Professional Documents
Culture Documents
JULY 2020
R0
No
LEVEL DIFF.
SUPERELEVATION
DESIGN CHAINAGE
@8M LHS FROM PCL
VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
Tin Shed
HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
Bus
L
0 304.940 304.899 -0.126 305.065 304.939 Level=304.939m
Tin Shed
Radius:
Easting:
L
20 305.008 305.138 0.237 305.039 305.276
HIP Chainage :
L
R
FIRST SUBMISSION
House
400
305.612
TO MUDKHED
CURVE DETAIL-HIP
L
Nothing: 2119490.826 Ls:
-
e%:
CD-1
45 Kmph
-
-
0+037.830
20
100
G=1.683
L=170.236m
100 306.228 306.265 0.375 306.247 306.622
BY
House
House
CLIENT :
160 307.279 306.914 -0.109 307.740 307.632
Chainage=170.236m
Level=307.804m
L=197.465m
180 307.576 307.299 -0.030 307.994 307.964 200
L=100.000m
Radius:
R=-11248.451m
Easting:
Chainage=270.236m
4000
Extra Widening (We)
Level=309.042m
CURVE DETAIL-HIP
L
R
300
Nothing: 2119491.502 Ls:
Delta (Δ): 00 28 52.812 Ts:
-
e%:
CD-2
CONSULTANT :
340 309.127 308.975 0.409 309.186 309.596
L=210.639m
420 310.105 310.631 0.074 310.157 310.230
G=0.794
L=296.029m
440 310.025 309.730 -0.031 310.421 310.389
e=2.000 e=2.000
480 310.625 309.731 0.390 310.316 310.707 500
PROJECT :
500 310.443 309.884 0.053 310.813 310.865
Radius:
Easting:
:
Extra Widening (W
Nothing: 211948
1500
e)
9.517 Ls:
18.817 Ts:
764281.585 Lc:
-
e%:
L=75.186m
Level=311.391m
-
-
-
0+548.519
75.186
House
-
e%:
DP
CD-4
65 Kmph
G=1.797
-
-
-
L=172.407m
764508.898 Lc: 34.948
L
R
800
House
Proposal
SABEESH
Design Chainage
Type of Structure
DRAWN
Chainage=838.672m
Existing Span (m) 1x0.9
Proposed Span (m) 1x1.2
0+846
GOURI
L=85.545m
Reconstruction
DRAWING TITLE :
PIPE CULVERT
900
C
a
h
Nothin
Proposed Span(m)
Easting
a
:
g
Design Chainage(m)
:
(Δ
Design
S
House
id
PIPE CULVERT
2
e
SANDEEP
CURVE :
11
L=40.000m
9 4
76466
1x1.2
3
DETAIL
TO BHOKAR
CHECKED
8
0+846
24 11
TO KM-1+000
.8
0
.5
3
L=160.000m
4
R=-7502.601m
L
6
R
L
Majid
DP
90 Ls:
65
e%:
-
K
CD-5
33
NGK RAJU
.726
p
-
40
APPROVED
1000
House
Chainage=998.672m
Level=316.952m
Tank
Water
SCALE ON A2
Vertical 1:200
DATE
Horizontal 1:2000
REV : R-0
JUL- 2020
DATE
JULY 2020
R0
No
LEVEL DIFF.
