You are on page 1of 28

DATE

JULY 2020
R0
No
LEVEL DIFF.

SUPERELEVATION

DESIGN CHAINAGE
@8M LHS FROM PCL

@8M RHS FROM PCL

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
Tin Shed

HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
Bus

LEVEL DATUM- 304.0 (m)


Sto
p 0

ORIGINAL GROUND/ROAD LEVEL


Chainage=0.000m

L
0 304.940 304.899 -0.126 305.065 304.939 Level=304.939m

Tin Shed
Radius:
Easting:

L
20 305.008 305.138 0.237 305.039 305.276
HIP Chainage :

Design Speed (V):

L
R

FIRST SUBMISSION
House
400

40 305.146 305.270 0.345 305.268


Extra Widening (We)

305.612
TO MUDKHED

CURVE DETAIL-HIP

L
Nothing: 2119490.826 Ls:

60 306.076 305.404 0.186 305.764 305.949


Delta (Δ): 03 15 39.750 Ts:

-
e%:
CD-1

45 Kmph
-
-
0+037.830

20

80 305.875 305.939 0.327 305.959 306.286


763770.902 Lc: 22.766

100

G=1.683
L=170.236m
100 306.228 306.265 0.375 306.247 306.622

BY
House
House

120 306.952 307.282 0.316 306.642 306.959


House

140 307.217 307.302 0.079 307.216 307.295

CLIENT :
160 307.279 306.914 -0.109 307.740 307.632
Chainage=170.236m
Level=307.804m

L=197.465m
180 307.576 307.299 -0.030 307.994 307.964 200

200 307.728 307.604 0.087 308.178 308.265

220 308.077 307.735 0.100 308.432 308.531

L=100.000m
Radius:

R=-11248.451m
Easting:

240 308.547 307.865 0.074 308.688 308.761


HIP Chainage :

260 308.786 308.037 0.032 308.924 308.956


Design Speed (V):

Chainage=270.236m
4000
Extra Widening (We)

Level=309.042m
CURVE DETAIL-HIP

280 309.041 308.265 0.008 309.111 309.119

L
R
300
Nothing: 2119491.502 Ls:
Delta (Δ): 00 28 52.812 Ts:

-
e%:
CD-2

300 309.388 309.537 -0.050 309.328 309.278


100 Kmph
-
-
-
0+283.478
764016.550 Lc: 33.604

320 309.031 308.983 0.298 309.138 309.437

CONSULTANT :
340 309.127 308.975 0.409 309.186 309.596

360 309.460 309.349 0.402 309.352 309.754

380 309.529 310.559 0.076 309.837 309.913 400

400 309.687 309.677 0.286 309.785 310.072

L=210.639m
420 310.105 310.631 0.074 310.157 310.230

G=0.794
L=296.029m
440 310.025 309.730 -0.031 310.421 310.389

460 310.328 309.659 -0.064 310.612 310.548


REST HOUSE UKHED

e=2.000 e=2.000
480 310.625 309.731 0.390 310.316 310.707 500

PROJECT :
500 310.443 309.884 0.053 310.813 310.865
Radius:
Easting:

520 310.736 309.844 0.764 310.261 311.024


HIP Chainage :

Design Speed (V)


Delta (Δ): 02 52

:
Extra Widening (W
Nothing: 211948

1500
e)

540 311.065 310.395 0.268 310.914 311.183


CURVE DETAIL-HI
P

9.517 Ls:
18.817 Ts:
764281.585 Lc:

-
e%:

L=75.186m

560 310.883 310.701 0.346 310.996 311.341 Chainage=566.265m


R=1500.000m
80 Kmph
CD-3

Level=311.391m
-
-
-
0+548.519
75.186

580 311.075 310.740 0.421 311.088 311.510 600

600 311.122 310.408 0.588 311.128 311.716

620 311.376 310.390 0.698 311.265 311.962


L=100.000m
R=9969.631m

640 311.373 310.681 0.815 311.435 312.249

660 311.459 311.525 0.896 311.680 312.576 Chainage=666.265m


Level=312.686m

680 311.432 312.219 0.803 312.131 312.933 700


L=172.614m
DP
Radius:
Easting:

700 312.435 312.790 0.558 312.735 313.292


HIP Chainage :

Design Speed (V):

720 312.919 313.203 0.533 313.118 313.652


800
Extra Widening (We)
CURVE DETAIL-HIP

House

740 312.826 313.451 0.596 313.416 314.011


Nothing: 2119476.406 Ls:
Delta (Δ): 02 30 10.700 Ts:

-
e%:

DP
CD-4

65 Kmph

G=1.797
-
-
-

760 313.442 313.818 0.687 313.684 314.370


0+776.195

L=172.407m
764508.898 Lc: 34.948

L
R

780 313.473 313.878 0.763 313.966 314.730


House

800
House
Proposal

800 313.799 314.423 0.882 314.207 315.089


House

SABEESH
Design Chainage

Type of Structure

DRAWN

820 314.261 314.362 0.970 314.479 315.448

Chainage=838.672m
Existing Span (m) 1x0.9
Proposed Span (m) 1x1.2
0+846

840 314.271 314.437 1.261 314.546 315.808 Level=315.784m


House
House

GOURI
L=85.545m
Reconstruction

DRAWING TITLE :
PIPE CULVERT

860 314.539 315.026 1.289 314.847 316.137


DESIGNED
FROM KM-0+000
HIP

880 314.811 315.262 1.259 315.154 316.413


De lt

900
C

a
h

Nothin

Proposed Span(m)
Easting
a
:
g

Design Chainage(m)
:

Design
S

House
id

900 314.999 315.527 1.206 315.429 316.635


inag

PIPE CULVERT
2
e

DRAWING NUMBER:- ***/MU-BO/HIG/PP/01

SANDEEP
CURVE :

11

L=40.000m
9 4
76466

1x1.2
3
DETAIL
TO BHOKAR

CHECKED
8

0+846

920 315.105 315.971 1.031 315.773 316.804


5

Extra W peed (V):


): 05 50
.4

24 11

TO KM-1+000
.8
0

Radius: ening (We)


-HIP

.5
3

L=160.000m
4

R=-7502.601m
L
6

R
L

Majid

940 315.446 315.912 0.782 316.138 316.920


c:

DP
90 Ls:

PLAN & PROFILE (MUDKHED-BHOKAR ROAD)


Ts:

65
e%:
-
K
CD-5

33

NGK RAJU
.726

p
-
40

960 315.392 316.343 0.594 316.389 316.983


0+935 .006

APPROVED

980 315.868 316.400 0.630 316.362 316.992


L=40.000m

1000
House

Chainage=998.672m
Level=316.952m
Tank
Water

1000 315.127 316.426 0.896 316.052 316.948


House

SCALE ON A2

Vertical 1:200

DATE
Horizontal 1:2000

REV : R-0
JUL- 2020
DATE
JULY 2020
R0
No
LEVEL DIFF.

SUPERELEVATION

DESIGN CHAINAGE
@8M LHS FROM PCL

@8M RHS FROM PCL


CD-5

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
0+935.726

65 Kmph
-
40

HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 308.0 (m)
33.006

ORIGINAL GROUND/ROAD LEVEL


1000
Level=316.952m

House
1000 315.127 316.426 0.896 316.052 316.948

House
Tank
Water
1020 315.496 316.259 0.768 316.113 316.881

House
Tin Shed

FIRST SUBMISSION
1040 315.632 316.375 0.228 316.585 316.814
TO MUDKHED

1060 315.751 316.611 -0.198 316.945 316.746

1080 315.768 316.689 317.134 316.679


1100
1100 316.112 316.879 316.874 316.612

BY
1120 315.566 316.232 316.622 316.545

L=254.176m
1140 315.219 316.663 0.109 316.369 316.478

G=-0.336

CLIENT :
L=279.983m
1160 315.113 316.031 0.086 316.325 316.410

1180 315.691 316.319 0.049 316.294 316.343


1200
1200 315.627 315.972 0.058 316.218 316.276

1220 315.031 316.081 0.139 316.069 316.209


CANAL

1240 315.520 316.060 0.118 316.023 316.142

1260 314.776 315.463 0.053 316.021 316.074

Chainage=1278.656m
1280 315.077 315.709 316.031 316.007 Level=316.012m
1300
1300 315.462 315.763 0.021 315.927 315.949
Radius:
Easting:

Proposal

1320 315.157 314.961 0.537 315.369 315.906


HIP Chainage :

Design Speed (V):

CONSULTANT :
Design Chainage

Type of Structure
Extra Widening (We
1200
)

1340 314.139 314.172 1.085 314.793 315.878


Delta (Δ): 08 58 33.3
Nothing: 2119552.52
CURVE DETAIL-HIP

L=187.992m
R=1200.000m
Proposed Span (m) 1x1.2
7 Ls:
60 Ts:
e%
765065.927 Lc:

1+338

Existing Span (m) 1x0.75


-
:

1360 315.009 314.608 0.760 315.105 315.865


80 Kmph
CD-6

-
-
-

Reconstruction
1+340.582

Proposed Span(m)
PIPE CULVERT

Design Chainage(m)

1380 315.799 315.316 -0.013 315.880 315.868


187.992

PIPE CULVERT

1400
1400 316.126 316.210 316.551 315.886
1x1.2
1+338

1420 316.590 316.086 316.866 315.919

L=300.000m
1440 316.167 316.373 -0.821 316.788 315.967

R=26151.630m
1460 315.669 316.324 316.538 316.031
CANAL

Proposed Span(m)
Design Chainage(m)

1480 315.047 315.962 -0.251 316.362 316.110


Proposal

PIPE CULVERT

1500

PROJECT :
1x1.2

1500 316.216 315.409 0.239 315.965 316.205


1+524
Design Chainage

Type of Structure
Existing Span (m)
Proposed Span (m)

L=134.301m

1520 313.875 314.466 1.030 315.284 316.315


1x1.2
2x0.75
1+524

1540 314.557 314.982 1.156 315.284 316.440


Reconstruction
PIPE CULVERT

1560 315.343 315.347 0.655 315.924 316.580

Chainage=1578.656m
Level=316.725m
Radius:

1580 315.178 314.843 0.442 316.293 316.736


Easting:

1600
HIP Chainage :

1600 315.730 315.819 0.307 316.591 316.898


76534

Design Speed (V):


1200
Extra Widening (We)

G=0.811
9.713

L=60.201m
CURVE DETAIL-HIP

1620 315.509 315.885 0.581 316.480 317.060


Delta (Δ): 05 17 46.452

80
Lc:
Nothing: 2119563.317 Ls:
Ts:

Chainage=1638.857m
e%:
-

L=110.924m

1640 315.841 315.960 0.360 316.863 317.222 Level=317.213m


R=-1200.000m
CD-7

Kmph
-
-
-
1+624.188
110.924

1660 316.655 316.386 0.331 317.034 317.364

1680 316.608 316.888 0.316 317.154 317.469


L

1700
1700 317.118 316.788 0.338 317.200 317.538

1720 316.974 316.962 0.272 317.297 317.569

1740 317.190 317.312 0.220 317.344 317.565


Radius:
Easting:

Design Spee
HIP Chainag

Extra Widenin
Nothing: 21

1760 316.732 317.015 0.345 317.179 317.523


e:

19

d (V):
CURVE DETA

PANDAN
1200
g (We)

L=250.000m

ROAD
R=-10908.173m

1780 316.617 316.871 0.499 316.945 317.445


765506.759

24 15.541
IL-HIP

1800
L=155.076m
Ts:
Delta (Δ): 07 583.919 Ls:

R=1200.000m
House
-
e%:

1800 316.337 316.799 0.855 316.475 317.330


80 Kmph

SABEESH
CD-8

-
-
-
1+782.499

DRAWN
House
Lc: 155.076

1820 316.291 316.689 0.472 316.706 317.178

1840 316.109 316.171 0.529 316.462 316.990


GOURI
DRAWING TITLE :

1860 315.824 316.236 0.719 316.046 316.765


DESIGNED
FROM KM-1+000

1880 315.269 315.981 0.445 316.059 316.504 Chainage=1888.857m


Level=316.376m
1900
CANAL

1900 315.362 315.836 0.350 315.861 316.211


DRAWING NUMBER:- ***/MU-BO/HIG/PP/02

SANDEEP
TO BHOKAR

CHECKED

1920 314.756 314.819 0.336 315.579 315.915


TO KM-2+000

1940 314.386 315.204 0.389 315.230 315.619


PLAN & PROFILE (MUDKHED-BHOKAR ROAD)
G=-1.481
L=97.054m

NGK RAJU

1960 315.014 314.007 0.262 315.061 315.323


APPROVED

1980 313.352 313.750 0.394 314.632 315.027 Chainage=1985.911m


e=2.500

Level=314.939m
2000
2000 313.115 314.253 0.733 314.009 314.743
SCALE ON A2

Vertical 1:200

DATE
Horizontal 1:2000

REV : R-0
JUL- 2020
TO MUDKHED TO BHOKAR

Nalla
CURVE DETAIL-HIP CD-10
HIP Chainage : 2+433.311
Easting: 766157.274 Lc: 86.674
CD-9 CURVE DETAIL-HIP CD-11
IL-HIP Nothing: 2119597.631
Design Chainage 2+095 CURVE DETA 2+289.490 Ls: 30 HIP Chainage : 2+672.002 Design Chainage 2+803
: Delta (Δ): 06 12 27.152
Proposed Span (m) 1x1.2 HIP Chainage Lc: 116.274 Ts: - Easting: 766395.818 Lc: 29.879 Proposed Span (m) 1x3x1.5
Existing Span (m) 3x0.75 Easting: 766013.966 -
Radius: 800 e%: 3.6% Nothing: 2119587.237 Ls: Existing Span (m) 3x0.9
: 21 19 58 4.532 Ls: Extra Widening (We) -
Type of Structure PIPE CULVERT Nothing - - Delta (Δ): 01 25 35.901 Ts: Type of Structure
33 05.962 Ts: Design Speed (V): - BOX CULVERT
Proposal Delta (Δ): 05 - 80 Kmph Radius: 1200

Nalla
Reconstruction e%: e%: - Proposal Reconstruction
1200
L
CANA

Radius: - Extra Widening (We) -


Nal
la

Wi de nin g (We) Design Speed (V):


Extra 80 Kmph 80 Kmph
(V):
Design Speed
House Tin Shed

House

Water
Tank

Tin
Shed

Nalla

2500
2400

2600
2300
Tin Shed

2700
2000

2100

2200

3000
2800
Water

2900
Tank Tin Shed

CANAL House

CANAL

CURVE DETAIL-HIP CD-12


2+368 HIP Chainage : 2+855.476
Design Chainage Lc: 37.971
Easting: 766579.245

Nalla
Proposed Span (m) 1x1.2 -
Nothing: 2119583.047 Ls:
Existing Span (m) 1x0.75 -
PIPE CULVERT Delta (Δ): 01 48 46.720 Ts:
Type of Structure 1200 e%: -
Radius:
Proposal Reconstruction ing (We) -
Extra Widen
Design Speed (V): 80 Kmph

Chainage=2709.842m

Chainage=2909.842m
Level=315.951m

Level=315.622m
BOX CULVERT
Chainage=2165.962m
Chainage=2135.911m

Chainage=2335.962m
Design Chainage(m) 2+803

Chainage=2494.719m
Chainage=2374.719m
Level=314.247m

PIPE CULVERT
Level=314.127m

Proposed Span(m) 1x3x1.5

Level=313.615m
Design Chainage(m) 2+095

Level=313.243m
Level=313.173m
Proposed Span(m) 1x1.2 PIPE CULVERT
Design Chainage(m) 2+368 Design C
Proposed Span(m) 1x1.2 Propose

LEVEL DATUM- 308.0 (m)


314.294

314.294

312.854

315.324

316.404

316.484

316.474

316.384
314.743

314.507

314.322

314.065

314.080

314.223

314.330

314.330

313.967

312.948

312.927

313.080

313.562

314.065

314.820

315.072

315.827

316.072

316.508

316.237

316.033

315.772

314.508
313.786

313.569

314.569

315.576

316.266

314.826
314.144
314.100

313.310

313.813

314.317

315.143
314.186

314.112

313.115
314.221

313.341

312.861

315.461

314.191
FINISHED ROAD LEVEL
313.244

313.204

314.624
313.703

313.237

313.807

313.783

313.720

313.542

312.673

312.295

313.292

313.623

314.900

315.540

316.428

316.455

314.982

316.572

316.300

315.620

315.432

314.943

314.598

313.702
314.009

312.779

313.826

312.406

313.446

313.936

314.069

315.326

314.194
311.472

311.840

311.940

312.612

314.313

316.312

316.016

315.126
311.910
312.971

312.691

312.921

313.841

313.921

313.071

316.061
312.711
ORIGINAL GROUND/ROAD LEVEL

-0.045

-0.025

-0.098
0.374

0.504

0.764

0.424

0.334
0.733

0.805

0.907

0.382

0.523

0.502

0.952

0.238

0.270

0.367

0.442

0.500

0.507

0.287

0.085

0.220

0.340

0.200

0.228

0.488
0.559

0.369

0.449

0.249

0.029
0.314
1.077

1.287

1.008

0.010

0.413

0.315
1.409

1.869

1.276

1.526
1.215

1.163
1.159

0.571

0.381
1.114
0.511

LEVEL DIFF.
313.524

312.704

312.374

312.874

313.304

312.754

312.794

316.234
314.253

313.803

313.421

313.483

313.467

313.083

313.038

312.933

312.962

312.995

313.660

313.523

314.970

315.628

316.350

314.532

319.030

315.500

313.507

313.605

313.480
312.266

312.959

313.629

310.769

313.566

314.559
311.794
311.453

311.682

312.182

314.128

314.142
312.169
313.551

312.821

314.871

313.119
ORIGINAL GROUND LEVEL
312.151

313.311

311.031

314.161
311.411

@8M LHS FROM PCL


313.234

313.454

313.264
313.258

313.050

312.070

313.092

313.532

313.092

312.278

310.898

312.403

312.207

313.732

313.693

314.380

313.803

314.928

315.395

315.650

315.605

314.983

314.803

314.358

314.457
314.726

310.479

315.976

315.239

313.946
ORIGINAL GROUND LEVEL
314.173

311.845

311.045

311.548

311.448

312.815

314.012

313.918

313.212
313.126

314.106
311.184
313.115

314.118

312.112
313.641

314.451

315.331

313.651
311.931

314.101
@8M RHS FROM PCL

R=-1200.000m R=800.000m R R
HORIZONTAL ALIGNMENT L=86.674m
L=371.379m L=116.274m L L L L=150.456m L L=149.548m L=37.971m L=72.136m L=60.000m

R=7983.135m G R=4999.463m G=1.259


L=150.000m L L=120.000m L=215.123m
VERTICAL ALIGNMENT
L=170.000m L L=200.000m
R=-11040.502m G R=-7025.920m
e=2.000 e=2.000 e=5.600
e=3.600
SUPERELEVATION e=2.500

e=3.600
e=5.600
DESIGN CHAINAGE
2000

2020

2040

2060

2080

2100

2120

2140

2160

2180

2200

2220

2240

2260

2280

2300

2320

2340

2360

2380

2400

2420

2440

2460

2480

2500

2520

2540

2560

2580

2600

2620

2640

2660

2680

2700

2720

2740

2760

2780

2800

2820

2840

2860

2880

2900

2920

2940

2960

2980

3000
CLIENT : CONSULTANT : PROJECT : DRAWING TITLE : SCALE ON A2
PLAN & PROFILE (MUDKHED-BHOKAR ROAD) Horizontal 1:2000
FROM KM-2+000 TO KM-3+000 Vertical 1:200

DRAWING NUMBER:- ***/MU-BO/HIG/PP/03 DATE


DRAWN DESIGNED CHECKED APPROVED JUL- 2020
JULY 2020 R0 FIRST SUBMISSION
SABEESH GOURI SANDEEP
DATE No BY
NGK RAJU REV : R-0
DATE
JULY 2020
R0
No
LEVEL DIFF.

