 381.332 1.044
2670 379.956 380.912 0.956
2680 379.802 380.492 0.690
2690 379.649 380.072 0.424
2700 379.495 379.652 0.158
2710 379.341 379.232 -0.108
L=1532.507m

2720 379.187 378.812 -0.374


2730 379.033 378.392 -0.640
2740 378.879 377.972 -0.906
2750 378.725 377.552 -1.172
2760 378.571 377.132 -1.438
2770 378.417 376.712 -1.704
G=-4.200
L=260.683m

2780 377.671 376.292 -1.379


2790 376.653 375.872 -0.781
HORIZONTAL CURVE DETAILS HIP CH:0+223.178

2800 375.635 375.452 -0.183


2810 374.838 375.032 0.195
2820 374.407 374.612 0.206
2830 373.975 374.192 0.217
2840 373.544 373.772 0.228
2850 373.113 373.352 0.240
2860 372.682 372.932 0.251
2870 372.166 372.512 0.346
Chainage=2880.000m
2880 371.376 372.092 0.717 Level=372.092m
2890 370.585 371.684 1.098
2900 369.902 371.298 1.396
2910 369.526 370.936 1.411
2920 369.150 370.597 1.448
DRAWN

2930 368.773 370.281 1.508


2940 368.397 369.989 1.592
2950 368.021 369.719 1.699
2960 369.473 1.829
DRAWING TITLE :

367.644
2970 367.268 369.250 1.982
DESIGNED

2980 366.892 369.050 2.158


2990 366.607 368.873 2.266
3000 366.762 368.719 1.957
L=200.000m

3010 366.917 368.589 1.671


R=4318.320m

CHECKED
DRAWING NUMBER:- VASUPRADA/492/HIG/OPT/11
UMRI BYPASS ALIGNMENT PROFILE OPTION-3

APPROVED
SCALE ON A2

DATE
Horizontal 1:2000

REV : R-0
16-10-2020

*FOR DISCUSSION ONLY


DATE
OCT 2020
R0
No
DESIGN CHAINAGE
LEVL DIFF.(FRL-OGL)
DATUM-360.0M

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
EXISTING GROUND LEVELS
3000 366.762 368.719 1.957

L=200.000m
3010 366.917 368.589 1.671

R=4318.320m
3020 367.072 368.481 1.409
3030 367.227 368.397 1.170
3040 367.382 368.336 0.954

FIRST SUBMISSION
3050 367.537 368.298 0.761
3060 367.692 368.283 0.591
3070 367.847 368.292 0.444
Chainage=3080.000m
3080 367.868 368.323 0.455 Level=368.323m
3090 367.879 368.367 0.488
3100 367.889 368.410 0.521
3110 367.899 368.453 0.554
3120 367.909 368.496 0.587
3130 367.919 368.539 0.620

-
BY
3140 367.929 368.582 0.653
3150 367.939 368.625 0.686

G=0.431
3160 367.950 368.669 0.719

L=107.296m
3170 367.960 368.712 0.752
3180 367.970 368.755 0.785 Chainage=3187.296m

CLIENT :
3190 367.980 368.798 0.817 Level=368.786m
3200 367.990 368.835 0.845
3210 368.000 368.865 0.865
3220 368.011 368.888 0.878
3230 368.021 368.904 0.883
3240 368.031 368.912 0.881
3250 368.041 368.912 0.871
3260 368.051 368.906 0.854
3270 368.061 368.892 0.830
3280 368.072 368.871 0.799
3290 368.082 368.842 0.761
3300 368.092 368.806 0.715
3310 368.102 368.763 0.660
3320 368.041 368.712 0.672
3330 367.932 368.654 0.722

L=230.000m
3340 367.824 368.589 0.765

R=-13615.754m
3350 367.715 368.516 0.801
3360 367.607 368.436 0.830
3370 367.498 368.349 0.850
3380 367.390 368.254 0.865

CONSULTANT :
3390 367.281 368.152 0.870
3400 367.173 368.043 0.870
3410 367.064 367.926 0.861 Chainage=3417.296m
3420 366.956 367.802 0.847 Level=367.836m
3430 366.847 367.676 0.829
3440 366.739 367.550 0.812
3450 366.630 367.425 0.794
3460 366.522 367.299 0.777
3470 366.411 367.173 0.762
3480 366.298 367.047 0.750
3490 366.178 366.922 0.744

G=-1.258
3500 366.050 366.796 0.746

L=122.368m
3510 365.911 366.670 0.759
3520 365.760 366.544 0.784
L=90.000m

3530 365.595 366.418 0.824


Chainage=3539.664m
3540 365.413 366.293 0.879 Level=366.297m
3550 365.213 366.158 0.946

OPTION-3 PROFILE
3560 364.994 366.008 1.014

PROJECT :
3570 364.812 365.841 1.028
3580 364.613 365.658 1.045
3590 364.058 365.458 1.401
3600 363.489 365.243 1.753
3610 362.908 365.011 2.103
3620 362.315 364.763 2.449
L=120.000m

3630 361.710 364.499 2.788


R=-6166.404m

3640 361.096 364.219 3.122


L=139.470m
R=250.000m

3650 360.473 363.922 3.449


Chainage=3659.664m
3660 360.000 363.609 3.609 Level=363.620m
3670 360.000 363.289 3.288
3680 360.000 362.968 2.968
3690 360.000 362.648 2.648 Chainage=3695.026m
Level=362.487m
G=-3.204

3700 360.000 362.331 2.331


L=35.362m

3710 360.000 362.038 2.038


3720 360.000 361.774 1.773
3730 360.000 361.537 1.536
3740 360.000 361.328 1.327
3750 360.000 361.146 1.146
L=90.000m

3760 360.000 360.993 0.992


L=100.000m

3770 360.000 360.867 0.867


R=3593.551m

3780 360.000 360.769 0.769


3790 360.000 360.699 0.699 Chainage=3795.026m
HORIZONTAL CURVE DETAILS HIP CH:0+223.178

3800 360.000 360.654 0.653 Level=360.675m


3810 360.000 360.612 0.611
3820 360.000 360.569 0.569
3830 360.000 360.527 0.527
3840 360.000 360.485 0.485
3850 360.000 360.443 0.443
3860 360.000 360.401 0.400
3870 360.000 360.359 0.358
3880 360.000 360.317 0.316
3890 360.000 360.275 0.274
L=182.579m

G=-0.421

3900 360.000 360.233 0.232


L=160.205m

3910 360.000 360.190 0.190


3920 360.000 360.148 0.148
DRAWN

3930 360.000 360.106 0.106


3940 360.000 360.064 0.064
3950 Chainage=3955.231m
3955 360.000 360.022 0.022 Level=360.000m
DRAWING TITLE :

DESIGNED
CHECKED
DRAWING NUMBER:- VASUPRADA/492/HIG/OPT/12
UMRI BYPASS ALIGNMENT PROFILE OPTION-3

APPROVED
SCALE ON A2

DATE
Horizontal 1:2000

REV : R-0
16-10-2020

*FOR DISCUSSION ONLY