SUPERELEVATION
DESIGN CHAINAGE
@8M LHS FROM PCL
VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
0+935.726
65 Kmph
-
40
HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 308.0 (m)
33.006
House
1000 315.127 316.426 0.896 316.052 316.948
House
Tank
Water
1020 315.496 316.259 0.768 316.113 316.881
House
Tin Shed
FIRST SUBMISSION
1040 315.632 316.375 0.228 316.585 316.814
TO MUDKHED
BY
1120 315.566 316.232 316.622 316.545
L=254.176m
1140 315.219 316.663 0.109 316.369 316.478
G=-0.336
CLIENT :
L=279.983m
1160 315.113 316.031 0.086 316.325 316.410
Chainage=1278.656m
1280 315.077 315.709 316.031 316.007 Level=316.012m
1300
1300 315.462 315.763 0.021 315.927 315.949
Radius:
Easting:
Proposal
CONSULTANT :
Design Chainage
Type of Structure
Extra Widening (We
1200
)
L=187.992m
R=1200.000m
Proposed Span (m) 1x1.2
7 Ls:
60 Ts:
e%
765065.927 Lc:
1+338
-
-
-
Reconstruction
1+340.582
Proposed Span(m)
PIPE CULVERT
Design Chainage(m)
PIPE CULVERT
1400
1400 316.126 316.210 316.551 315.886
1x1.2
1+338
L=300.000m
1440 316.167 316.373 -0.821 316.788 315.967
R=26151.630m
1460 315.669 316.324 316.538 316.031
CANAL
Proposed Span(m)
Design Chainage(m)
PIPE CULVERT
1500
PROJECT :
1x1.2
Type of Structure
Existing Span (m)
Proposed Span (m)
L=134.301m
Chainage=1578.656m
Level=316.725m
Radius:
1600
HIP Chainage :
G=0.811
9.713
L=60.201m
CURVE DETAIL-HIP
80
Lc:
Nothing: 2119563.317 Ls:
Ts:
Chainage=1638.857m
e%:
-
L=110.924m
Kmph
-
-
-
1+624.188
110.924
1700
1700 317.118 316.788 0.338 317.200 317.538
Design Spee
HIP Chainag
Extra Widenin
Nothing: 21
19
d (V):
CURVE DETA
PANDAN
1200
g (We)
L=250.000m
ROAD
R=-10908.173m
24 15.541
IL-HIP
1800
L=155.076m
Ts:
Delta (Δ): 07 583.919 Ls:
R=1200.000m
House
-
e%:
SABEESH
CD-8
-
-
-
1+782.499
DRAWN
House
Lc: 155.076
SANDEEP
TO BHOKAR
CHECKED
NGK RAJU
Level=314.939m
2000
2000 313.115 314.253 0.733 314.009 314.743
SCALE ON A2
Vertical 1:200
DATE
Horizontal 1:2000
REV : R-0
JUL- 2020
TO MUDKHED TO BHOKAR
Nalla
CURVE DETAIL-HIP CD-10
HIP Chainage : 2+433.311
Easting: 766157.274 Lc: 86.674
CD-9 CURVE DETAIL-HIP CD-11
IL-HIP Nothing: 2119597.631
Design Chainage 2+095 CURVE DETA 2+289.490 Ls: 30 HIP Chainage : 2+672.002 Design Chainage 2+803
: Delta (Δ): 06 12 27.152
Proposed Span (m) 1x1.2 HIP Chainage Lc: 116.274 Ts: - Easting: 766395.818 Lc: 29.879 Proposed Span (m) 1x3x1.5
Existing Span (m) 3x0.75 Easting: 766013.966 -
Radius: 800 e%: 3.6% Nothing: 2119587.237 Ls: Existing Span (m) 3x0.9
: 21 19 58 4.532 Ls: Extra Widening (We) -
Type of Structure PIPE CULVERT Nothing - - Delta (Δ): 01 25 35.901 Ts: Type of Structure
33 05.962 Ts: Design Speed (V): - BOX CULVERT
Proposal Delta (Δ): 05 - 80 Kmph Radius: 1200
Nalla
Reconstruction e%: e%: - Proposal Reconstruction
1200
L
CANA
House
Water
Tank
Tin
Shed
Nalla
2500
2400
2600
2300
Tin Shed
2700
2000
2100
2200
3000
2800
Water
2900
Tank Tin Shed
CANAL House
CANAL
Nalla
Proposed Span (m) 1x1.2 -
Nothing: 2119583.047 Ls:
Existing Span (m) 1x0.75 -
PIPE CULVERT Delta (Δ): 01 48 46.720 Ts:
Type of Structure 1200 e%: -
Radius:
Proposal Reconstruction ing (We) -
Extra Widen
Design Speed (V): 80 Kmph
Chainage=2709.842m
Chainage=2909.842m
Level=315.951m
Level=315.622m
BOX CULVERT
Chainage=2165.962m
Chainage=2135.911m
Chainage=2335.962m
Design Chainage(m) 2+803
Chainage=2494.719m
Chainage=2374.719m
Level=314.247m
PIPE CULVERT
Level=314.127m
Level=313.615m
Design Chainage(m) 2+095
Level=313.243m
Level=313.173m
Proposed Span(m) 1x1.2 PIPE CULVERT
Design Chainage(m) 2+368 Design C
Proposed Span(m) 1x1.2 Propose
314.294
312.854
315.324
316.404
316.484
316.474
316.384
314.743
314.507
314.322
314.065
314.080
314.223
314.330
314.330
313.967
312.948
312.927
313.080
313.562
314.065