SUPERELEVATION

DESIGN CHAINAGE
@8M LHS FROM PCL

@8M RHS FROM PCL

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 304.0 (m)
Tin
Shed

ORIGINAL GROUND/ROAD LEVEL


3000

House
Tin She
d
3000 313.212 313.119 0.488 313.702 314.191

L
R

e=5.600
e=5.600
3020 313.225 313.194 0.544 313.330 313.873

FIRST SUBMISSION
3040 311.954 310.929 0.721 312.835 313.556
TO MUDKHED

G=-1.588
Na Na
lla lla

L=250.016m
Proposed Span(m)
Flag

Design Chainage(m)
Tin
Shed

3060 312.904 312.375 0.646 312.592 313.238

MINOR BRIDGE

L=60.000m
Na
lla
Gate

House

1x5.8
3+044
3080 312.606 312.565 -0.059 312.979 312.920
3100

Proposal
Nothi

3100 312.226 311.976 0.179 312.423 312.603


Extra

BY
ng
Easting:

Radius:
:

Wi
Delta (Δ):

Design Chainage
de
HIP Chainag

Type of Structure
Existing Span (m)
Design Spee
21

e=2.000
3120 311.525 310.878 0.219 312.066 312.285
Proposed Span (m)
e:

nin g
19
CURVE DETA

20

d (V):
0

1x5.8
1x5.8
(We)

3140 310.883 310.224 0.822 311.146 311.968


3+044
IL-HIP

766738.033

CLIENT :
04 32 31.309

Widening

L=110.369m
Chainage=3159.859m
588.626 Ls:
Ts:
e%

3160 310.220 309.858 1.194 310.457 311.650 Level=311.652m


:

e=2.000
MINOR BRIDGE
0.6
CD-13
3+014.527

50 Kmph
5.6
60

%
Lc: 15.855

3180 309.804 310.496 1.023 310.324 311.347


3200
House

3200 309.816 310.220 0.857 310.214 311.071

L
House

3220 309.176 309.832 0.961 309.863 310.824

3240 308.757 309.149 1.131 309.473 310.604

3260 308.553 308.368 1.495 308.918 310.412


Nalla
Na
lla Nalla
Proposed Span(m)
Tank
Water

Design Chainage(m)

3280 308.255 307.646 1.422 308.826 310.248 Nalla


Nalla
BOX CULVERT

3300
3300 308.420 307.535 1.520 308.592 310.112
3+278
1x3x1.5

e=2.800
e=2.800
Proposal

L=151.897m
R=1000.000m
3320 308.475 308.412 1.331 308.674 310.004
Design Chainage

CONSULTANT :
Type of Structure
Radius:

3340 308.444 308.421 1.350 308.574 309.924


Easting:

Proposed Span (m) 1x3x


Existing Span (m) 1x0.9
3+278
1.5
HIP Chainage :

3360 308.416 308.324 1.201 308.671 309.872


Design Speed (V):
Nothing: 211969

Reconstruction
Extra Widening (We
1000

L=400.000m
)
Delta (Δ): 08 42 11.

R=14333.173m
BOX CULVERT
CURVE DETAIL-HI

3380 308.665 308.470 1.089 308.758 309.847


P

L
3400
1.091 Ls:
059 Ts:
e%
767003.135 Lc:

-
:

3400 308.461 308.743 1.098 308.753 309.851


80 Kmph
CD-14

2.8
-
3+298.914

30

Bore
%
151.897

3420 308.411 309.082 1.017 308.866 309.882


Tank
Water

Tin
Shed

3440 308.507 309.351 1.015 308.927 309.942


Bore

Tin
Shed

3460 308.671 308.839 1.258 308.772 310.029


Bore

3480 308.892 309.073 1.511 308.633 310.144 3500

PROJECT :
3500 308.842 309.367 1.046 309.241 310.287
Tin
Shed

3520 309.145 309.957 1.068 309.391 310.458

3540 308.714 309.644 1.126 309.531 310.657


Tin
Shed

Chainage=3559.859m
3560 e=2.500
308.637 309.358 1.149 309.735 310.884 Level=310.883m

3580 308.954 309.015 1.328 309.797 311.125 3600


3600 308.554 309.668 1.480 309.885 311.365
L=377.418m

e=2.500

3620 308.788 309.885 1.366 310.240 311.606

3640 309.252 310.003 1.413 310.434 311.847


DP

G=1.203
L=157.323m

3660 309.925 310.547 1.560 310.527 312.087

3680 310.143 310.944 1.271 311.057 312.328


Tin
Shed

3700
3700 310.941 311.208 1.227 311.341 312.568
Chainage=3717.182m
Level=312.775m
3720 311.021 311.369 0.974 311.835 312.809

3740 311.778 311.778 0.631 312.397 313.029

3760 312.554 313.177 -0.102 313.320 313.218

3780 313.421 313.966 -0.650 314.026 313.375 3800


Delta

L
Radius:
Easting:

3800 313.382 314.620 -1.060 314.560 313.501


(Δ) :

SABEESH
04
HIP Chainage :

DRAWN
Extra Widening

3820 313.915 315.927 -1.731 315.327 313.595


58

Design Speed (V)


767535

:
600

L=200.000m
35.
CURVE DETAIL-H

(We)

R=-12685.444m
.67 3
IP

3840 314.894 316.405 -2.044 315.702 313.658


GOURI
e=4.700
e=4.700
Lc:
4.916 Ls:
Nothing: 211980 013 Ts:

DRAWING TITLE :
L=52.113m
-

R=-600.000m
CD-15

3860 314.461 315.504 -1.154 314.842 313.689


3+843.207

80 Kmph
-
35

DESIGNED
FROM KM-3+000
e%: 4.7%
52.113

3880 313.141 314.250 0.357 313.331 313.689


L

3900
3900 312.230 312.420 0.995 312.661 313.657
DRAWING NUMBER:- ***/MU-BO/HIG/PP/04

SANDEEP

Chainage=3917.182m
Proposal
TO BHOKAR

Level=313.604m
CHECKED

3920 311.729 312.004 1.301 312.292 313.594


TO KM-4+000
Proposed Span
Design Chainage

Existing Span (m
Type of Structure

3940 311.010 311.942 1.516 312.003 313.519


PLAN & PROFILE (MUDKHED-BHOKAR ROAD)
Proposed Span(m)

NGK RAJU
) 2x0.6

Design Chainage(m)
3+916

3960 311.010 311.682 1.599 311.845 313.444


(m) 1x2x1.5

BOX CULVERT

APPROVED
Reconstruction
BOX CULVERT

3980 310.950 311.581 1.547 311.823 313.369


e=2.500
3+916
1x2x1.5

4000
4000 311.409 311.420 1.437 311.857 313.295
L=170.761m

SCALE ON A2

Vertical 1:200

DATE
Horizontal 1:2000

REV : R-0
JUL- 2020
DATE
JULY 2020
R0
No
LEVEL DIFF.

SUPERELEVATION

DESIGN CHAINAGE
@8M LHS FROM PCL

@8M RHS FROM PCL


3+916
1x2x1.5

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
Reconstruction

LEVEL DATUM- 306.0 (m)


BOX CULVERT

ORIGINAL GROUND/ROAD LEVEL


4000
4000 311.409 311.420 1.437 311.857 313.295

L=170.761m
4020 311.292 311.343 1.348 311.872 313.220

e=2.500

FIRST SUBMISSION
4040 311.402 311.623 1.111 312.034 313.145
TO MUDKHED

Radius:

4060 311.611 311.832 0.973 312.097


Easting:

313.070
HIP Chainage :

4080 311.723 311.727 0.728 312.267 312.996


Design Speed (V):
2000

4100
Extra Widening (We)
CURVE DETAIL-HIP

4100 311.628 311.804 0.562 312.359 312.921

G=-0.374

BY
L=358.187m
Nothing: 2119892.685 Ls:
Delta (Δ): 01 30 01.892 Ts:

L=52.378m
-
e%:

R=2000.000m
4120 311.671 312.385 0.628 312.218 312.846
CD-16

100 Kmph
-
-
-
4+101.199
767778.299 Lc: 52.378

4140 311.159 311.948 0.810 311.962 312.771

CLIENT :
4160 311.189 311.902 0.883 311.813 312.697
Radius:

L=78.667m
Easting:

4180 310.644 311.870 0.885 311.737 312.622


4200
HIP Chainage :

4200 310.510 311.062 1.083 311.464 312.547


Design Speed (V):
2000
Extra Widening (We)
CURVE DETAIL-HIP

L
R
4220 310.667 310.956 1.013 311.460 312.472
Nothing: 2119930.811 Ls:
Delta (Δ): 00 49 46.383 Ts:

-
e%:

4240 310.518 311.424 1.059 311.339 312.398


CD-17

100 Kmph
-
-
-
4+220.532
767891.381 Lc: 28.957

4260 310.455 311.109 1.010 311.313 312.323


Chainage=4275.369m
Level=312.266m
4280 310.297 311.175 0.907 311.342 312.249
4300
4300 310.315 311.186 0.807 311.381 312.188

4320 310.385 310.570 0.881 311.265 312.146

CONSULTANT :
4340 310.774 311.272 0.797 311.326 312.122

4360 310.801 310.686 0.811 311.307 312.118


Proposal

4380 309.713 310.456 1.310 310.823 312.132


Design Chainage

Nalla
Type of Structure

4400
Nalla
Nalla
Nalla
4400 309.486 310.306 1.797 310.368 312.165
Nalla
Existing Span (m) 2x0.9
4+408
Proposed Span (m) 1x3x1.5

4420 309.703 310.196 1.956 310.262 312.217


Reconstruction
BOX CULVERT

L=300.000m
R=21253.673m
4440 310.048 310.770 1.581 310.707 312.288

L=395.644m
Proposed Span(m)
Design Chainage(m)

4460 310.187 311.050 1.341 311.037 312.378


BOX CULVERT

4480 309.687 310.843 1.179 311.307 312.486


4+408
1x3x1.5

4500

PROJECT :
4500 310.155 311.221 1.465 311.148 312.613

4520 310.073 311.016 1.719 311.040 312.759

4540 310.728 310.988 1.619 311.305 312.924

4560 312.014 311.781 0.959 312.148 313.108


Chainage=4575.369m
Level=313.262m
4580 312.387 311.764 0.593 312.716 313.310
4600
4600 312.804 312.388 0.367 313.151 313.517

4620 312.903 312.680 0.269 313.456 313.725

4640 313.169 312.917 0.257 313.676 313.932

4660 312.927 312.972 0.418 313.723 314.140

4680 313.183 313.460 0.666 313.681 314.348


Radius:
Easting:

4700
G=1.038
L=217.246m

4700 313.099 313.800 0.435 314.120 314.555


HIP Chainage :
7683

Design Speed (V):


3000

4720 314.436
72.7

313.370 314.022 0.326 314.763


Extra Widening (We)
Delta (Δ): 03 50 03.5
55
CURVE DETAIL-HIP

Nothing: 2120100.905
51

80
Lc:
Ls:

4740 314.021 314.511 -0.164 315.134 314.970


Ts:
e%:

L=200.765m
-

R=-3000.000m
CD-18

Kmp h
-
4+731.073

-
-

4760 313.970 314.651 -0.171 315.349 315.178


200.765

4780 314.518 314.753 0.266 315.119 315.385


Chainage=4792.615m 4800
Level=315.516m
4800 313.272 314.368 0.721 314.870 315.591
SABEESH
DRAWN

4820 313.360 314.256 1.181 314.594 315.775

4840 312.622 314.189 1.174 314.756 315.930


N

GOURI
al
la

DRAWING TITLE :

4860 312.976 313.744 1.823 314.235 316.058


DESIGNED
FROM KM-4+000
L=150.000m

4880 313.149 312.971 3.216 312.942 316.159


R=-14440.011m

4900
Proposed Span(m)
Design Chainage(m)

4900 312.142 311.892 3.687 312.545 316.231


DRAWING NUMBER:- ***/MU-BO/HIG/PP/05
MINOR BRIDGE

SANDEEP
4x6
TO BHOKAR

CHECKED
N

4920 311.400 311.381 4.021 312.256 316.276


4+974
al

TO KM-5+000
la
Proposal

Chainage=4942.615m
4940 310.753 311.569 4.060 312.233 316.294 Level=316.294m
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)
Design Chainage

Type of Structure

NGK RAJU

4960 307.337 310.677 7.329 308.964 316.294


APPROVED
Proposed Span (m) 4x6

L=252.032m
Existing Span (m) 3x8.

G=-0.001
6
4+974

L=48.273m

4980 311.661 307.566 4.504 311.790 316.294


e=2.500

Chainage=4990.888m
Reconstruction

Level=316.293m
5000
MINOR BRIDGE

5000 311.970 311.405 3.605 312.712 316.317


SCALE ON A2

Vertical 1:200

DATE
N

Horizontal 1:2000
al

REV : R-0
JUL- 2020
la
DATE
JULY 2020
R0
No
LEVEL DIFF.

SUPERELEVATION

DESIGN CHAINAGE
@8M LHS FROM PCL

@8M RHS FROM PCL

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
4x6

HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
3x8.6

LEVEL DATUM- 314.0 (m)


4+974

ORIGINAL GROUND/ROAD LEVEL


5000
5000 311.970 311.405 3.605 312.712 316.317 Reconstruction
MINOR BRIDGE
Na
ll
a

5020 312.203 313.152 2.418 314.112 316.530

e=2.500
We
ll
We

FIRST SUBMISSION
ll

5040 313.628 314.327 1.882 315.086 316.968


TO MUDKHED

We

L=100.000m
ll

R=1786.052m
5060 314.782 315.173 1.036 316.594 317.630
Radius:
Easting:

5080 315.880 315.932 0.820 317.696 318.516


We

Chainage=5090.888m
ll

5100
Level=319.092m

L
G
HIP Chainage :

5100 318.583 Chainage=5103.390m


316.330 317.165 1.019 319.602
Design Speed (V):

Level=319.792m

BY
2000
Extra Widening (We)

Proposal
CURVE DETAIL-HIP

5120 318.276 317.220 0.948 319.703 320.652


Na
ll

Nothing: 2120259.953 Ls:


Delta (Δ): 02 50 54.195 Ts:
a

Design Chainage

Type of Structure
-
e%:

Existing Span (m)


Proposed Span (m)

5140 319.155 318.752 0.836 320.667 321.502


65 Kmph
CD-19

-
-

L=99.427m
-
5+133.173

CLIENT :
R=2000.000m
768742.145 Lc: 99.427

2x9.5
5+200

5160 320.074 320.591 0.657 321.493 322.151


Widening
2x9.5(sk)

Ca
nal
MINOR BRIDGE

5180 321.585 322.292 0.158 322.438 322.597 5200


Ca
nal

Proposed Span(m)
Design Chainage(m)
5200 318.845 319.953 0.029 322.812 322.840
MINOR BRIDGE

L=200.000m
R=-1977.701m
Radius:

5220 322.294 320.451 0.421 322.460 322.882


2x9.5
Easting:

L=55.483m
5+200
HIP Chainage :

5240 320.258 319.974 0.797 321.924 322.721


Design Speed (V):
2000
Extra Widening (We)
CURVE DETAIL-HIP

5260 320.484 319.751 0.800 321.557 322.358


Nothing: 2120309.615 Ls:
Delta (Δ): 02 07 01.304 Ts:

-
e%:

5280 319.426 319.234 0.696 321.097 321.793


CD-20

50 Kmph
-
-

L=73.898m
5+275.313

5300

R=-2000.000m
768875.348 Lc: 73.898

5300 320.280 Chainage=5303.390m


318.448 318.361 0.746 321.025 Level=320.875m

L
G
Chainage=5321.117m
5320 317.916 317.689 0.867 319.259 320.125 Level=320.075m

CONSULTANT :
5340 317.136 316.977 0.955 318.367 319.323

5360 316.278 316.097 1.259 317.486 318.745

L=90.000m
R=1775.909m
5380 316.215 315.861 1.630 316.762 318.392
5400
5400 316.745 316.642 1.229 317.037 318.265
Chainage=5411.117m
Level=318.292m
5420 317.327 317.097 0.848 317.492 318.341

5440 317.514 317.790 0.569 317.882 318.452

5460 317.902 317.806 0.213 318.350 318.562

5480 318.527 318.379 -0.283 318.955 318.673


5500

PROJECT :
5500 318.818 318.733 -0.501 319.285 318.783

5520 319.044 318.111 -0.458 319.353 318.894

5540 318.941 318.543 -0.049 319.054 319.005

5560 317.994 317.650 0.344 318.771 319.115

5580 318.876 317.402 0.744 318.482 319.226


G=0.553
Proposal

L=331.996m

5600
5600 318.498 317.439 1.194 318.143 319.336
Design Chainage

Type of Structure

5620 318.198 317.187 1.337 318.110 319.447


Proposed Span(m)
Design Chainage(m)
Proposed Span (m) 1x1.2
5+628

Existing Span (m) 1x0.75

PIPE CULVERT

5640 317.936 317.523 1.117 318.441 319.558


Reconstruction

1x1.2
5+628
PIPE CULVERT

5660 318.456 318.199 0.884 318.785 319.668

5680 318.757 318.385 1.015 318.763 319.779


5700
5700 318.786 318.025 1.196 318.693 319.890

5720 318.263 317.368 1.700 318.301 320.000

Chainage=5743.114m
5740 317.708 317.264 2.002 318.109 320.111 Level=320.128m

5760 317.824 317.609 1.974 318.243 320.216


L=909.326m

5780 317.794 318.051 1.924 318.384 320.308


5800
N
al
la
5800 317.735 317.637 2.249 318.138 320.387
SABEESH
DRAWN
Proposal

5820 317.943 317.109 2.249 318.201 320.451


Design Chainage

5840 318.035 317.472 2.633 317.869 320.501


Type of Structure

GOURI
DRAWING TITLE :
Proposed Span(m)
Proposed Span (m) 4x5

Design Chainage(m)

5860 316.117 315.694 3.210 317.328 320.538


Existing Span (m) 3x6.9
5+860

DESIGNED
MINOR BRIDGE

FROM KM-5+000
Reconstruction

4x5

L=250.000m

5880 316.114 317.187 2.738 317.823 320.561


R=-28915.380m
5+860
MINOR BRIDGE

5900
5900 317.200 318.071 2.305 318.265 320.570
Bore

DRAWING NUMBER:- ***/MU-BO/HIG/PP/06

SANDEEP
TO BHOKAR

CHECKED

5920 317.975 317.635 2.088 318.477 320.565


TO KM-6+000
Na
lla

5940 318.211 318.299 1.829 318.717 320.547


PLAN & PROFILE (MUDKHED-BHOKAR ROAD)

NGK RAJU

5960 317.867 318.191 1.591 318.923 320.514


APPROVED
Tow
er

5980 317.953 318.300 1.410 319.058 320.468


e=2.500

Chainage=5993.114m
6000
Level=320.430m
6000 317.500 318.686 1.124 319.284 320.408
SCALE ON A2

Vertical 1:200

DATE
Horizontal 1:2000

REV : R-0
JUL- 2020
DATE
JULY 2020
R0
No
LEVEL DIFF.

SUPERELEVATION

DESIGN CHAINAGE
@8M LHS FROM PCL

@8M RHS FROM PCL

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
To
we

HORIZONTAL ALIGNMENT
r

ORIGINAL GROUND LEVEL


ORIGINAL GROUND LEVEL
LEVEL DATUM- 316.0 (m)

ORIGINAL GROUND/ROAD LEVEL


6000
Level=320.430m
6000 317.500 318.686 1.124 319.284 320.408

W
EL
L
6020 318.341 319.348 0.519 319.828 320.346

e=2.500

FIRST SUBMISSION
6040 318.859 319.540 0.200 320.083 320.284
TO MUDKHED

G=-0.312
6060 320.306

L=112.124m
319.723 319.805 -0.085 320.221

Na
ll
a
6080 318.544 319.387 -0.013 320.172 320.159
6100
Type o
Proposa
l
Design

Chainage=6105.238m
d

6100 318.514 318.479 0.467 319.629 320.097


Ch

BY
Level=320.081m
f Struct
Span (m
ure
Propose ainage

6120 318.316 317.782 0.973 319.073 320.046


P IP
Reconst

6140 319.436
1x0.6

318.702 319.016 0.602 320.038


.2
6+12
Existing Span (m) 1x1 6

CLIENT :
E CULV
ruction

Proposed Span(m)
Design Chainage(m)
6160 318.355 318.843 0.508 319.565 320.073
ERT

PIPE CULVERT
6180 318.637 319.107 0.555 319.597 320.152

L=130.000m
1x1.2

R=9180.077m
6+126
6200
6200 318.729 318.897 0.534 319.740 320.274
Extra
Delta

6220 319.137 319.277 0.496 319.945 320.440


W
Nothin

g:
a

Chainage=6235.238m
CUR

Speed

Level=320.596m
6240 319.220 318.745 0.374 320.275 320.649
76
2 0
Eastin inage :

(V):
6

Design idening (We


3000
)
HIP Ch VE DETAIL

86.8

6260 319.652 319.901 0.198 320.672 320.870


g: 21 9783.187

.912
-HIP

L=73.623m
L

R=3000.000m
Ts:

-
c
Radius: ): 01 24 21 41 Ls:

e%:
:

100 Km

6280 320.599 320.201 0.254 320.836 321.090


ph

6300
-
CD-2

-
-
6+258 1
.397
73.623

6300 320.159 320.285 0.270 321.042 321.311

6320 320.833 320.442 0.389 321.143 321.532

CONSULTANT :
6340 320.938 320.363 0.503 321.251 321.753

6360 320.573 320.301 0.546 321.429 321.974

6380 320.999 320.887 0.652 321.542 322.195 6400

L=157.292m
6400 321.214 320.684 0.847 321.568 322.416

6420 321.455 321.297 0.813 321.823 322.637

6440 321.519 320.991 0.807 322.051 322.858

G=1.105
L=424.965m
6460 321.842 321.156 0.858 322.221 323.079

6480 321.595 321.541 0.687 322.612 323.300 6500

PROJECT :
6500 321.898 321.910 0.803 322.717 323.520

6520 322.448 321.760 0.889 322.852 323.741

6540 323.171 322.283 0.928 323.035 323.962

6560 324.002 322.621 1.281 322.903 324.183

6580 324.366 322.977 0.886 323.518 324.404 6600

6600 323.946 323.316 0.213 324.413 324.625


N o
Eas ti
th
n

Des
in
g
HIP C :
g

ig
V

:
Delta :

n
E

6620 324.076 323.745 0.213 324.632 324.846


W
(Δ):
D

2
7

3
CUR ge :

7
12 0
2
8
ETAIL

6640 324.711 323.971 0.308 324.758 325.067


5

Extra Speed (V
4
0

)
800
Radiu idening ( :
6
haina 70216.75
-HIP

We)
.5

Chainage=6660.202m
67

6660 325.297 324.867 0.584 324.704 325.288 Level=325.290m


2 Lc
:

e
Ls:
.642 Ts:
%
5
2

-
3.29
CD-2 8

80 Km
3
-

6680 325.606 325.252 0.731 324.761 325.491


p
-
: .6
h
6+72 22.228

6700
Na
lla

6700 326.197 325.478 0.194 325.466 325.659

6720 327.088 325.328 0.407 325.384 325.792


L=522.228m

e=3.600
e=3.600
R=-800.000m

6740 327.842 325.597 0.039 325.850 325.889


Na
lla

6760 327.814 325.511 -0.005 325.954 325.950


L=200.000m
R=-11254.357m

6780 327.079 325.383 0.046 325.929 325.976 6800


6800 327.317 324.631 -0.272 326.237 325.966
SABEESH
DRAWN

6820 326.941 323.025 0.107 325.814 325.921


N
al
la
6840 326.029 321.414 1.149 324.691 325.840
GOURI
DRAWING TITLE :

Chainage=6860.202m
6860 325.358 321.492 2.217 323.507 325.723 Level=325.722m
DESIGNED
FROM KM-6+000

6880 324.347 321.159 2.052 323.536 325.589 690


0
P r o

323.529
sig

6900 324.036 322.044 1.926 325.454


Proposed Span(m)

DRAWING NUMBER:- ***/MU-BO/HIG/PP/07

SANDEEP
Pro
stin

Design Chainage(m)
g
hai

G=-0.673
n
TO BHOKAR

CHECKED
Exi e of S
Typ posal

BOX CULVERT

L=98.201m
a

6920 324.212 322.013 2.055 323.264 325.320


g

TO KM-7+000
tru
e

c
(
t u
(m
n C Span m)
)

De posed pan re

6+992
1x2x1.5

6940 323.514 321.680 2.135 323.050 325.185


R

PLAN & PROFILE (MUDKHED-BHOKAR ROAD)


e c
992

Chainage=6958.403m
6+ x1.5

NGK RAJU
ons

6960 322.860 322.048 2.071 322.981 325.051 Level=325.062m


BO truct
i

APPROVED
1x0 CUL on
1x2 .75 VERT

6980 323.286 322.366 2.079 322.856 324.936


700
0

7000 323.111 322.469 2.012 322.842 324.854


SCALE ON A2

Vertical 1:200

DATE
Horizontal 1:2000

REV : R-0
JUL- 2020
TO MUDKHED TO BHOKAR

Nalla

De
s
Pro ign C
Exi pose hain
stin d S age
Ty g pa
p
Pro e of Span n (m 7+
po S ) 6
sal truct (m) 1x1 38
ure 1x0 .2
P .75

Nalla
Re IPE
con CU
str LVE
uct R
ion T H
E IP CU
No asti Cha RVE

<
D th ng ina D

7500
---
R elta ing : ge ET

--

740
Ex adiu (Δ : 77 : AIL

TO
De tra s: ): 21 08 -H

D
O
13 214 18 IP

RL
sig W

0
79 .90 7 C

760
4 n ide

I
CD-2 2 Sp n 3 2 .7 1 +6 D
P
E T A IL-HI 7+421.41 46 i 3
ee ng 20 3. 17 L 3 -2
ED 2.9 d 0 16 c 8 5
CURV ge : c: 6 80 (V (We 6 Ls: : 4 .35

0
0 L 7. 6
haina 770604.16 6 Ls: ): ) Ts
3
-2 6 8 HIP C g: 6 .68 - e% : 2
60 72
n 45 s:
CD 6.91 .05 Easti g: 2121 37.244 T : 7.0% 65 0. 7 -
:
4 11 - in
Noth Δ): 24 0 50
2 e% HI CU
Km 6 .0%
WEL

1 Ea P Ch RVE
L

IP 7+ c: ( 1 0.6

73
-H L : - Delta : ph ph No sting ainag DET
IL - s (We) 65 Km

77
Ls : Radiu idening :

00
TA 20
HP

De thing : e : AIL
E
D : .8 94 Ts : W
Extra Speed ( V )
Ra lta (Δ : 2 7709
-H

00
7
E e 44 2.5 65 e% - ph IP
V n d
R ag 0 3 .2
Km Desig Ex ius: : ) 121 97.9 C
CU ain 77 212 40 0
Ota

De tra W
1 0 5 97 97 7+83 D-26
3
Ch 21 0 12 000 ) 10 sig id 1 5 .88 5
I P ing: : 0 3 e n S eni 4 8.2 0 Lc: .298
H st ng : (W : pe ng 10 31 Ls: 77.
Ea thi (Δ) ing )
ed (W T s 75
No lta s: den d (V (V) e)
e% : 30 7
e u i e :
D di W pe :
4
-
Ra tra n S 65 - .6%
Ex sig Km
De
72

ph
00

WEL

78
L

00
De
Pro sign
C
Ex pose hain
i
Ty sting d Sp age
pe a
Pro of Span n (m 7+
po S )
2
99 .5 sal truc (m) 1x 914
RT
71

tur 1.
6+ 2x1 5 VE e 1 x0 2

79
1 0.7 CUL tion
x
00

P .7
1x X ruc Re IPE 5

00
con CU
) BO nst str LVE
o uct
n
(m e
r ec ion RT
a tu R
Sp ruc
g t
in S
ist of
Ex pe
Ty

80
00
70
00

HI CU
Ea P Ch RV
No sting aina E DE
De thin : ge TA
IL-
Ra lta g: 77 : HI
Ex dius (Δ): 212 1167 P
De tra W : 03 135 .89 8
+0
sig 2 9
3 2 .52 5
n S iden L 09
pe ing 800 4.77 0 L c: .257
ed (W 5 s
(V e) Ts :
): e% :
:
80 - 3.6%
Km
ph

CLIENT : CONSULTANT : PROJECT : DRAWING TITLE : SCALE ON A2


PLAN & PROFILE (MUDKHED-BHOKAR ROAD) Horizontal 1:2000
FROM KM-7+000 TO KM-8+000 Vertical 1:200

DRAWING NUMBER:- ***/MU-BO/HIG/PP/8 DATE


DRAWN DESIGNED CHECKED APPROVED JUL- 2020
JULY 2020 R0 FIRST SUBMISSION
SABEESH GOURI SANDEEP
DATE No BY
NGK RAJU REV : R-0
DATE
JULY 2020
R0
No
LEVEL DIFF.

SUPERELEVATION

DESIGN CHAINAGE
@8M LHS FROM PCL

@8M RHS FROM PCL

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 316.0 (m)

ORIGINAL GROUND/ROAD LEVEL


7000 323.111 322.469 2.012 322.842 324.854

7020 322.887 322.847 1.447 323.360 324.806

FIRST SUBMISSION
7040 323.620 322.998 1.105 323.686 324.791
TO MUDKHED

7060 324.044 323.158 0.795 324.015 324.810

L=166.661m
7080 323.712 323.317 0.691 324.172 324.863

7100 323.878 323.461 0.610 324.339 324.948

BY
7120 323.867 322.319 0.582 324.486 325.068

e=2.500
7140 324.134 323.175 0.702 324.518 325.220

L=350.000m
L
R

CLIENT :
R=11948.583m
7160 324.414 323.382 0.764 324.642 325.407

e=2.500
7180 324.470 324.325 0.456 325.170 325.626

7200 324.699 324.133 0.479 325.401 325.879

7220 324.806 324.573 0.589 325.577 326.166

7240 325.075 325.169 0.692 325.794 326.486

L=157.023m
7260 325.422 326.167 0.758 326.082 326.840

7280 326.200 325.648 0.720 326.507 327.227

7300 325.940 326.400 0.932 326.716 327.647 Chainage=7308.403m


Level=327.834m

7320 326.958 325.537 1.069 327.027 328.096

CONSULTANT :
7340 327.005 326.271 1.199 327.347 328.547

7360 328.274 326.980 1.273 327.725

L=80.000m
328.998

G=2.257
L=118.641m
7380 328.654 327.660 1.217 328.232 329.450

7400 330.246 328.981 0.662 329.239 329.901

7420 331.963 329.120 -0.478 330.831 330.352 Chainage=7427.044m


Level=330.511m

L=62.946m
R=150.000m
7440 333.749 329.750 -0.865 331.665 330.799

7460 332.291 330.445 0.272 330.953 331.225

7480 332.421 330.304 0.226 331.403 331.629

PROJECT :
7500 L=80.000m 332.217 330.410 0.353 331.658 332.011

7520 332.562 330.568 0.298 332.073 332.371

e=7.000
e=7.000
L=200.000m
7540 333.580 331.303 0.178 332.532 332.710
L

R=-18183.527m

7560 333.814 331.014 0.383 332.643 333.026

7580 333.189 331.308 0.663 332.657 333.320


L=60.000m

7600 333.480 330.763 1.334 332.257 333.592

7620 334.436 330.802 1.891 331.950 333.842 Chainage=7627.044m


Level=333.925m

7640 333.609 332.112 1.670 332.405 334.075


L=47.272m
R=200.000m

7660 333.383 331.109 1.885 332.422 334.306


Proposed Span(m)

7680 333.087 330.990 1.687 332.850 334.537


Design Chainage(m)
PIPE CULVERT

G=1.157
L=118.417m

7700 332.854 331.938 1.893 332.875 334.769


L=60.000m
1x1.2
7+638

7720 333.400 331.728 2.219 332.782 335.000

7740 334.031 332.213 2.071 333.160 335.231 Chainage=7745.461m


Level=335.295m
L=44.421m

7760 334.231 332.855 1.853 333.622 335.474


L

7780 334.051 333.551 1.648 334.110 335.757

7800 334.850 333.792 1.432 334.652 336.083


SABEESH
DRAWN

7820 336.016 334.363 1.200 335.251 336.452


e=4.600
e=4.600

7840 335.766 334.817 1.063 335.800 336.862


GOURI
L=77.757m
R=-410.000m

DRAWING TITLE :

7860 336.156 335.207 1.058 336.258 337.315


DESIGNED
FROM KM-7+000

7880 336.124 335.351 1.358 336.452 337.811


L=250.000m
R=9429.118m
L

7900 336.976 335.590 1.843 336.505 338.349


Proposed Span(m)
Design Chainage(m)

DRAWING NUMBER:- ***/MU-BO/HIG/PP/09

SANDEEP
PIPE CULVERT
TO BHOKAR

CHECKED

7920 337.744 336.347 1.638 337.292 338.929


TO KM-8+000
1x1.2
7+914

7940 337.736 337.813 0.963 338.589


L=51.523m

339.552
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)

NGK RAJU

7960 338.581 338.256 1.112 339.106 340.217


L

APPROVED

7980 339.521 339.142 1.009 339.915 340.925


Chainage=7995.461m
Level=341.501m
8000 339.404 340.118 0.975 340.699 341.674
SCALE ON A2

Vertical 1:200

DATE
Horizontal 1:2000

REV : R-0
JUL- 2020
e=3.600
e=3.600
L=47.336m
R=800.000m
TO MUDKHED TO BHOKAR

7+ .2
1x1 75
Rec

1x0 CUL n

914
PIP tructi
ons

.
E
VER
o

790
T

IP
DETAIL-H 9+139.143
0
CURVE
inage :
HIP Cha 771713.195
Easting: 2122173.866
: 43.209
Nothing
): 01 55
Delta (Δ 1200
CD-29
ETAIL-HI
P 1 Radius: ening (We)
CURVE D 8+758.68 id
Extra W eed (V):
ge : 19.815
HIP Chaina 771533.486 Lc: 75 Design
Sp
Easting: 706 Ls:
2121838. -
Nothing: 03 47 03.532 Ts: 7.0%
:
Delta (Δ): 30 0 e%
Radius: 0.6
e)
ening (W 80 Kmph
800 Extra Wid d (V):
ee
0 Design Sp

9000
8900
HIP ing:

8800
Eas
Not (Δ):
Delt

CUR age : 67.895 Ls:


Rad Widen d (V):

Cha
t
Extr n Spe

hing
Des

a
ius:

VE D
in
a
ig

:
771

ETA
212

870
0 3

1
135 4.775 %: 3.