314.820
315.072
315.827
316.072
316.508
316.237
316.033
315.772
314.508
313.786
313.569
314.569
315.576
316.266
314.826
314.144
314.100
313.310
313.813
314.317
315.143
314.186
314.112
313.115
314.221
313.341
312.861
315.461
314.191
FINISHED ROAD LEVEL
313.244
313.204
314.624
313.703
313.237
313.807
313.783
313.720
313.542
312.673
312.295
313.292
313.623
314.900
315.540
316.428
316.455
314.982
316.572
316.300
315.620
315.432
314.943
314.598
313.702
314.009
312.779
313.826
312.406
313.446
313.936
314.069
315.326
314.194
311.472
311.840
311.940
312.612
314.313
316.312
316.016
315.126
311.910
312.971
312.691
312.921
313.841
313.921
313.071
316.061
312.711
ORIGINAL GROUND/ROAD LEVEL
-0.045
-0.025
-0.098
0.374
0.504
0.764
0.424
0.334
0.733
0.805
0.907
0.382
0.523
0.502
0.952
0.238
0.270
0.367
0.442
0.500
0.507
0.287
0.085
0.220
0.340
0.200
0.228
0.488
0.559
0.369
0.449
0.249
0.029
0.314
1.077
1.287
1.008
0.010
0.413
0.315
1.409
1.869
1.276
1.526
1.215
1.163
1.159
0.571
0.381
1.114
0.511
LEVEL DIFF.
313.524
312.704
312.374
312.874
313.304
312.754
312.794
316.234
314.253
313.803
313.421
313.483
313.467
313.083
313.038
312.933
312.962
312.995
313.660
313.523
314.970
315.628
316.350
314.532
319.030
315.500
313.507
313.605
313.480
312.266
312.959
313.629
310.769
313.566
314.559
311.794
311.453
311.682
312.182
314.128
314.142
312.169
313.551
312.821
314.871
313.119
ORIGINAL GROUND LEVEL
312.151
313.311
311.031
314.161
311.411
313.454
313.264
313.258
313.050
312.070
313.092
313.532
313.092
312.278
310.898
312.403
312.207
313.732
313.693
314.380
313.803
314.928
315.395
315.650
315.605
314.983
314.803
314.358
314.457
314.726
310.479
315.976
315.239
313.946
ORIGINAL GROUND LEVEL
314.173
311.845
311.045
311.548
311.448
312.815
314.012
313.918
313.212
313.126
314.106
311.184
313.115
314.118
312.112
313.641
314.451
315.331
313.651
311.931
314.101
@8M RHS FROM PCL
R=-1200.000m R=800.000m R R
HORIZONTAL ALIGNMENT L=86.674m
L=371.379m L=116.274m L L L L=150.456m L L=149.548m L=37.971m L=72.136m L=60.000m
e=3.600
e=5.600
DESIGN CHAINAGE
2000
2020
2040
2060
2080
2100
2120
2140
2160
2180
2200
2220
2240
2260
2280
2300
2320
2340
2360
2380
2400
2420
2440
2460
2480
2500
2520
2540
2560
2580
2600
2620
2640
2660
2680
2700
2720
2740
2760
2780
2800
2820
2840
2860
2880
2900
2920
2940
2960
2980
3000
CLIENT : CONSULTANT : PROJECT : DRAWING TITLE : SCALE ON A2
PLAN & PROFILE (MUDKHED-BHOKAR ROAD) Horizontal 1:2000
FROM KM-2+000 TO KM-3+000 Vertical 1:200
SUPERELEVATION
DESIGN CHAINAGE
@8M LHS FROM PCL
VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 304.0 (m)
Tin
Shed
House
Tin She
d
3000 313.212 313.119 0.488 313.702 314.191
L
R
e=5.600
e=5.600
3020 313.225 313.194 0.544 313.330 313.873
FIRST SUBMISSION
3040 311.954 310.929 0.721 312.835 313.556
TO MUDKHED
G=-1.588
Na Na
lla lla
L=250.016m
Proposed Span(m)
Flag
Design Chainage(m)
Tin
Shed
MINOR BRIDGE
L=60.000m
Na
lla
Gate
House
1x5.8
3+044
3080 312.606 312.565 -0.059 312.979 312.920
3100
Proposal
Nothi
BY
ng
Easting:
Radius:
:
Wi
Delta (Δ):
Design Chainage
de
HIP Chainag
Type of Structure
Existing Span (m)
Design Spee
21
e=2.000
3120 311.525 310.878 0.219 312.066 312.285
Proposed Span (m)
e:
nin g
19
CURVE DETA
20
d (V):
0
1x5.8
1x5.8
(We)
766738.033
CLIENT :
04 32 31.309
Widening
L=110.369m
Chainage=3159.859m
588.626 Ls:
Ts:
e%
e=2.000
MINOR BRIDGE
0.6
CD-13
3+014.527
50 Kmph
5.6
60
%
Lc: 15.855
L
House
Design Chainage(m)
3300
3300 308.420 307.535 1.520 308.592 310.112
3+278
1x3x1.5
e=2.800
e=2.800
Proposal
L=151.897m
R=1000.000m
3320 308.475 308.412 1.331 308.674 310.004
Design Chainage
CONSULTANT :
Type of Structure
Radius:
Reconstruction
Extra Widening (We
1000
L=400.000m
)
Delta (Δ): 08 42 11.