IL-H 8+00 47.33


e
ing

23 2
800 )

0
9.52
(We

IP

TO JAMBHALI -----
0

CD- 57
L

810
c:
Ts:

9.2
e

0 HIP CUR
27
80 K

860
Eas Cha VE D

Val
Bor
-

ve
No ting: inage ETAI

e
3
mph

De thing L-H
-

:
6%

0
: 77 IP
Ra lta (Δ 212 1395

>
diu ) C
Ext s: : 6 131 964 8+2 D-28
.
8 04 8.66 42
De ra W 07. 9 Lc: 1 .189
sig ide
n S nin 150 321 Ls: 78.
pee g ( 2
Ts: 70 03

850
d ( We
Tem

V): )
ple

e%
: 7 -
.
50 0.6 0%

0
Km
ph
82

840
0 0

0
8300
Bor
e

CLIENT : CONSULTANT : PROJECT : DRAWING TITLE : SCALE ON A2


PLAN & PROFILE (MUDKHED-BHOKAR ROAD) Horizontal 1:2000
FROM KM-8+000 TO KM-9+000 Vertical 1:200

DRAWING NUMBER:- ***/MU-BO/HIG/PP/10 DATE


DRAWN DESIGNED CHECKED APPROVED JUL- 2020
JULY 2020 R0 FIRST SUBMISSION
SABEESH GOURI SANDEEP
DATE No BY
NGK RAJU REV : R-0
DATE
JULY 2020
R0
No
LEVEL DIFF.

SUPERELEVATION

DESIGN CHAINAGE
@8M LHS FROM PCL

@8M RHS FROM PCL

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 336.0 (m)

ORIGINAL GROUND/ROAD LEVEL


Level=341.501m
8000 339.404 340.118 0.975 340.699 341.674

e=3.600
e=3.600
8020 341.581

L=47.336m
340.557 340.803 0.855 342.435

R=800.000m

FIRST SUBMISSION
8040 341.519 341.733 1.010 342.187 343.197
TO MUDKHED

L
8060 341.194 343.020 1.034 342.924 343.959

L
8080 342.158 343.331 0.738 343.983 344.720

8100 343.509 344.609 0.103 345.379 345.482

BY
L=70.000m
8120 345.858 346.180 -0.480 346.723 346.243

8140 347.104 346.966 -0.302 347.307 347.005

CLIENT :
G=3.808
L=304.436m
8160 348.734 347.759 0.046 347.721 347.767

8180 348.461 348.365 -0.025 348.553 348.528

8200 349.116 349.028 0.147 349.143 349.290

8220 349.933 349.738 0.216 349.835 350.052

8240 351.016 350.425 0.016 350.797 350.813

L=178.203m
R=-150.000m

e=7.000
e=7.000
8260 351.427 351.076 0.111 351.464 351.575

8280 351.968 351.679 0.464 351.873 352.337

Chainage=8299.897m
8300 352.541 352.226 0.699 352.399 353.098 Level=353.094m

8320 353.479 352.908 0.927 352.916 353.843

CONSULTANT :
8340 353.159 353.497 0.531 354.022 354.554

8360 353.486 353.644 0.579 354.653 355.231

L=80.000m
8380 353.857 354.250 0.934 354.941 355.875

8400 353.943 354.758 1.115 355.371 356.485

8420 354.822 354.386 1.402 355.660 357.062

8440 355.142 354.967 1.556 356.048 357.605

8460 355.909 355.384 1.463 356.652 358.114

8480 356.281 356.347 1.335 357.254 358.590

PROJECT :
8500 356.754 356.473 1.384 357.648 359.032

e=2.500
8520 357.603 356.991 1.551 357.889 359.441

8540 357.935 357.214 1.651 358.164 359.816


L=274.684m

8560 e=2.500
358.027 357.183 1.817 358.339 360.157

8580 358.095 357.292 1.937 358.528 360.464

8600 358.267 357.822 1.881 358.857 360.739

8620 358.186 357.828 1.777 359.202 360.979

8640 358.571 358.289 1.710 359.475 361.186

8660 358.903 358.808 1.544 359.815 361.359

8680 358.870 359.231 1.310 360.188 361.499

8700 359.350 359.317 1.158 360.446 361.605


L=800.000m
R=-11899.983m

8720 359.617 359.574 1.023 360.654 361.677


L=75.000m

8740 359.805 359.904 0.886 360.829 361.716


L
R

8760 360.137 360.450 0.709 361.011 361.721


e=7.000
e=7.000

8780 360.432 360.286 0.353 361.339 361.693

8800 360.531 360.398 0.136 361.494 361.630


SABEESH
DRAWN
L=75.000m

8820 360.368 360.296 0.134 361.400 361.535

8840 360.425 360.124 0.120 361.286 361.405


GOURI
DRAWING TITLE :

8860 359.898 360.087 0.124 361.118 361.243


DESIGNED
FROM KM-8+000

8880 359.955 359.996 0.133 360.913 361.046

8900 359.669 359.816 0.170 360.646 360.816


DRAWING NUMBER:- ***/MU-BO/HIG/PP/11

SANDEEP
TO BHOKAR

CHECKED

8920 359.589 359.696 0.183 360.369 360.552


TO KM-9+000

8940 359.383 359.153 0.157 360.098 360.255


PLAN & PROFILE (MUDKHED-BHOKAR ROAD)

NGK RAJU

8960 359.124 359.154 -0.023 359.946 359.924


APPROVED

8980 360.116 358.543 -0.120 359.679 359.559


e=2.500
L=275.360m

9000 359.139 358.334 -0.319 359.479 359.161


SCALE ON A2

Vertical 1:200

DATE
Horizontal 1:2000

REV : R-0
JUL- 2020
DATE
JULY 2020
LEVEL DIFF.

R0
No
SUPERELEVATION

DESIGN CHAINAGE
@8M LHS FROM PCL

@8M RHS FROM PCL

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 352.0 (m)

ORIGINAL GROUND/ROAD LEVEL

L=275.360m
9000 359.139 358.334 -0.319 359.479 359.161 TO JAMBHALI ----- >

9020 358.582 358.439 -0.558 359.287 358.729


9000

e=2.500
9040 358.186 358.041 -0.744 359.007 358.264

FIRST SUBMISSION
TO MUDKHED

9060 357.978 358.102 -0.745 358.510 357.765


Radius:
Easting:

9080 357.573 357.244 -0.564 357.797 357.232


HIP Chainage :

Chainage=9099.897m
Design Speed (V):

9100 356.189 356.436 -0.052 356.717 356.666 Level=356.669m


1200
Extra Widening (We)

L
G
CURVE DETAIL-HIP

Nothing: 2122173.866
Delta (Δ): 01 55 43.209

Chainage=9122.494m
9120 355.293 355.406 0.164 355.919 356.083
9100

BY
80

Level=356.010m
Ls:
Ts:
e%:
-
Kmp
CD-30

R
h
-
-
9+139.143

9140 354.597 354.150 0.452 355.111 355.564


771713.195 Lc: 40.394

Proposal

L=40.394m
9160 354.351 353.241 1.105 354.103 355.209

CLIENT :
Design Chainage

Type of Structure
Existing Span (m)
Proposed Span (m)

Nall
a
9180 353.174 351.958 0.217 354.803 355.020

Proposed Span(m)
Design Chainage(m)
9+190

L=120.000m
4x5.75

Nall

R=2409.742m
a

MINOR BRIDGE
9200 352.981 354.058 0.327 354.671 354.998
Widening
4x5.75(sk)

4x5.75
We

L=85.202m
ll

9+190
MINOR BRIDGE

9220 354.753 354.039 0.281 354.860 355.141


9200
Na
a ll

Chainage=9242.494m
9240 354.762 354.740 -0.052 355.503 355.450 Level=355.501m
Na
lla
9260 355.296 355.212 -0.329 356.191 355.862

R
Radius:
Easting:

L=41.909m
9280 356.226 355.649 -0.384 356.660 356.275
HIP Chainage :

Design Speed (V):


1500

9300 356.603 356.092 -0.165 356.854 356.688


Extra Widening (We)
771770.418
CURVE DETAIL-HIP

9320 356.832 356.545 -0.292 357.394 357.101


Nothing: 2122286.523 Ls:
Lc:

9300
Delta (Δ): 01 36 02.860 Ts:

-
e%:
CD-31

80 Kmph
-
-
-
9+265.496

9340 357.593 356.329 -0.121 357.635 357.514


41.909

CONSULTANT :
9360 356.838 357.559 -0.191 358.118 357.927

9380 357.655 357.279 -0.013 358.353 358.340

9400 357.806 357.634 0.308 358.446 358.753

9420 357.947 357.617 0.482 358.684 359.167


9400

9440 358.313 358.260 0.741 358.838 359.580

9460 358.766 358.661 0.656 359.337 359.993

9480 358.976 359.223 0.674 359.732 360.406

9500 359.052 359.477 0.779 360.039 360.819

PROJECT :
G=2.065
9520 359.289 359.616 0.839 360.393 361.232
9500

9540 L=537.138m 360.308 359.979 0.822 360.823 361.645

9560 360.437 360.195 0.784 361.274 362.058

9580 360.814 360.508 0.880 361.590 362.471

9600 361.304 360.813 1.107 361.776 362.884

9620 361.450 361.292 1.004 362.294 363.297


9600

9640 361.885 361.804 0.930 362.780 363.710

9660 362.458 362.151 1.014 363.110 364.123

9680 362.491 362.392 1.140 363.396 364.536


L=765.715m

9700 363.271 362.728 1.082 363.867 364.949

9720 363.562 363.373 1.087 364.276 365.362


9700

9740 364.314 363.792 0.823 364.953 365.775

9760 364.661 364.350 0.690 365.499 366.188

Chainage=9779.632m
9780 365.478 364.844 0.687 365.914 366.601 Level=366.594m

Gate

9800 365.104 365.426 0.607 366.398 367.004

Val
ve

9820 366.054 365.678 0.609 366.778 367.387


9800
SABEESH
DRAWN

9840 366.044 366.070 0.663 367.087 367.751

9860 366.133 365.748 0.952 367.143


GOURI

368.095
DRAWING TITLE :

9880 366.508 365.864 1.393 367.025 368.419


DESIGNED
FROM KM-9+000

9900 366.111 365.807 1.724 367.000 368.723

9920 367.073 365.636 1.891 367.118 369.008


9900
DRAWING NUMBER:- ***/MU-BO/HIG/PP/12

SANDEEP
TO BHOKAR

CHECKED

9940 367.222 365.928 2.042 367.231 369.273


TO KM-10+000

367.301
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)

9960 367.249 365.888 2.217 369.519


NGK RAJU

9980 366.505 366.024 2.344 367.400 369.744


e=2.500

APPROVED

10000 366.811 366.133 2.488 367.463 369.950


SCALE ON A2

Vertical 1:200

DATE
Horizontal 1:2000

REV : R-0
JUL- 2020
DATE
JULY 2020
LEVEL DIFF.

R0
No
SUPERELEVATION

DESIGN CHAINAGE
@8M LHS FROM PCL

@8M RHS FROM PCL

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 362.0 (m)

ORIGINAL GROUND/ROAD LEVEL


10000 366.811 366.133 2.488 367.463 369.950 10000
10020 366.523 365.857 2.460 367.676 370.137
Na
lla

e=2.500
10040 366.807 365.861 2.814 367.490 370.303

FIRST SUBMISSION
Sa
ma
di
TO MUDKHED

10060 367.287 365.621 3.178 367.273 370.450 Na


lla

Proposed Span(m)

L
Design Chainage(m)
Nall
a

BOX CULVERT
10080 367.469 366.985 3.281 367.296 370.578

L=600.000m
1x2x1.5

R=-20324.098m
10+070
10100 367.888 367.514 2.511 368.175 370.685 10100
Na
lla

Type
Design

Existin
10120 368.864 368.179 1.597 369.177 370.773

BY
f
d

Proposa
l
gS
S
S

tr
p
Radius:
Easting:

a
Chaina

Bo
re
n

e=4.700
e=4.700
10140 369.815 368.960 0.676 370.165 370.841
ge

ucture

L=98.169m
R=600.000m
HIP Chainage :

(m) 1

Re
Propose pan (m) 1
Design Speed (V):

10160 369.943 369.916 0.225 370.666 370.890


co
600

x0

CLIENT :
Extra Widening (We)

.7
10+07

st
5
0
x2x1.5
CURVE DETAIL-HIP

ru

10180 370.271 369.529 0.098 370.820 370.919


ctio
Nothing: 2123050.780 Ls:

BOX CU n
Delta (Δ): 09 22 27.880 Ts:

LVERT
80 Kmph
CD-32

10200 369.667 369.408 1.059 369.870

L
370.928
35
10+136.358

10200
e%: 4.7%
772187.884 Lc: 98.169

10220 369.633 368.986 0.446 370.472 370.918

10240 369.239 368.670 0.578 370.309 370.888

10260 369.051 368.944 0.422 370.415 370.838

10280 369.290 368.585 0.235 370.533 370.768

10300 369.464 368.830 0.204 370.475 370.679


10300

10320 369.186 368.466 0.287 370.284 370.570

10340 368.708 368.725 0.472 369.970 370.442

CONSULTANT :
10360 368.510 368.879 0.894 369.400 370.293 Ot
a

Chainage=10379.632m
10380 368.730 368.239 0.852 369.274 370.126 Level=370.129m

10400 368.699 368.428 0.796 369.152 369.948


10400
W
ell

10420 367.877 367.559 0.777 368.993 369.771

10440 367.787 367.971 0.875 368.719 369.593

10460 368.226 367.361 0.582 368.834 369.416

10480 368.016 367.406 0.567 368.672 369.239

10500 367.930 367.487 0.598 368.463 369.061


10500

PROJECT :
10520 L=591.436m 367.738 367.238 0.601 368.283 368.884

G=-0.887
10540 368.201
L=298.939m
366.953 366.913 0.506 368.706

10560 366.820 367.165 0.378 368.152 368.529

10580 366.702 366.620 0.671 367.681 368.352

10600 366.943 366.443 0.798 367.376 368.174


10600
HP

10620 367.569 366.446 0.992 367.004 367.997

10640 366.913 366.666 0.646 367.174 367.820

10660 366.489 365.840 0.649 366.993 367.642

Chainage=10678.571m
10680 366.270 365.706 0.640 366.825 367.465 Level=367.477m

10700 365.717 365.921 0.840 366.470 367.311


Nalla

10700
Proposal

10720 365.879 365.579 1.119 366.079 367.197


Design Chainage

Type of Structure

10740 364.907 365.335 1.500 365.624 367.124


Proposed Span (m) 1x7
Existing Span (m) 3x0.9

10760 364.605 364.483 1.837 365.255 367.092


10+812

Reconstruction

10780 363.949 364.284 2.167 364.933 367.100


MINOR BRIDGE

Na
lla

Bor
e

10800 364.100 364.375 2.345 364.804 367.149


10800
Nal
la
Proposed Span(m)
Na
lla

Design Chainage(m)

Nalla

10820 365.015 364.236 2.563 364.676 367.238


MINOR BRIDGE

L
R

SABEESH

la
1x7

Nal
DRAWN
10+812

364.845
Nalla

10840 364.017 363.832 2.524 367.368

10860 364.863 364.306 2.500 365.039


GOURI

367.539
L=350.000m
Nalla

R=9852.699m

DRAWING TITLE :
Radius:
Easting:

10880 364.667 364.829 2.417 365.332 367.750


DESIGNED
Extra Widening
HIP Chainage :

Design Speed (V)


Delta (Δ): 00 25

:
Nothing: 212357

10900 365.827 365.894 2.048 365.953 368.002


3800

10900
(We)

e=2.500
CURVE DETAIL-H
IP

10920 366.752 366.479 1.254 367.041 368.294


DRAWING NUMBER:- ***/MU-BO/HIG/PP/13

SANDEEP
0.411 Ls:
12.301 Ts:
e%
772641.148 Lc:

-
:
TO BHOKAR

CHECKED
100 Kmph
CD-33

-
-
-

10940 367.216 367.333 0.984 367.644 368.627


10+825.699

FROM KM-10+000 TO KM-11+000


27.861

e=2.500

368.203
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)