R=14333.173m
BOX CULVERT
CURVE DETAIL-HI
L
3400
1.091 Ls:
059 Ts:
e%
767003.135 Lc:
-
:
2.8
-
3+298.914
30
Bore
%
151.897
Tin
Shed
Tin
Shed
PROJECT :
3500 308.842 309.367 1.046 309.241 310.287
Tin
Shed
Chainage=3559.859m
3560 e=2.500
308.637 309.358 1.149 309.735 310.884 Level=310.883m
e=2.500
G=1.203
L=157.323m
3700
3700 310.941 311.208 1.227 311.341 312.568
Chainage=3717.182m
Level=312.775m
3720 311.021 311.369 0.974 311.835 312.809
L
Radius:
Easting:
SABEESH
04
HIP Chainage :
DRAWN
Extra Widening
:
600
L=200.000m
35.
CURVE DETAIL-H
(We)
R=-12685.444m
.67 3
IP
DRAWING TITLE :
L=52.113m
-
R=-600.000m
CD-15
80 Kmph
-
35
DESIGNED
FROM KM-3+000
e%: 4.7%
52.113
3900
3900 312.230 312.420 0.995 312.661 313.657
DRAWING NUMBER:- ***/MU-BO/HIG/PP/04
SANDEEP
Chainage=3917.182m
Proposal
TO BHOKAR
Level=313.604m
CHECKED
Existing Span (m
Type of Structure
NGK RAJU
) 2x0.6
Design Chainage(m)
3+916
BOX CULVERT
APPROVED
Reconstruction
BOX CULVERT
4000
4000 311.409 311.420 1.437 311.857 313.295
L=170.761m
SCALE ON A2
Vertical 1:200
DATE
Horizontal 1:2000
REV : R-0
JUL- 2020
DATE
JULY 2020
R0
No
LEVEL DIFF.
SUPERELEVATION
DESIGN CHAINAGE
@8M LHS FROM PCL
VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
Reconstruction
L=170.761m
4020 311.292 311.343 1.348 311.872 313.220
e=2.500
FIRST SUBMISSION
4040 311.402 311.623 1.111 312.034 313.145
TO MUDKHED
Radius:
313.070
HIP Chainage :
4100
Extra Widening (We)
CURVE DETAIL-HIP
G=-0.374
BY
L=358.187m
Nothing: 2119892.685 Ls:
Delta (Δ): 01 30 01.892 Ts:
L=52.378m
-
e%:
R=2000.000m
4120 311.671 312.385 0.628 312.218 312.846
CD-16
100 Kmph
-
-
-
4+101.199
767778.299 Lc: 52.378
CLIENT :
4160 311.189 311.902 0.883 311.813 312.697
Radius:
L=78.667m
Easting:
L
R
4220 310.667 310.956 1.013 311.460 312.472
Nothing: 2119930.811 Ls:
Delta (Δ): 00 49 46.383 Ts:
-
e%:
100 Kmph
-
-
-
4+220.532
767891.381 Lc: 28.957
CONSULTANT :
4340 310.774 311.272 0.797 311.326 312.122
Nalla
Type of Structure
4400
Nalla
Nalla
Nalla
4400 309.486 310.306 1.797 310.368 312.165
Nalla
Existing Span (m) 2x0.9
4+408
Proposed Span (m) 1x3x1.5
L=300.000m
R=21253.673m
4440 310.048 310.770 1.581 310.707 312.288
L=395.644m
Proposed Span(m)
Design Chainage(m)
4500
PROJECT :
4500 310.155 311.221 1.465 311.148 312.613
4700
G=1.038
L=217.246m
4720 314.436
72.7
Nothing: 2120100.905
51
80
Lc:
Ls:
L=200.765m
-
R=-3000.000m
CD-18
Kmp h
-
4+731.073
-
-
GOURI
al
la
DRAWING TITLE :
4900
Proposed Span(m)
Design Chainage(m)
SANDEEP
4x6
TO BHOKAR
CHECKED
N
TO KM-5+000
la
Proposal
Chainage=4942.615m
4940 310.753 311.569 4.060 312.233 316.294 Level=316.294m
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)
Design Chainage
Type of Structure
NGK RAJU
L=252.032m
Existing Span (m) 3x8.