10960 367.359 367.707 0.797 369.001


NGK RAJU
House

10980 368.309 367.867 0.917 368.498 369.415


APPROVED

11000 369.002 369.240 0.447 369.423 369.870


11000
SCALE ON A2

Vertical 1:200

DATE
Horizontal 1:2000

REV : R-0
JUL- 2020
TO MUDKHED TO BHOKAR

CD-34
CURVE DETAIL-HIP
11+339.660
HIP Chainage : 69.695
772993.877 Lc:
Easting: 80
2 Ls:
Nothing: 2123942.08 -
00 Ts:
Delta (Δ): 26 37 17.6 7.0%
De
Radius: 150 e%: Pr sign
0.6 o
Extra Widening (We) Ex pos Cha
65 Kmph Ty istin ed S inag
Design Speed (V): Pr pe o g Sp pan e
op
os f Str an ( (m) 11
al uc m) 1x +44
Sam
ad
tur
2x 2x1. 0
i
Sh
ed
e
B 0. 5
Re OX 9
co
Sch
ool
ns CUL
tru VE
cti RT

11300
Hous
e
on

11
40
HP

0
Ga
te

1 12
HP

00
33
CD- 699

11
IP +825. .861

111
- H

50
AIL 10 : 27
DET Lc -
VE e :

0
U R 1 4 8 Ls: -
C inag 41 .

00
1 House

C ha 7 726 70.41 1 Ts: -


HIP ing: 2 3 5 . 3 0 % :
t 21 25 12 e
Eas ing: 0 0 0 0
-
ph HI C
h Km
Not a (Δ): 38 e)
100 Ea P C URV
(W No stin hain E D
110

Delt ius: in g
n
Rad a Wide ed (V)
: De thin g: age ETA

11
r e Ra lta g: 7 : IL
Ext ign Sp -H
00

Ex dius (Δ): 21 7338 IP

60
D e s
De tra : 0 23 4.
1 1 89 55 11 CD
sig Wi

0
n den 4 5 7.9 4 +7 -3
Sp in 20 1. 16 Lc 33. 5
ee g 0 64 : 0
d (W 0 5 Ls: 43 22
109

(V e) Ts .55
Nalla
):
e% : - 2
Na
lla

:
00

Nalla
10 - -
0K - HI CU
Ea P Ch RV

11
mp
h No stin ain E DE
De hin g: age TAI
t
Nalla

70
Ra lta ( g: 77 : L-H
108

IP

0
Ex dius Δ): 212 356
De tra W : 01 386 5.88 11 CD
00

sig id 35 5.6 2 +9 -3
n S en 2 4 L 17. 6
pe ing 200 1.36 3 L c: 1
ed (W 0 9 s: 55 98
la
Nal

(V e) Ts .47
): e% : - 6
: -

1
10 - -

1
0K

80
W mp
ate
rT
Sama
di
h Nalla

0
an
k
Nalla

Nalla

Nal
la

Nalla
Nal
la
Nal
la

De Na
lla

Pr sign

11
Nalla

Ex opos Ch

9
Ty istin ed aina

00
S
Pr pe o g Sp pan ge
op Nal

os f Str an ( (m) 11
la

al uc m)
tu 1x +87
re 5x 3x1 5
0 .5
Re OX .6
B
co
ns CUL
tru VE

12
cti RT
on

00
0
CLIENT : CONSULTANT : PROJECT : DRAWING TITLE : SCALE ON A2
PLAN & PROFILE (MUDKHED-BHOKAR ROAD) Horizontal 1:2000
FROM KM-10+000 TO KM-11+000 Vertical 1:200

DRAWING NUMBER:- ***/MU-BO/HIG/PP/13 DATE


DRAWN DESIGNED CHECKED APPROVED JUL- 2020
JULY 2020 R0 FIRST SUBMISSION
SABEESH GOURI SANDEEP
DATE No BY
NGK RAJU REV : R-0
DATE
JULY 2020
LEVEL DIFF.

R0
No
SUPERELEVATION

DESIGN CHAINAGE
@8M LHS FROM PCL

@8M RHS FROM PCL

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 368.0 (m)

ORIGINAL GROUND/ROAD LEVEL


11000 369.002 369.240 0.447 369.423 369.870

11020 369.337 370.199 0.288 370.077 370.365 Chainage=11028.571m


Level=370.590m

11040 370.187 370.454 0.332 370.562 370.894

L=384.542m

FIRST SUBMISSION
TO MUDKHED

11060 369.728 370.942 1.044 370.383 371.428

11080 369.829 370.939 1.527 370.433 371.961

G=2.665
L=111.429m
11100 371.696 372.258 0.241 372.253 372.494

11120 371.685 372.676 0.193 372.834 373.027

BY
e=2.000 e=2.000
Chainage=11140.000m
11140 372.799 373.279 0.246 373.314 373.560 Level=373.560m

11160 373.476 373.855 0.210 373.866 374.077

CLIENT :
11180 374.159 374.469 0.147 374.414 374.561

11200 374.841 375.041 -0.108 375.120 375.013

11220 375.314 375.893 -0.090 375.523 375.432

11240 375.701 376.126 0.101 375.717 375.819

11260 375.760 376.989 -0.331 376.504 376.173

L=80.000m
11280 376.597 377.427 -0.740 377.235 376.495

11300 377.914 378.153 -1.027 377.810 376.784

L=300.000m
R=-12300.808m
11320 377.702 378.579 -0.888 377.929 377.041

11340 377.734 378.860 -0.908 378.173 377.265

e=7.000
e=7.000

CONSULTANT :
L=69.695m
R=150.000m
11360 377.542 378.928 -0.590 378.046 377.456

11380 377.192 378.274 -0.171 377.787 377.616

11400 376.828 377.604 0.402 377.341 377.742

11420 376.264 376.741 0.803 377.033 377.836

L=80.000m
Chainage=11440.000m
11440 375.248 376.135 0.917 376.980 377.898 Level=377.898m

11460 376.215 376.769 1.011 376.933 377.943

11480 375.884 376.811 1.152 376.837 377.988


Proposed Span(m)
Design Chainage(m)

11500 375.531 376.303 1.826 376.208 378.034


BOX CULVERT

PROJECT :
11520 375.492 376.341 1.794 376.285 378.079
1x2x1.5
11+440

11540 375.538 376.089 1.891 376.233 378.124

11560 375.165 376.160 1.764 376.405 378.170

11580 375.549 376.427 1.756 376.459 378.215


G=0.227
L=286.441m
L=257.378m

11600 376.058 376.477 1.733 376.528 378.260

11620 375.960 376.089 1.782 376.523 378.306

11640 375.893 376.192 1.682 376.669 378.351

11660 376.149 376.381 1.460 376.936 378.396

11680 376.261 376.425 1.266 377.175 378.442

11700 376.634 377.271 1.125 377.362 378.487

11720 376.755 377.311 1.138 377.394 378.532 Chainage=11726.441m


Level=378.547m
R

11740 376.913 377.670 0.993 377.589 378.582


L=43.552m

11760 376.719 377.874 1.148 377.504 378.652

11780 376.857 377.492 1.123 377.620 378.743

11800 377.076 377.775 1.407 377.448 378.854

11820 376.872 377.494 1.861 377.125 378.986


SABEESH
DRAWN
L=134.661m

11840 376.071 377.321 2.336 376.803 379.139

11860 375.476 377.383 2.561 376.752


GOURI

379.313
L=250.000m
R=19238.480m

DRAWING TITLE :

11880 376.663 376.719 2.535 376.972 379.507


DESIGNED

11900 376.708 377.068 2.155 377.567 379.723


Proposed Span(m)
Design Chainage(m)

11920 377.062 377.354 1.992 377.967 379.959


DRAWING NUMBER:- ***/MU-BO/HIG/PP/13

SANDEEP
BOX CULVERT

L=55.476m
TO BHOKAR

R=-2000.000m

CHECKED

11940 377.454 377.590 2.082 378.134 380.216


FROM KM-10+000 TO KM-11+000
1x3x1.5
11+875

378.898
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)

11960 378.289 377.766 1.596 380.494


Chainage=11976.441m
NGK RAJU

Level=380.737m
11980 378.452 378.954 1.891 378.900 380.792
e=2.500

APPROVED

12000 378.598 379.329 1.716 379.381 381.097


L=93.562m

SCALE ON A2

Vertical 1:200

DATE
Horizontal 1:2000

REV : R-0
JUL- 2020
TO MUDKHED TO BHOKAR

CURV
HIP Chai E DETAIL-HIP
n
Easting: age : CD-37
12+051.
Nothing: 773699 924
.131
Delta (Δ 2123845.722 Lc: 26.856
): 00 46 Ls:
Nalla Radius: 09.767 -
2000
Nalla
Ts:
Nalla
Extra W -
id e%:
Design ening (We) -
Nalla
Speed (V -
):
100 Km
Nalla

ph

130
Nalla

Nalla

00
12000

age 12+667
Design Chain 1.5
an (m) 1x2x
House

Proposed Sp
12100

(m) 1x1.2
Existing Span

129
T
cture BOX CULVER A
Type of Stru Reconstructi
on E DET
CURV ge :
12200
Bore

al

00
Propos h a in a
HIP C :
Samadi
g
Eastin g:
Nalla

12300
Nothin Δ):
a (
Delt :

128
s
Radiu idenin

12400
Nalla
Nalla

W
Extra Speed

00
ig n
Des

12500

12700
WELL

Nalla

12600
WELL
Nalla

CURVE DETAIL-HIP CD-38


HIP Chainage : 12+695.744
Easting: 774335.334 Lc: 337.886
Ls: 35
Nothing: 2123747.330 -
Ts:
Delta (Δ): 32 15 56.721
600 e%: 4.7%
Radius:
-
Extra Widening (We)
80 Kmph
Design Speed (V):

CLIENT : CONSULTANT : PROJECT : DRAWING TITLE : SCALE ON A2


PLAN & PROFILE (MUDKHED-BHOKAR ROAD) Horizontal 1:2000
FROM KM-12+000 TO KM-13+000 Vertical 1:200

DRAWING NUMBER:- ***/MU-BO/HIG/PP/14 DATE


DRAWN DESIGNED CHECKED APPROVED JUL- 2020
JULY 2020 R0 FIRST SUBMISSION
SABEESH GOURI SANDEEP
DATE No BY
NGK RAJU REV : R-0
DATE
JULY 2020
LEVEL DIFF.

R0
No
SUPERELEVATION

DESIGN CHAINAGE
@8M LHS FROM PCL

@8M RHS FROM PCL

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 378.0 (m)

ORIGINAL GROUND/ROAD LEVEL


12000 378.598 379.329 1.716 379.381 381.097

L=93.562m
12020 380.260 379.662 1.701 379.701 381.402

e=2.500
12040 378.626 379.990 1.450 380.258 381.707

L
R

FIRST SUBMISSION
TO MUDKHED

12060 379.830 380.229 1.361 380.651 382.013

12080 380.436 380.566 1.516 380.801 382.318

12100 380.751 380.505 1.472 381.152 382.623

12120 380.560 381.309 1.453 381.475 382.928

BY
12140 380.881 380.973 1.583 381.651 383.233

12160 381.059 381.510 1.448 382.091 383.539

CLIENT :
12180 381.383 381.797 1.407 382.436 383.844

G=1.526
L=403.335m
12200 381.861 381.995 1.440 382.709 384.149

12220 381.696 381.955 1.560 382.894 384.454

12240 382.294 382.873 1.570 383.190 384.759

12260 383.177 382.831 1.402 383.662 385.065

12280 382.889 383.164 1.560 383.810 385.370

L=421.838m
12300 384.262 383.857 1.282 384.393 385.675

12320 384.772 384.240 1.157 384.823 385.980

12340 385.352 384.540 1.169 385.117 386.285

CONSULTANT :
12360 385.520 384.800 1.109 385.482 386.591

Chainage=12379.776m
12380 385.993 385.247 1.014 385.881 386.896 Level=386.892m

12400 386.222 385.919 0.803 386.413 387.216

12420 386.607 386.348 0.813 386.755 387.567

12440 386.081 386.630 0.884 387.063 387.948

12460 386.652 386.735 0.881 387.478 388.358

12480 386.190 387.621 0.711 388.088 388.799

12500 387.896 387.796 0.627 388.642 389.270

PROJECT :
L=250.000m
R=13324.125m
12520 387.055 388.689 0.531 389.240 389.770

12540 388.492 389.929 0.470 389.830 390.301

12560 389.938 391.016 0.401 390.460 390.862

12580 389.543 391.330 0.542 390.911 391.452

12600 390.302 391.040 0.891 391.183 392.073

12620 390.725 391.492 1.394 391.329 392.724


Chainage=12629.776m
Level=393.053m
12640 390.647 392.043 2.126 391.275 393.401

12660 392.424 392.331 2.206 391.876 394.081

12680 392.750 392.501 2.216 392.546 394.762


Proposed Span(m)
Design Chainage(m)
BOX CULVERT

e=4.700
e=4.700

12700 393.630 392.802 1.765 393.677 395.442


L=337.886m
R=-600.000m
1x2x1.5
12+667

12720 394.397 393.927 1.442 394.680 396.123

12740 395.543 394.169 1.276 395.527 396.803


G=3.402
L=211.696m

12760 397.037 394.951 1.278 396.206 397.484

12780 397.643 395.747 1.480 396.684 398.164

12800 398.505 396.619 0.993 397.851 398.844

12820 398.921 397.301 0.495 399.029 399.525


SABEESH
DRAWN

Chainage=12841.472m
12840 399.878 398.190 0.622 399.583 400.205 Level=400.255m

12860 400.025 399.504 0.902 399.997 400.900


GOURI
DRAWING TITLE :
L

12880 400.921 400.162 1.041 400.585 401.625


DESIGNED

12900 401.208 400.487 1.136 401.246 402.383

12920 402.017 401.368 1.316 401.857 403.172


DRAWING NUMBER:- ***/MU-BO/HIG/PP/13

SANDEEP
e=2.500
TO BHOKAR

CHECKED

12940 401.959 401.954 1.416 402.577 403.993


L=68.941m

FROM KM-10+000 TO KM-11+000


L=200.000m
R=12587.778m

e=2.500

PLAN & PROFILE (MUDKHED-BHOKAR ROAD)

12960 403.338 403.294 1.109 403.737 404.846


NGK RAJU

12980 404.366 403.807 0.873 404.858 405.731


APPROVED

13000 405.890 404.398 0.818 405.829 406.647


L=75.000m

SCALE ON A2

Vertical 1:200

DATE
Horizontal 1:2000

REV : R-0
JUL- 2020
TO MUDKHED TO BHOKAR

Design Chainage 13+970


Proposed Span (m) 1x3x1.5
Existing Span (m) 3x0.75
-42
CD .343 2 Type of Structure BOX CULVERT
2 0
- H IP 3+91 47.6 Proposal Reconstruction
IL 1 c: 60
E TA L
: -
ED 79 Ls
RV e : 1.3 7 : .0%
CU inag 7545 8.06 6 Ts : 7
a 7 392 .16 e% 6
Nalla

C h 3 .
HIP ting: 212 38 1 0 ph
: 3 200 Km
Eas thing ): 1 ) 65
No lta (Δ ( We
i n g :
De ius: iden (V)

14000
d
Ra ra W peed
Ext sign S
-41 4

139
De
CD 7.75 085
P +65 296.

la
Nal
I
-H 13 c: -

00
AIL L -
ET 9 s:
V ED : 7 .73 34 L s: -
U R ag e 2 2 .0 8 T :
C ain 77 5 00 7 e% -
C h 2 38 19.8 ph
130

CD-40 P : 1
HI sting : 2 21 12 00 Km

13
IP
ETAIL-H 429 65

13
CURVE D 13+306. Ea thing ): 8 e)
10 : : 87.142 13+5
55
No lta (Δ (W
00

e
in ag ing ):

80
Lc
HIP Cha .3 37 ge .5 De dius: iden d (V
78 45 haina m) 1x2x1
0
7748 Ls: C

la
Easting: 2123747.221 n

Nal
Desig d Span ( Ra tra W Spee

0
- 5
hi ng : 42 Ts: s e 2x0.7 LVERT
N ot 09 .1
Prop o n (m ) CU Ex sign
): 33 17 e%: 7.0% g Spa BOX De
9 Delta (Δ 150 tin re structi
on

Nalla
CD-3 3 0.6 Ex is uctu
of Str Recon
129

IP 9 Radius: (We) Type


T AIL-H 13+054.0 .873 idening 50 Kmph
D E Extra W sa l
E
CURV ge : 29 d (V): Propo

137
Lc: 75 Design Sp ee
0

a 3 9
hain 72.0 :
7746 9.688 Ls

Nal
HIP C :
0

la
-

1
g 8 s:
Eastin g: 21238 04.236 T : 7.0%
Nalla

00
3
Nalla

20
1 e%
Nothin Δ): 19 0 0
Nalla
Temple

( 9 0.9
Delta : ph 0
s We) 50 Km
Radiu idening ( :

1360
Nalla SHET TALE
Nalla

a W ( V )
Extr S p eed
n
Desig

0
13500
SHET TALE

601
13+

1330
SHET TALE

ge 2
1x1. 5

13400
aina (m)
n Ch n 7
1x0. ULVER
T
Desig sed Spa m) C
o
Prop g Span re
( PIPE uction

0
in tu n s t r
Exist of Struc Reco
e
Typ sal
o
Prop

CLIENT : CONSULTANT : PROJECT : DRAWING TITLE : SCALE ON A2


PLAN & PROFILE (MUDKHED-BHOKAR ROAD) Horizontal 1:2000
FROM KM-13+000 TO KM-14+000 Vertical 1:200

DRAWING NUMBER:- ***/MU-BO/HIG/PP/15 DATE


DRAWN DESIGNED CHECKED APPROVED JUL- 2020
JULY 2020 R0 FIRST SUBMISSION
SABEESH GOURI SANDEEP
DATE No BY
NGK RAJU REV : R-0
DATE
JULY 2020
LEVEL DIFF.