G=-0.001
6
4+974
L=48.273m
Chainage=4990.888m
Reconstruction
Level=316.293m
5000
MINOR BRIDGE
Vertical 1:200
DATE
N
Horizontal 1:2000
al
REV : R-0
JUL- 2020
la
DATE
JULY 2020
R0
No
LEVEL DIFF.
SUPERELEVATION
DESIGN CHAINAGE
@8M LHS FROM PCL
VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
4x6
HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
3x8.6
e=2.500
We
ll
We
FIRST SUBMISSION
ll
We
L=100.000m
ll
R=1786.052m
5060 314.782 315.173 1.036 316.594 317.630
Radius:
Easting:
Chainage=5090.888m
ll
5100
Level=319.092m
L
G
HIP Chainage :
Level=319.792m
BY
2000
Extra Widening (We)
Proposal
CURVE DETAIL-HIP
Design Chainage
Type of Structure
-
e%:
-
-
L=99.427m
-
5+133.173
CLIENT :
R=2000.000m
768742.145 Lc: 99.427
2x9.5
5+200
Ca
nal
MINOR BRIDGE
Proposed Span(m)
Design Chainage(m)
5200 318.845 319.953 0.029 322.812 322.840
MINOR BRIDGE
L=200.000m
R=-1977.701m
Radius:
L=55.483m
5+200
HIP Chainage :
-
e%:
50 Kmph
-
-
L=73.898m
5+275.313
5300
R=-2000.000m
768875.348 Lc: 73.898
L
G
Chainage=5321.117m
5320 317.916 317.689 0.867 319.259 320.125 Level=320.075m
CONSULTANT :
5340 317.136 316.977 0.955 318.367 319.323
L=90.000m
R=1775.909m
5380 316.215 315.861 1.630 316.762 318.392
5400
5400 316.745 316.642 1.229 317.037 318.265
Chainage=5411.117m
Level=318.292m
5420 317.327 317.097 0.848 317.492 318.341
PROJECT :
5500 318.818 318.733 -0.501 319.285 318.783
L=331.996m
5600
5600 318.498 317.439 1.194 318.143 319.336
Design Chainage
Type of Structure
PIPE CULVERT
1x1.2
5+628
PIPE CULVERT
Chainage=5743.114m
5740 317.708 317.264 2.002 318.109 320.111 Level=320.128m
GOURI
DRAWING TITLE :
Proposed Span(m)
Proposed Span (m) 4x5
Design Chainage(m)
DESIGNED
MINOR BRIDGE
FROM KM-5+000
Reconstruction
4x5
L=250.000m
5900
5900 317.200 318.071 2.305 318.265 320.570
Bore
SANDEEP
TO BHOKAR
CHECKED
NGK RAJU
Chainage=5993.114m
6000
Level=320.430m
6000 317.500 318.686 1.124 319.284 320.408
SCALE ON A2
Vertical 1:200
DATE
Horizontal 1:2000
REV : R-0
JUL- 2020
DATE
JULY 2020
R0
No
LEVEL DIFF.