R0
No
SUPERELEVATION

DESIGN CHAINAGE
@8M LHS FROM PCL

@8M RHS FROM PCL

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 404.0 (m)

ORIGINAL GROUND/ROAD LEVEL


13000 405.890 404.398 0.818 405.829 406.647

L=75.000m
13020 406.871 406.779 0.457 407.139 407.596

Chainage=13041.472m
13040 408.635 408.954 0.177 408.399 408.576 Level=408.649m

e=7.000
e=7.000
L
R

FIRST SUBMISSION
TO MUDKHED

e=7.000
e=7.000
13060 410.455 411.307 -1.167 410.740 409.574

13080 414.405 413.709 -2.678 413.250 410.572

13100 416.669 416.851 -4.110 415.680 411.570

L=75.000m
13120 417.669 421.580 -5.103 417.672 412.568

BY
13140 419.179 423.403 -5.727 419.293 413.567

G=4.991
L=185.280m
13160 421.644 424.942 -6.371 420.936 414.565

CLIENT :
e=2.500
13180 421.704 424.030 -7.044 422.607 415.563

L=72.699m
13200 422.664 425.848 -7.370 423.932 416.561

e=2.500
13220 426.721 427.499 -7.911 425.470 417.560 Chainage=13226.752m
Level=417.897m

13240 427.221 432.457 -10.194 428.719 418.525

L=45.000m
13260 433.096 432.893 -14.186 433.538 419.352

13280 435.437 433.539 -15.145 435.176 420.030

13300 437.238 433.536 -15.786 436.348 420.561

e=7.000
e=7.000
L=87.142m
R=-150.000m
13320 438.020 433.066 -14.015 434.958 420.944

L=200.000m
R=-2705.710m
13340 434.044 432.077 -12.491 433.669 421.179

CONSULTANT :
13360 429.103 430.585 -9.291 430.558 421.266

13380 427.145 427.844 -5.763 426.968 421.206

L=45.000m
13400 425.665 425.289 -4.390 425.387 420.997

13420 424.374 423.141 -3.354 423.994 420.641 Chainage=13426.752m


Level=420.487m

13440 423.097 421.776 -2.690 422.860 420.169

13460 421.579 421.181 -2.083 421.773 419.689

L=114.266m
13480 420.847 420.498 -1.456 420.665 419.209

13500 419.453 418.686 -0.398 419.126 418.729

PROJECT :
13520 418.114 416.847 0.389 417.859 418.249

13540 416.493 415.934 1.150 416.619 417.769


Proposed Span(m)
Design Chainage(m)

13560 415.240 416.036 0.716 416.573 417.288


BOX CULVERT

1x2x1.5
13+555

13580 414.945 415.799 0.869 415.939 416.808

13600 414.859 415.052 0.716 415.613 416.328

13620 413.780 416.066 0.581 415.267 415.848


e=2.500
Proposed Span(m)

13640 414.177 416.326 -0.041 415.408 415.368


Design Chainage(m)
PIPE CULVERT

G=-2.401

13660 415.060 415.806 -0.335 415.222 414.888


L=449.509m
1x1.2
13+601

L=296.085m

e=2.500
R=-800.000m

13680 416.041 415.106 -0.757 415.165 414.408

13700 414.861 414.907 -0.599 414.526 413.928

13720 412.293 414.290 -0.584 414.031 413.447

13740 413.513 414.782 -0.865 413.832 412.967

13760 413.039 413.696 -1.022 413.510 412.487

13780 412.729 413.167 -0.918 412.925 412.007

13800 412.081 413.201 -0.734 412.260 411.527


L

13820 411.320 413.430 -1.086 412.132 411.047


SABEESH
DRAWN

13840 410.756 413.223 -1.331 411.898 410.567

13860 410.350 412.955 -1.314 411.400 410.087


GOURI
DRAWING TITLE :
L=60.000m

Chainage=13876.261m
Level=409.696m
13880 410.077 411.828 -0.775 410.382 409.607
DESIGNED

13900 409.079 409.806 -0.159 409.301 409.141


e=7.000
e=7.000

13920 407.978 408.268 0.794 407.902 408.696


DRAWING NUMBER:- ***/MU-BO/HIG/PP/15

SANDEEP
L=47.602m
R=200.000m
TO BHOKAR

CHECKED

13940 406.700 406.979 1.225 407.046 408.272


FROM KM-13+000 TO KM-14+000
Proposed Span(m)
Design Chainage(m)
BOX CULVERT

PLAN & PROFILE (MUDKHED-BHOKAR ROAD)

13960 405.809 405.757 1.718 406.151 407.869


NGK RAJU
1x3x1.5
13+970

L=60.000m

13980 405.417 404.766 1.751 405.735 407.486


APPROVED
L=200.000m
R=19187.351m

14000 405.203 404.369 1.679 405.445 407.125


SCALE ON A2

Vertical 1:200

DATE
Horizontal 1:2000

REV : R-0
JUL- 2020
DATE
JULY 2020
LEVEL DIFF.

R0
No
SUPERELEVATION

DESIGN CHAINAGE
@8M LHS FROM PCL

@8M RHS FROM PCL

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
13900

HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 392.0 (m)
Proposal
Type of St

ORIGINAL GROUND/ROAD LEVEL


Existing Sp
Design Chain

14000 405.203 404.369 1.679 405.445 407.125


ag

Nal
la
ructure
Proposed Sp e
an (m) 3x
an (m) 1x

14020 404.750 404.270 1.450 405.333 406.784


0.75
3x1.5

Reconstruct
13+970

e=2.500
BOX CULV

14040 404.770 403.696 1.238 405.227 406.464


ion
ERT

FIRST SUBMISSION
Nalla
TO MUDKHED

14060 404.970 404.137 0.894 405.271 406.165


14000
Chainage=14076.261m
Level=405.937m
14080 405.365 404.294 0.557 405.329 405.887

e=2.500
14100 404.758 404.277 0.552 405.062 405.615

14120 404.442 403.839 0.585 404.758 405.343

BY
L=238.483m
14140 404.065 403.790 0.448 404.623 405.072
Nalla

14100
14160 403.421 403.363 0.442 404.357 404.800

CLIENT :
14180 402.933 403.093 0.509 404.020 404.528

14200 402.546 402.913 0.944 403.313 404.257

14220 401.933 402.710 0.871 403.114 403.985

14240 401.792 402.214 0.699 403.015 403.713


14200
14260 401.722 401.273 1.273 402.168 403.442

14280 400.997 401.187 1.739 401.432 403.170

14300 401.159 401.235 1.759 401.140 402.898

14320 400.888 400.817 1.771 400.855 402.627

14340 401.118 400.527 1.302 401.054 402.355

CONSULTANT :
14300
14360 400.410 400.321 1.295 400.788 402.083

14380 400.248 400.161 1.205 400.606 401.812

14400 400.118 399.926 1.113 400.428 401.540

G=-1.358
L=641.776m
14420 399.711 400.056 1.098 400.170 401.268

14440 399.567 399.111 1.094 399.903 400.997

14400
14460 399.044 398.605 1.111 399.614 400.725

14480 398.310 398.533 1.276 399.177 400.454


Bore

14500 398.304 398.201 1.526 398.655 400.182

PROJECT :
14520 397.755 397.733 1.534 398.376 399.910

14540 396.985 397.799 2.318 397.320 399.639


H

D
IP

el

14500
14560 397.191 397.332 2.557 396.810 399.367
C

ta
ha

Nothing

Radius:

:

Extra W
):

Design Sp
inag
CURVE D

14580 397.004 396.609 2.390 396.705 399.095


e :

23

idening
35

eed (V):
(W
776149.2
ETAIL-H

1800

14600 396.771 396.553 2.260 396.563 398.824


e)
IP

07
Easting: 2123939.824
Lc

L=741.152m
Ls:

14620 396.528 396.412 2.130 396.422 398.552


:

R=-1800.000m
e%
29.749 Ts :
-
CD-43

: 741.
-
416

-
-

80 Kmph

14640 396.288 396.271 2.001 396.280 398.280


14+610. 152

14660 396.145 396.142 1.871 396.137 398.009


14600

Nal
la
14680 396.002 396.038 1.743 395.995 397.737

14700 395.859 395.935 1.588 395.878 397.465


Nal
la

Chainage=14718.037m
Level=397.220m
Nal

14720 395.776
la

395.718 395.834 1.417 397.194

14740 395.618 395.673 1.267 395.676 396.944

14760 395.519 395.390 1.216 395.515 396.730


14700

14780 395.351 395.103 1.327 395.227 396.553


Nalla

14800 395.058 394.813 1.477 394.936 396.412

14820 394.762 394.483 1.667 394.641 396.307


SABEESH
DRAWN

14840 394.388 393.848 2.134 394.105 396.239


D

14860 393.853 393.798 2.938 393.269


GOURI

396.207
Nalla
e

Proposed Span(m)
s

14800
Design Chainage(m)

DRAWING TITLE :
ig

ro
Existi
Type
p
n

BOX CULVERT
g

14880 393.992 394.598 2.072 394.139 396.211


sal
sed S

DESIGNED
of Str
pa

1x6x2.5
14+869
inage

Propo Span (m)

14900 393.965 394.585 1.830 394.423 396.252


R
n Cha n (m) 1x

Na
a ll
14+8

14920 394.013 394.579 1.109 395.220 396.329


DRAWING NUMBER:- ***/MU-BO/HIG/PP/16

SANDEEP
69

5
6x2.5

L=400.000m
R=11013.386m

Nalla
TO BHOKAR

ucture econstructi

CHECKED
OX CU on

14940 394.528 395.131 1.063 395.380 396.442


2x0.7 LVERT

FROM KM-14+000 TO KM-15+000


Na
lla

395.397
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)

14960 394.428 395.050 1.195 396.592


1490
0
NGK RAJU

14980 393.492 395.084 1.761 395.016 396.778


APPROVED
e=2.500

15000 394.297 395.050 2.439 394.561 397.000


Shed
o

Prop
in

Nalla
o
o
n Ch

Type sal

SCALE ON A2

Vertical 1:200

DATE
Horizontal 1:2000
Prop g Span

REV : R-0
JUL- 2020
Exist f Struct
ge
(
(m
Desig sed Span )
ure
aina m)
DATE
JULY 2020
LEVEL DIFF.

R0
No
SUPERELEVATION
BOX CULVERT

DESIGN CHAINAGE
14900

@8M LHS FROM PCL

@8M RHS FROM PCL

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 390.0 (m)

ORIGINAL GROUND/ROAD LEVEL


Nal
la

Nalla
15000 394.297 395.050 2.439 394.561 397.000

Shed
Ty
15020 395.163 394.559 2.309 394.949 397.259

Samadi
pe of
Proposal

e=2.500
Str

15040 396.456 395.206 1.685 395.869 397.553


Existing Span
uct
Proposed Span
Design Chainag
e

Nalla
ure

FIRST SUBMISSION
TO MUDKHED

Proposed Span(m)
15060 396.343 395.611 1.257 396.628 397.885

Design Chainage(m)
15000

BOX CULVERT
(m) 2x0.75
15+005
(m) 1x2x1.5

15080 396.284 396.581 1.068 397.184 398.252

1x2x1.5
15+005
Reconstruction
BOX CULVERT

15100 397.033 396.853 1.036 397.619 398.656


Chainage=15118.037m
Wel
l

15120 397.624 397.835 0.780 398.316 399.096 Level=399.051m

BY
L
G
Nalla

15140 397.990 398.719 0.692 398.858 399.551 Chainage=15146.602m


Level=399.701m

L=335.829m
15160 398.515 399.191 0.646 399.345 399.991
15100

CLIENT :
15180 399.754 399.821 0.521 399.847 400.368

15200 400.289 400.199 -0.178 400.857 400.680

15220 400.730 400.892 -0.879 401.804 400.925


Hous
e

15240 401.283 401.843 -1.316 402.420 401.104


Nalla

15260 401.983 402.298 -1.755 402.973 401.218


15200

15280 402.020 403.540 -2.011 403.276 401.265

15300 402.164 403.608 -2.014 403.260 401.247

15320 401.674 403.357 -1.917 403.079 401.162

L=340.000m
R=-6058.739m
15340 401.587 403.601 -1.693 402.704 401.011

CONSULTANT :
15360 400.657 402.445 -1.366 402.161 400.795
15300

15380 401.001 402.021 -1.250 401.762 400.512

15400 400.471 401.314 -0.928 401.091 400.163

e=3.600
e=3.600
15420 399.668 400.530 -0.572 400.321 399.748

L=148.745m
R=800.000m
15440 398.851 399.518 -0.241 399.508 399.268
Radius:
Easting:

Extra Wid
Delta (Δ):

en

15400
15460 397.526 397.903 0.338 398.382 398.721
CURVE
ge :

eed (V):
800
Design Sp ing (We)

15480 396.941 396.805 0.519 397.590 398.108 Chainage=15486.602m


2124270.
.9

Level=397.891m
62
HIP Chaina DETAIL-HIP

Temp
le

15500 396.054 396.056 0.615 396.829 397.444


55 Ts:
10 39 10 4 Ls:

-
Nothing: 776895.482 Lc:

PROJECT :
80 Kmph
-
CD-44
15+416.08

30
e%: 3.6%
3

15520 395.171 394.668 1.028 395.749 396.776


148.745

G=-3.338
L=79.433m
15540 393.894 394.694 1.220 394.889 396.109
15500
15560 393.063 393.951 1.260 394.182 395.441 Chainage=15566.035m
Level=395.240m

15580 392.975 393.308 1.204 393.603 394.808

15600 392.477 393.127 1.133 393.177 394.309

15620 391.986 392.764 1.300 392.650 393.951


Proposed Span(m)
Design Chainage(m)

L=120.000m
R=2841.170m

15640 391.184 392.263 1.449 392.285 393.734


BOX CULVERT

e=2.500
L=240.068m

15600
1x5x2

15660 391.748 391.874 0.823 392.835 393.657


15+643

15680 391.846 392.491 0.363 393.359 393.721 Chainage=15686.035m


Level=393.768m
e=2.500
Wel
l

Nalla

15700 391.979 391.134 0.343 393.550 393.892 Nalla

Nalla
WE
LL

Nalla

Nalla

15720 392.022 392.824 0.222 393.848 394.069


Type of
Proposal
Existing
Proposed

15740 393.006 393.597 0.262 393.984 394.246


Design Ch

15700
Span (m
Structure
ainage

)
Span (m

15760 392.264 393.823 0.230 394.193 394.423


L
Reconstr

15780 392.775 394.030 0.378 394.223 394.600


) 1x5x2
4x0.75
15+643

BOX CULV
uction
ERT

15800 392.727 394.009 0.486 394.292 394.778

15820 393.455 393.928 0.583 394.371 394.955


SABEESH
DRAWN

15840 394.229 394.013 0.796 394.335 395.132


15800
15860 394.180 394.200 1.268 394.041
GOURI

395.309
G=0.886
L=340.512m

DRAWING TITLE :

15880 394.030 394.399 1.283 394.203 395.486


DESIGNED

15900 394.293 394.700 1.217 394.447 395.663


Bore
HIP

De

e=3.600
e=3.600

15920 394.540 394.843 1.149 394.691 395.840


lt

De
C

DRAWING NUMBER:- ***/MU-BO/HIG/PP/17

SANDEEP
a
h

si
Nothin
Easting

L=250.240m
a

g
:
g

R=-800.000m
n

:
in
TO BHOKAR

CHECKED
):

S
id
p

15940 394.946
2

394.803 395.095 1.072 396.017


age

FROM KM-15+000 TO KM-16+000


CURVE :
DETAIL

15900
17 55 1

Extra W eed (V):


800
.8

395.263
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)

15960 395.070 395.374 0.932 396.194


.0
8

Radius: ening (We)


-HIP

9.5
0

NGK RAJU
777385 87 Ls:

15980 395.390 395.564 0.903 395.469 396.372


124372 83 Ts:

APPROVED
-
CD-45

Lc: 25

e%: 3

65 Kmp
.458

-
30

16000 395.573 395.862 0.830 395.718 396.549


15+916 0.24

.6%

SCALE ON A2

Vertical 1:200

DATE
Horizontal 1:2000

REV : R-0
JUL- 2020
TO MUDKHED TO BHOKAR

46
CD- 47
HIP 6+260.4 .728
E T AIL- 1 73
VE D Lc: 55
CUR age : 95
h a in 7 688.2 74 Ls: -
C 7 7 . 4 s :
H I P 5 3 8 T .0%
ing: 124 .410 e%: 7
East ing: 2 3 47 39
3 0.6 h

Nal
Noth (Δ): 125

la
mp
a
Delt s: g (W
e) 50 K Bore

d iu n in
Ra W ide d (V):
a
Extr n Spee
ig
Nal

95 Des
+0
la

16 .2

L
NA
CA
x 1 RT CURVE D
ge ) 1 0.75 LVE ETAIL-H
ina 1x E CU ion HIP Chai IP
C ha an (m P t na
Easting: ge :
CD-47
sig
n
dS
p
(m
) PI struc 777895.5 16+487.034 CU
HIP C RVE DETA

AL
N
De pose Span ure econ Nothing:

CA

163
19 Lc: h IL-HIP
Pro ting truc
Nal
lat R Delta (Δ 21 24 443.497 122.581 Eastin ainage :

162
): 23 24 Ls: g CD
s
Exi e of
S Radius: 40.461 - Nothin : 77798 16+5 -48 CURVE DETAIL-HIP CD-50 1
-5 54 3
Samadi

Ts: g 21244 .800 Lc 75.836


5

00
p l :

la
Ty posa Delta CD 8.0 .62

Nal
Extra Wid 300 - HIP Chainage : 16+751.089
3 : 26
Nal

-45 e%: (
Radiu Δ): 05 07 6.698 Ls 8
la

00
o en 3
CD .458 4 P r Design Sp ing (We) -
s :
.813 Easting: 778159.977 Lc: 4.786 P +9 11 50
15.58 HI 16 Lc:
House

6
IP 5+91 250.2
eed (V): 0.6 Extra : 300 3 Ts - Nothing: 2124436.478 Ls: 35 L- -
- H 40 Kmph Wide : I s : %
IL 1 c: 30
Gate
Desig n
n Spe ing (We) e%: - Delta (Δ): 00 47 00.638 Ts: - TA 9 L .8
D ETA L
- ed (V - DE : .41 34 Ts: : 4
RV
E : .88
0 Ls: ): 0.6 Radius: 350 e%: 5.4% V E e 346 .3 1
g 8 47 85 % 6
e 0. ph

16
Gat

CU inage 7385 .087 Ts: % Nal e


R
3.6 CU aina 77 244 01.
la

40 Km Extra Widening (We) -


Km

16
a 7
7 437 .58 e%2 3 : ph
Ch Ch
Scho

1 3 50

40
WELL ol
Design Speed (V): 65 Kmph
HIP ting: 212 55 1
9 -
ph I P ing: : 2 29 3 230 e)

la
10

Nal
Nalla

H st
Eas hing: : 17 800 ) Km g W

0
t 65 Ea thin (Δ): (
g ):
No ta (Δ) We No lta s: enin (V

0
l g (
De ius: enin (V): Hou
se Lin
e

De diu Wid eed


d
Rad ra Wi peed Ra tra n Sp
Nal
la
Hou
Shed

t
se Lin

S Ex sig
e

x
E ign
De
s De

1650
Ota Nalla

Nalla
Nalla
160

Ota
Temple

Ota
00

Nal Temple

16600
la

HP

16800
16700

16900
Nalla
1590

Samadi
Nal
la

TO RITHA CURVE DETA


---- >
HIP Chainag IL-HIP CD-49
0

e: 16+649.508
Bore
Easting:
778058.494
Nothing: 21 Lc: 86.3

Nalla
24 Design Chainage
Delta (Δ): 16 424.628 Ls: -
16+821
House 28 55.596 Proposed Span (m)
Radius: Ts: - 3x4
Existing Span (m)
Extra Widenin 300 e%: - 3x4.5
g (We) Type of Structure
Design Spee 0.6 MINOR BRIDGE
d (V): Proposal
40 Kmph Reconstruction

Nalla
CLIENT : CONSULTANT : PROJECT : DRAWING TITLE : SCALE ON A2
PLAN & PROFILE (MUDKHED-BHOKAR ROAD) Horizontal 1:2000
FROM KM-16+000 TO KM-17+000 Vertical 1:200

DRAWING NUMBER:- ***/MU-BO/HIG/PP/18 DATE


DRAWN DESIGNED CHECKED APPROVED JUL- 2020
JULY 2020 R0 FIRST SUBMISSION
SABEESH GOURI SANDEEP
DATE No BY
NGK RAJU REV : R-0
DATE
JULY 2020
LEVEL DIFF.

R0
No
SUPERELEVATION

DESIGN CHAINAGE
@8M LHS FROM PCL

@8M RHS FROM PCL

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 384.0 (m)

ORIGINAL GROUND/ROAD LEVEL


16000 395.573 395.862 0.830 395.718 396.549

16020 395.719 396.043 0.828 395.897 396.726 Chainage=16026.547m


Level=396.784m

16040 395.672 396.030 1.035 395.851 396.887

FIRST SUBMISSION
L
TO MUDKHED

16060 395.655 396.000 1.150 395.832 396.981

16080 395.461 395.847 1.351 395.654 397.005

Proposed Span(m)

e=2.500
Design Chainage(m)
16100 395.333 395.385 1.680 395.277 396.958

PIPE CULVERT

L=150.000m
R=-5662.869m
1x1.2
16+095
16120 395.155 395.060 1.887 394.954 396.840

BY
L=96.928m
16140 395.128 395.013 1.532 395.121 396.652

e=2.500
16160 394.490 394.776 1.089 395.305 396.393

CLIENT :
Chainage=16176.547m
Level=396.126m
16180 394.156 394.781 0.886 395.179 396.065

16200 393.735 394.500 0.682 395.030 395.712

L=55.000m
16220 393.888 394.913 0.562 394.797 395.359

16240 393.778 394.745 0.947 394.060 395.007

16260 393.507 393.225 0.815 393.840 394.654

e=7.000
e=7.000
L=73.728m
R=125.000m
16280 393.086 393.251 1.274 393.027 394.301

16300 392.467 393.023 0.937 393.012 393.949

16320 392.674 392.505 0.638 392.958 393.596

L=55.000m
16340 391.719 392.416 0.667 392.576 393.243

G=-1.763

CONSULTANT :
L=324.541m
16360 391.762 391.936 0.803 392.088 392.891

16380 391.675 390.853 0.771 391.767 392.538

L=73.673m
16400 391.304 391.085 0.722 391.464 392.185

16420 390.992 390.866 0.607 391.226 391.833

16440 390.668 390.842 0.662 390.818 391.480

16460 390.320 390.318 0.516 390.612 391.128

16480 390.197 390.079 0.412 390.362 390.775

Chainage=16501.088m

L=122.581m
16500 389.919 389.285 0.666 389.757 390.422

R=-300.000m
Level=390.403m

PROJECT :
16520 389.714 389.479 0.639 389.443 390.082

e=2.000
16540 389.737 389.096 0.614 389.154 389.768
L

e=2.000
16560 389.749 388.918 -0.221 389.702 389.481
L
R

16580 389.517 388.674 -0.336 389.557 389.221


L

16600 388.912 388.670 -0.274 389.262 388.988

16620 388.820 388.116 -0.301 389.082 388.782

16640 388.771 387.964 -0.144 388.747 388.603

16660 388.488
L=86.300m

388.696 387.765 -0.037 388.451


R=-300.000m

16680 388.597 388.749 -0.305 388.631 388.325

16700 388.297 388.449 -0.566 388.793 388.227


L

16720 387.921 388.159 -0.483 388.639 388.155


L

16740 388.190 388.038 -0.635 388.746 388.111


L
R

e=5.400
e=5.400

16760 388.126 388.025 -0.443 388.536 388.093


L

16780 387.620 387.407 -0.033 388.135 388.102

16800 387.250 387.338 0.433 387.705 388.138


Proposed Span(m)

L=38.910m
Design Chainage(m)

16820 385.577 386.795 0.763 387.439 388.201


SABEESH
MINOR BRIDGE

DRAWN
L=650.000m
3x4

16840 386.576 386.794 0.844 387.448 388.291


R=14863.289m
16+821

16860 387.042 386.640 1.368 387.040


GOURI

388.408
L=50.000m

DRAWING TITLE :

16880 387.201 387.155 1.080 387.472 388.552


DESIGNED

16900 386.821 387.514 1.033 387.690 388.722

16920 387.348 387.467 1.032 387.887 388.920


DRAWING NUMBER:- ***/MU-BO/HIG/PP/18

SANDEEP
TO BHOKAR

CHECKED

16940 387.834 387.664 1.337 387.808 389.144


e=4.800
e=4.800

FROM KM-16+000 TO KM-17+000


L=118.623m
R=-230.000m

388.244
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)

16960 388.073 388.367 1.152 389.396


NGK RAJU

16980 388.545 388.047 0.935 388.740 389.674


APPROVED

17000 388.969 388.719 0.414 389.565 389.979


SCALE ON A2

Vertical 1:200

DATE
Horizontal 1:2000

REV : R-0
JUL- 2020
L=50.000m
DATE
JULY 2020
LEVEL DIFF.

R0
No
SUPERELEVATION

DESIGN CHAINAGE
Na

0
lla

@8M LHS FROM PCL

@8M RHS FROM PCL


90

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
16

HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 388.0 (m)
Radius:
Easting:

ORIGINAL GROUND/ROAD LEVEL


HIP Chainage :

17000 388.969 388.719 0.414 389.565 389.979


Design Speed (V):
230
Extra Widening (We)
CURVE DETAIL-HIP

17020 389.521 388.987 0.470 389.841 390.311


Nalla

O
Temta
ple
Nothing: 2124447.334 Ls:
Delta (Δ): 29 33 01.851 Ts:

L=50.000m
0.6

17040 389.719 389.787 0.480 390.191 390.671


50 Kmph
CD-51

-
50
16+938.054

e%: 4.8%

FIRST SUBMISSION
778346.419 Lc: 118.623
TO MUDKHED

17060 390.133 389.870 0.430 390.627

L
391.056
17000
17080 390.268 390.141 0.575 390.894 391.469

17100 390.706 390.027 0.702 391.207 391.909

17120 390.842 390.252 0.890 391.486 392.376


W
k

BY
Tan ater

L=70.687m

e=2.500
R=1200.000m
17140 391.433 390.845 1.143 391.726 392.869
Chainage=17151.088m
Level=393.155m
Radius:
Easting:

17160 391.610 390.929 1.400 391.988 393.387

CLIENT :
HIP Chainage :

17100

e=2.500
Design Speed (V):

17180 391.803 391.591 1.489 392.420 393.909


1200
Extra Widening (We)
CURVE DETAIL-HIP

17200 392.315 391.841 1.466 392.965 394.431


Nothing: 2124562.461 Ls:
Delta (Δ): 03 22 30.191 Ts:

-
e%:

80 Kmph
CD-52

-
-
-

17220 392.635 392.303 1.638 393.315 394.953

L=119.746m
17+115.166
778484.257 Lc: 70.687

17240 392.989 393.183 1.529 393.946 395.475

17260 393.825 393.660 1.525 394.473 395.997


17200

G=2.610
17280 394.194 394.304 1.504 395.015 396.519

L=243.012m
17300 394.779 394.918 1.569 395.473 397.041

L=45.000m
17320 395.487 395.096 1.514 396.050 397.563

L
R

e=5.000
e=5.000
Proposed Span(m)
Design Chainage(m)

17340 396.603 396.187 1.406 396.679 398.085


PIPE CULVERT

CONSULTANT :
1x1.2

17360 397.274 396.651 1.136 397.472 398.607


17+348

L=45.000m
17300
17380 397.345 397.360 0.950 398.179 399.129
De
HIP
Proposal

Chainage=17394.100m
lta
Ch

Level=399.497m
Easting:

Radius:
Nothing:
(Δ)

17400 398.231 397.763 0.837 398.812


ain

399.650
:
Design Chainage

ag
Type of Structure
Existing Span (m)

21
01
Proposed Span (m)

Design Speed
:

Extra Widenin
24

17420 399.248 398.159 0.674 399.476 400.149


69

(V):
CURVE DETAIL-

500
g (We)
4.6
1x1.2
1x0.75

778644.839
HIP
17+348

17440 399.568 398.988 0.719 399.902 400.621


Reconstruction

28 Ls:
48 31.976 Ts:
-
PIPE CULVERT

CD-53

17460 399.733 399.490 0.759 400.305 401.063


-

80 Kmph
17+323.139
45

e%: 5.0%
Lc: 15.785

17400
17480 400.297 399.623 0.839 400.640 401.478

L=198.444m
17500 400.920 399.872 0.834 401.031 401.864

PROJECT :
17520 401.029 399.981 0.818 401.405 402.222

17540 401.677 400.411 0.907 401.645 402.552

17560 401.803 400.682 1.090 401.763 402.853


17500
Tem
ple

17580 402.497 401.238 1.069 402.058 403.126

17600 402.487 401.501 1.105 402.266 403.371

17620 402.862 401.421 1.254 402.334 403.588

17640 403.061 401.929 1.311 402.465 403.776


Ota

Bo
re

17660 403.196 402.223 0.979 402.956 403.936


17600
Ho
use
Ho

17680 403.227 402.246 0.792 403.275 404.067


use

17700 403.605 402.065 0.525 403.646 404.170

17720 403.163 402.211 0.755 403.490 404.245


L=650.000m
R=-14133.144m

17740 402.872 402.158 0.704 403.588 404.292

17760 402.734 402.158 0.713 403.597 404.310


17700
Hous
e

17780 402.623 402.706 0.781 403.519 404.300


To
ile
t

L=412.197m
R=1200.000m

17800 402.474 403.314 0.954 403.309 404.262

17820 402.445 403.135 1.151 403.044 404.196


SABEESH
Design
Radius:
Easting:

DRAWN

17840 401.939 402.911 1.380 402.721 404.101


Speed
HIP Chainage :

(V):
1200
Extra Widening (We)

17860 401.918 402.806 1.322 402.656


GOURI

403.978
CURVE DETAIL-HIP

DRAWING TITLE :

17800
80
Nothing: 2125025.197 Ls:
Delta (Δ): 19 40 51.430 Ts:

17880 401.333 402.421 1.580 402.247 403.826


e%:
-

DESIGNED
CD-54

Kmph
-
-
-
17+782.624

17900 400.975 402.105 1.737 401.909 403.646


778963.959 Lc: 412.197

17920 400.305 401.234 1.587 401.851 403.438


Proposed Span(m)

DRAWING NUMBER:- ***/MU-BO/HIG/PP/19

SANDEEP
Design Chainage(m)
TO BHOKAR

CHECKED
PIPE CULVERT
Shed
Sam
ad
i

17940 400.134 401.504 1.390 401.811 403.202


FROM KM-17+000 TO KM-18+000
1x1.2
17+927

401.907
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)

17960 400.153 401.500 1.031 402.937


Type

Bo
Propo

17900
re

NGK RAJU
Propo
Existin

sal
Design

17980 399.986 401.631 0.675 401.969 402.644


e=2.500

APPROVED
g Spa
n

Nalla
Chaina

cture

Nalla
of Stru (m)
sed Sp ge

18000 400.006 401.930 0.365 401.957 402.323


an (m
)

Recon

SCALE ON A2

Vertical 1:200

DATE
PIPE C

Horizontal 1:2000

REV : R-0
JUL- 2020
on
ULVE
structi R
DATE
JULY 2020
LEVEL DIFF.

R0
No
SUPERELEVATION

DESIGN CHAINAGE
17900

@8M LHS FROM PCL

@8M RHS FROM PCL

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
Design Chainage

Type of Structure

HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 392.0 (m)
Nalla Nalla

ORIGINAL GROUND/ROAD LEVEL


Proposed Span (m) 1x1
Existing Span (m) 1x0.
.2
75
17+927

18000 400.006 401.930 0.365 401.957 402.323


Nalla
Reconstruction
PIPE CULVERT

18020 400.186 401.621 0.110 401.863 401.973

e=2.500
Nalla

18040 400.128 401.241 0.177 401.419 401.596 Chainage=18044.100m


Level=401.515m

FIRST SUBMISSION
TO MUDKHED

18000
18060 399.738 400.369 0.380 400.819 401.198

L
G
Chainage=18083.058m
18080 399.832 399.650 0.448 400.352 400.800

L=164.946m
Level=400.740m

TA
AV L
18100 398.772 398.670 0.820 399.604 400.424

18120 397.919 398.737 0.699 399.408 400.107

BY
Radius:

18140 397.426 398.513 0.859 398.991 399.850


Easting:

Design Speed
HIP Chainage

Extra Widening
Nothing: 212

18100
:

18160 397.031 398.640 0.573 399.079 399.652


Delta (Δ): 04 47

(V):

CLIENT :
1200
(We)
CURVE DETAIL-

779342.861
HIP

18180 396.256 398.207 0.699 398.816 399.515


03.864 Ts:
5213.756 Ls:

-
e%:

18200 396.688 397.873 0.982 398.455 399.437


80 Kmph
-
CD-55

L=220.000m
-
-

Proposed Span(m)

R=6677.637m
18+201.749

Design Chainage(m)

L=100.204m
Lc: 100.204

R=1200.000m
BOX CULVERT
18220 397.429 398.166 1.129 398.290 399.420

1x2x1.5
18+211
Na

18240 397.289 398.197 1.005 398.457 399.462


lla

Nalla
Proposal

18200
18260 396.556 397.571 1.006 398.558 399.564
Nalla
Nalla
Design Chainage

Type of Structure

18280 396.884 398.091 0.915 398.812 399.726


Existing Span (m) 2x1.
Proposed Span (m) 1x2x

Chainage=18303.058m
2

18300 397.476 397.698 0.785 399.164 399.948 Level=399.987m


1.5
18+211

Reconstruction

L
G
BOX CULVERT

18320 397.410 398.211 0.854 399.355 400.209


Nalla
Chainage=18334.724m
Level=400.401m
18340 397.688 398.443 0.949 399.519 400.468

CONSULTANT :
18300
18360 398.558 398.567 0.966 399.729 400.695

L=207.388m
18380 399.590 399.346 0.760 400.118 400.879

18400 400.940 400.965 0.116 400.901 401.018

18420 401.687 401.782 -0.597 401.709 401.112

18440 402.184 401.936 -0.890 402.054 401.163


18400
18460 401.489 401.665 -0.517 401.687 401.170
Temp
le

L=250.000m
L

R=-9054.930m
Tem
ple

18480 401.101 401.470 -0.053 401.184 401.132


Tem
ple

18500 400.495 400.519 0.526 400.523 401.050

PROJECT :
House

18520 400.151 399.876 0.629 400.295 400.924

e=3.600
e=3.600
L=72.249m

18540 399.781
R=-800.000m

399.491 399.519 0.973 400.754


Radius:
Easting:

18500
18560 398.395 399.057 1.223 399.316 400.539
HIP Chainage :

Design Speed (V):

Ho

L
use
800
779643.3

Chainage=18584.724m
Extra Widening (We)

18580 398.071 398.633 1.313 398.968 400.281


Delta (Δ): 05 10 27.9
22
CURVE DETAIL-HIP

Level=400.213m
Nothing: 2125334.089
Lc:
Ls:

L
53 Ts:

18600 397.924 398.226 1.215 398.776 399.991


e%:
-
CD-56

Chainage=18615.821m
80 Kmph
-
18+525.359

30

Level=399.760m
3.6%
72.249

18620 397.597 397.560 1.474 398.227 399.701

Nalla

18640 397.355 397.382 1.276 398.174 399.450


18600
18660 397.334 397.168 1.269 397.987 399.257
Proposal
Existing Span

Nalla

18680 397.047 397.322 1.082 398.039 399.121


Design Chainage

Nalla
Type of Structure
(m)

Proposed Span(m)

Nalla
Design Chainage(m)
BOX CULVERT

18700 397.281 397.735 0.565 398.477 399.042


Proposed Span (m) 1x2x
2x1.2
18+638
1.5

1x2x1.5
18+638

18720 397.506 397.959 0.674 398.346 399.020


Reconstruction
BOX CULVERT

e=2.500

18740 397.675 397.979 0.338 398.718 399.056


L=250.000m
L=296.440m

R=6993.113m

18700
18760 397.931 397.957 0.297 398.851 399.148

18780 398.385 398.056 0.323 398.975 399.298


e=2.500

18800 398.616 398.345 0.481 399.025 399.505

18820 398.809 399.176 0.587 399.183 399.769


SABEESH
DRAWN

18840 398.733 398.585 0.734 399.357 400.091


18800
18860 399.139 399.776 0.628 399.841 Chainage=18865.821m
GOURI

400.469
Level=400.590m
DRAWING TITLE :

18880 399.288 399.381 0.934 399.956 400.891


L

DESIGNED
G=2.119

18900 399.937 399.631 0.944 400.370 401.315 Chainage=18904.100m


Level=401.402m

18920 400.201 400.211 0.855 400.874 401.730


L=45.000m

DRAWING NUMBER:- ***/MU-BO/HIG/PP/20

SANDEEP
TO BHOKAR

CHECKED

18940 400.846 400.838 0.799 401.319 402.119


FROM KM-18+000 TO KM-19+000
HI P C

18900
Ex

402.072
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)

18960 401.012 401.053 0.407 402.480


t
a

e=5.000
e=5.000
ing:

a
Desig
Delt s:

L=53.123m

NGK RAJU
VE D

R=-500.000m
E

n Sp
CUR age :

Noth (Δ): 0
T

18980 401.052 402.097 0.467 402.346 402.814


e
6
A

APPROVED
d
5
5

00
g (W
Radiu Widenin (V):
IP

East ing: 21 05 14.

19000 401.634 402.237 0.488 402.633


.551

403.121
e)
hain 780022 .411
2554 638
Lc:
IL-H 18+95

SCALE ON A2
L=45.000m

Vertical 1:200

DATE
7
9.4

Horizontal 1:2000

REV : R-0
CD-5 85

JUL- 2020
DATE
JULY 2020
LEVEL DIFF.

R0
No
SUPERELEVATION

DESIGN CHAINAGE
@8M LHS FROM PCL

@8M RHS FROM PCL

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL

HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 392.0 (m)
0

ORIGINAL GROUND/ROAD LEVEL


00
19000 401.634 402.237 0.488 402.633
19
403.121

L=45.000m
19020 401.771 402.598 0.468 402.932 403.400

19040 402.052 402.921 0.335 403.318 403.652

FIRST SUBMISSION
TO MUDKHED

19060 402.024 403.173 0.429 403.448 403.877


0
10

L=56.922m
19
19080 402.555 403.539 0.475 403.601 404.075
Valve

Temple

19100 403.199 403.603 0.551 403.695 404.246


sig
n
W
id

19120 403.378 403.269 0.610 403.778 404.389

BY
Ra lta ng:
HI C

d (W
(V e
0
Ea P C UR

): )
1
7

19140 402.795 403.609 0.571 403.933 404.505


Ex diu (Δ) 21 802
7 :
No stin hain VE D

L=90.000m
ee g 30 .67
De tra s: : 2 25 22.
De thi g: age ET

0
Km
AI

0
e%
:
L-

ph
Ts
:

192
19160 402.704 403.686 0.745 403.849 404.593
HI
P

CLIENT :
c:

80 0.6 7.0 -
%
.
34 67 19+ CD

2.

19180 402.335 403.109 1.046 403.608 404.655


Sp enin 2 57 .262 L 235 -58
9 Ls: 11 359
90 53

19200 402.310 403.271 1.317 403.372 404.689


Gate

19220 402.292 402.616 1.614 403.082 404.696


Proposal

e=7.000
e=7.000
Existing Sp

19240 401.878 402.757 1.860 402.815 404.675


Type of Stru
Proposed Sp

L=112.530m
Design Chain

House

R=-230.000m
cture
age

19260 401.455 401.705 2.402 402.226 404.628


19300

L=700.000m
R=-14671.053m
Proposed Span(m)
an (m) 1x
BO
an (m) 1x

Design Chainage(m)
X
1.0

19280 401.408 402.090 2.170 402.383 404.553


BOX CULVERT
2x1.5
19+275

Reconstructi
on
CULVERT

1x2x1.5
19+275

19300 400.873 401.928 2.197 402.254 404.451

DAM
19320 400.872 402.029 1.869 402.453 404.321

19340 401.217 401.702 1.696 402.468 404.164

CONSULTANT :
L=90.000m
Shed
Typ e
Design

Existing
of

19360 401.415 402.394 1.519 402.462 403.980


Proposal
S
S

19400
Sp
p an

truct
e

19380 401.397 402.275 1.324 402.446 403.769


re
(m

Rec

19400 401.345 401.801 1.184 402.347 403.531


on
Proposed an (m) 3x1.
0

st
19+439
Chainag ) 1x3x1.5

ru
BOX CU

House

19420 400.905 401.283 1.225 402.040 403.265


ction
LVERT

Proposed Span(m)
Design Chainage(m)

19440 399.832 401.045 1.317 401.655 402.972

e=2.500
BOX CULVERT

19460 400.291 401.018 1.295 401.357 402.652


1x3x1.5
19+439

19500

19480 400.052 401.081 1.127 401.177 402.304

e=2.500
19500 400.350 400.973 0.900 401.030 401.929

PROJECT :
19520 400.389 401.223 0.679 400.848 401.527

19540 400.185 400.617 0.406 400.691 401.098


L=329.105m

19560 399.721 400.037 0.727 399.915 400.641


19600

19580 399.227 399.474 0.802 399.355 400.157

19600 398.726 399.422 0.552 399.094 399.646 Chainage=19604.100m


Level=399.538m
Shed

e=2.000 e=2.000

19620 398.186 398.887 0.406 398.710 399.116

19640 397.513 398.203 0.515 398.070 398.586


Ty pe

House

19660 397.503 397.355 0.754 397.301 398.055


House

19700
of
Proposed

Proposal
St
Existing Sp
Sp

Extra

19680 395.778 396.634 0.910 396.616 397.525


Easting:
an

Radius:
Wi
age

Delta (Δ):
an (m)
ructure

de

G=-2.652
Nothing: 21

L=160.513m
:

Design Speed
nin

19700 395.233 396.225 0.867 396.128 396.995


g
7802
CURVE DETA

Proposed Span(m)
Design Chainage(m)
50

(V):
Design Chain (m) 1x1.2

0
1x1.0

(We)
19+746

PIPE CULVERT
IL-HIP

19720 395.603
Reconstruct

394.535 395.968 0.861 396.464


04 25 40.960
PIPE CULV
ion

House

1x1.2
26253.842 Ls:
ERT

Ts:

19+746
e% :
-

19740 394.706 395.130 0.943 394.991 395.934


CD-59

65 Kmph
19+753.910

3.8
25

R
%
HIP Chainage 33.696 Lc: 38.642

e=3.800
e=3.800

19800
19760 394.060 394.517 0.719 394.685 395.404 Chainage=19764.613m
Level=395.281m
L=38.642m
Radius:
Easting:

19780 393.641 394.670 0.572 394.310 394.882


L
HIP Chainage :

House
Design Speed (V):
70
Extra Widening (We)

19800 392.946 393.509 0.464 393.923 394.387


CURVE DETAIL-HIP

Nothing: 2126418.482 Ls:


Delta (Δ): 15 33 07.913 Ts:

e=2.000

19820 392.331 393.207 0.555 393.366 393.920


House
-

SABEESH
CD-60

30 Kmph

DRAWN
-
50
19+919.725

e%: 5.0%

L=61.945m

19840 392.880
780242.748 Lc: 19.001

391.744 392.706 0.601 393.482


HP
e=2.000

19860 391.515 391.905 0.649 392.423


GOURI

393.072
1990
0
ed

DRAWING TITLE :
Sh

Shed

L=200.000m
R=14213.976m

19880 391.033 391.304 0.967 391.723 392.690


DESIGNED
L=50.000m

House
19900 390.993 390.908 1.175 391.161 392.336
use
Ho
Shed

Shed
R

Shed
19920 390.741 390.962 1.126 390.883 392.010
DRAWING NUMBER:- ***/MU-BO/HIG/PP/21

SANDEEP
e=5.000
e=5.000
TO BHOKAR

CHECKED

Shed
19940 390.277 390.932 0.910 390.803 391.712
20

Valve
FROM KM-19+000 TO KM-20+000
00
0

390.659 Chainage=19964.613m
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)

19960 390.698 390.835 0.784 391.443


Level=391.385m
L=50.000m

NGK RAJU

19980 389.952 390.236 0.712 390.481 391.193


L

APPROVED
e=2.000

20000 389.970 390.009 0.920 390.025 390.944


SCALE ON A2

Vertical 1:200

DATE
Horizontal 1:2000

REV : R-0
JUL- 2020
L=50.000m
DATE
JULY 2020
CURVE DE

2126 41

LEVEL DIFF.

R0
No
8.
15 33 07.9
48
TAIL-HIP

SUPERELEVATION

DESIGN CHAINAGE
@8M LHS FROM PCL

@8M RHS FROM PCL

VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
780242.748 Ls:
13 Ts:
-

HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
House

LEVEL DATUM- 384.0 (m)


CD-60

-
19+919.725

30 Kmph
50

ORIGINAL GROUND/ROAD LEVEL


Lc: 19.001

e%: 5.0%

e=2.000
20000 389.970 390.009 0.920 390.025 390.944
HP

d
20020 389.772 389.678 0.913 389.783 390.695

She
199
00

Shed

L=50.000m
20040 389.509 389.211 0.787 389.659 390.446
House

FIRST SUBMISSION
House
TO MUDKHED

20060 389.680 389.112 0.854 389.344 390.197


Shed

Shed
Shed

Bore

e=5.000
e=5.000
20080 388.512 388.176 1.179 388.770 389.948

L=63.597m
R=90.000m
Shed
Shed
Valve
Radius:
Easting:

200

20100 388.491 387.837 1.511 388.189 389.699


00

G=-1.245
HIP Chainage :

L=271.774m
Design Speed (V):
90

20120 388.273 387.618 1.450 388.000 389.450

BY
Extra Widening (We)
CURVE DETAIL-HIP

House Line

20140 387.919 387.246 1.624 387.578 389.201

L=50.000m
Nothing: 2126534.030 Ls:
Delta (Δ): 40 29 13.089 Ts:

20100
Shed
House
CD-61

35 Kmph
-

Line
50
20+074.578

Bore
20160 387.702 387.073 1.485 387.468 388.952
e%: 5.0%

CLIENT :
780141.247 Lc: 63.597

20180 387.914 387.242 1.097 387.606 388.703

20200 387.654 387.095 0.937 387.517 388.454


House Line

20220 387.440 386.963 1.236 386.970 388.205


Chainage=20236.387m
Level=388.001m
20240 387.159 386.649 1.362 386.595 387.957
20200

20260 386.942 386.366 1.570 386.181 387.751


House

20280 386.979 386.039 1.307 386.298 387.605

L=100.000m
R=6479.219m
House

20300 386.762 385.771 1.084 386.438 387.522

20320 386.554 385.671 1.124 386.376 387.500

e=2.000
House

Chainage=20336.387m
Level=387.528m
20340 386.566 385.773 0.981 386.559 387.539
20300

L=356.740m

CONSULTANT :
e=2.000
House

20360 386.390 385.619 1.251 386.347 387.599

20380 386.488 385.447 1.392 386.267 387.658


Type of
Proposal
Existing

Proposed Span(m)

House
Proposed

Design Chainage(m)
Design Ch

PIPE CULVERT

20400 386.354 385.175 1.618 386.100 387.718


Span (m
Structure
ainage
Span (m

1x1.2
House

20+368

20420 386.588 385.562 1.238 386.540 387.778


) 3x0.

Reconstr
9
) 1x1.2

PIPE CU
20+368

20400
20440 386.521 385.615 1.329 386.508 387.838
uction

G=0.299
LVERT

L=208.098m
20460 386.419 385.983 1.484 386.414 387.897
Proposed Span(m)
Design Chainage(m)

20480 385.597 385.705 2.126 385.832 387.957


House

PIPE CULVERT
Type of
Proposal
Existing
Proposed

1x1.2
Design Ch

20500 386.115 385.595 1.873 386.143 388.017


20+476

PROJECT :
Nalla
Span (m
Structure
ainage
Span (m

Nal
la
20520 L 386.212 386.013 1.806 386.270 388.076
) 2x0.
9
) 1x1.2

Chainage=20544.485m
20500
Reconstru

20540 386.665 386.262 1.465 386.671 388.136 Nal


la
PIPE CU
20+476

Level=388.150m
ction

Radius:
Easting:
LVERT

20560 387.005 386.483 0.970 387.216 388.187


Design Spee
House

Nothing: 21

e=3.700
e=3.700
House

e:
CURVE DE

26

L=58.093m
d (V):

20580 387.535 386.436 0.869 387.338 388.207


R=-300.000m
Extra Widenin 300
g (We)
780315.091

05 42.052
HIP Chainag TAIL-HIP

20600 387.160 386.939 0.699 387.497 388.196


L
Ts:
Delta (Δ): 11 994.955 Ls:

-
House

L=120.000m
50 Kmph

R=-12964.367m
-
CD-62
House

20620 387.244 386.823 0.643 387.512 388.155


25
20+565.861

e%: 3.7%
Lc: 58.093

20640 386.981 386.213 0.870 387.212 388.083


20600

20660 387.081 386.546 0.950 387.030 387.980 Chainage=20664.485m


Level=387.953m
House

20680 386.930 387.041 0.885 386.970 387.855

20700 387.142 386.582 0.741 386.988 387.730


House

20720 387.051 386.687 0.744 386.861 387.604

20740 386.901 386.629 0.645 386.834 387.479


House

20 700
House

20760 386.739 386.570 0.597 386.757 387.354


Line
House
House

20780 386.572 386.865 0.586 386.642 387.228


House
House

20800 386.594 386.500 0.345 386.758 387.103


House

20820 386.583 386.181 0.479 386.499 386.977


SABEESH
DRAWN

20840 386.501 386.241 0.451 386.400 386.852


20 800
House

L=452.784m

20860 386.671 386.598 0.264 386.463


GOURI

386.727
House Lin
e

DRAWING TITLE :
House

G=-0.627
L=408.116m

20880 386.912 386.293 -0.103 386.704 386.601


DESIGNED
House Line

20900 386.566 387.279 -0.184 386.660 386.476

20920 386.450 386.363 -0.042 386.392 386.350


DRAWING NUMBER:- ***/MU-BO/HIG/PP/22

SANDEEP
House
TO BHOKAR

CHECKED

20940 386.208 386.224 0.297 385.927 386.225


20900
FROM KM-20+000 TO KM-21+000
House Lin
e

385.903
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)

20960 386.207 386.012 0.197 386.099


Shed
House

NGK RAJU
Shed

20980 385.920 386.639 0.069 385.905 385.974


e=2.000

APPROVED
House

21000 386.291 385.737 -0.051 385.899 385.849


Shed

SCALE ON A2

Vertical 1:200

DATE
Horizontal 1:2000

REV : R-0
JUL- 2020
TO MUDKHED TO BHOKAR

21+055
ainage
Design Ch an (m) 1x1.2
os ed Sp 9
Prop ) 1x0.
Span (m PIPE CULV
ERT
Existing ct ure
Type of St
ru
co nstr uction
Re
Proposal

Shed

Rest House
Shed
Shed

House
House

House
Shed

House
House Line

Tem
Shed Shed

ple
Ota
Shed

21000
Shed
House
Shed

e
House Lin
20 900

Gate
Relvey

Relvey Gate
Chainage=21072.601m
Level=385.393m

PIPE CULVERT
Design Chainage(m) 21+055
Proposed Span(m) 1x1.2

LEVEL DATUM- 384.0 (m)


385.723

385.598

385.472
385.393
385.849

FINISHED ROAD LEVEL


385.820

385.247

384.568
385.899

384.996

ORIGINAL GROUND/ROAD LEVEL


-0.096
-0.051

0.476
0.351

LEVEL DIFF.
385.737

384.607
385.710

385.197

385.091

ORIGINAL GROUND LEVEL


@8M LHS FROM PCL
385.584

384.722
386.013

385.100

ORIGINAL GROUND LEVEL


386.291

@8M RHS FROM PCL

HORIZONTAL ALIGNMENT

VERTICAL ALIGNMENT

e=2.000
SUPERELEVATION
21072.601

DESIGN CHAINAGE
21000

21020

21040

21060

CLIENT : CONSULTANT : PROJECT : DRAWING TITLE : SCALE ON A2


PLAN & PROFILE (MUDKHED-BHOKAR ROAD) Horizontal 1:2000
FROM KM-21+000 TO KM-21+151 Vertical 1:200

DRAWING NUMBER:- ***/MU-BO/HIG/PP/23 DATE


DRAWN DESIGNED CHECKED APPROVED JUL- 2020
JULY 2020 R0 FIRST SUBMISSION
SABEESH GOURI SANDEEP
DATE No BY
NGK RAJU REV : R-0

You might also like