SUPERELEVATION
DESIGN CHAINAGE
@8M LHS FROM PCL
VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
To
we
HORIZONTAL ALIGNMENT
r
W
EL
L
6020 318.341 319.348 0.519 319.828 320.346
e=2.500
FIRST SUBMISSION
6040 318.859 319.540 0.200 320.083 320.284
TO MUDKHED
G=-0.312
6060 320.306
L=112.124m
319.723 319.805 -0.085 320.221
Na
ll
a
6080 318.544 319.387 -0.013 320.172 320.159
6100
Type o
Proposa
l
Design
Chainage=6105.238m
d
BY
Level=320.081m
f Struct
Span (m
ure
Propose ainage
6140 319.436
1x0.6
CLIENT :
E CULV
ruction
Proposed Span(m)
Design Chainage(m)
6160 318.355 318.843 0.508 319.565 320.073
ERT
PIPE CULVERT
6180 318.637 319.107 0.555 319.597 320.152
L=130.000m
1x1.2
R=9180.077m
6+126
6200
6200 318.729 318.897 0.534 319.740 320.274
Extra
Delta
Chainage=6235.238m
CUR
Speed
Level=320.596m
6240 319.220 318.745 0.374 320.275 320.649
76
2 0
Eastin inage :
(V):
6
86.8
.912
-HIP
L=73.623m
L
R=3000.000m
Ts:
-
c
Radius: ): 01 24 21 41 Ls:
e%:
:
100 Km
6300
-
CD-2
-
-
6+258 1
.397
73.623
CONSULTANT :
6340 320.938 320.363 0.503 321.251 321.753
L=157.292m
6400 321.214 320.684 0.847 321.568 322.416
G=1.105
L=424.965m
6460 321.842 321.156 0.858 322.221 323.079
PROJECT :
6500 321.898 321.910 0.803 322.717 323.520
Des
in
g
HIP C :
g
ig
V
:
Delta :
n
E
2
7
3
CUR ge :
7
12 0
2
8
ETAIL
Extra Speed (V
4
0
)
800
Radiu idening ( :
6
haina 70216.75
-HIP
We)
.5
Chainage=6660.202m
67
e
Ls:
.642 Ts:
%
5
2
-
3.29
CD-2 8
80 Km
3
-
6700
Na
lla
e=3.600
e=3.600
R=-800.000m
Chainage=6860.202m
6860 325.358 321.492 2.217 323.507 325.723 Level=325.722m
DESIGNED
FROM KM-6+000
323.529
sig
SANDEEP
Pro
stin
Design Chainage(m)
g
hai
G=-0.673
n
TO BHOKAR
CHECKED
Exi e of S
Typ posal
BOX CULVERT
L=98.201m
a
TO KM-7+000
tru
e
c
(
t u
(m
n C Span m)
)
De posed pan re
6+992
1x2x1.5
Chainage=6958.403m
6+ x1.5
NGK RAJU
ons
APPROVED
1x0 CUL on
1x2 .75 VERT
Vertical 1:200
DATE
Horizontal 1:2000
REV : R-0
JUL- 2020
TO MUDKHED TO BHOKAR
Nalla
De
s
Pro ign C
Exi pose hain
stin d S age
Ty g pa
p
Pro e of Span n (m 7+
po S ) 6
sal truct (m) 1x1 38
ure 1x0 .2
P .75
Nalla
Re IPE
con CU
str LVE
uct R
ion T H
E IP CU
No asti Cha RVE
<
D th ng ina D
7500
---
R elta ing : ge ET
--
740
Ex adiu (Δ : 77 : AIL
TO
De tra s: ): 21 08 -H
D
O
13 214 18 IP
RL
sig W
0
79 .90 7 C
760
4 n ide
I
CD-2 2 Sp n 3 2 .7 1 +6 D
P
E T A IL-HI 7+421.41 46 i 3
ee ng 20 3. 17 L 3 -2
ED 2.9 d 0 16 c 8 5
CURV ge : c: 6 80 (V (We 6 Ls: : 4 .35
0
0 L 7. 6
haina 770604.16 6 Ls: ): ) Ts
3
-2 6 8 HIP C g: 6 .68 - e% : 2
60 72
n 45 s:
CD 6.91 .05 Easti g: 2121 37.244 T : 7.0% 65 0. 7 -
:
4 11 - in
Noth Δ): 24 0 50
2 e% HI CU
Km 6 .0%
WEL
1 Ea P Ch RVE
L
IP 7+ c: ( 1 0.6
73
-H L : - Delta : ph ph No sting ainag DET
IL - s (We) 65 Km
77
Ls : Radiu idening :
00
TA 20
HP
De thing : e : AIL
E
D : .8 94 Ts : W
Extra Speed ( V )
Ra lta (Δ : 2 7709
-H
00
7
E e 44 2.5 65 e% - ph IP
V n d
R ag 0 3 .2
Km Desig Ex ius: : ) 121 97.9 C
CU ain 77 212 40 0
Ota
De tra W
1 0 5 97 97 7+83 D-26
3
Ch 21 0 12 000 ) 10 sig id 1 5 .88 5
I P ing: : 0 3 e n S eni 4 8.2 0 Lc: .298
H st ng : (W : pe ng 10 31 Ls: 77.
Ea thi (Δ) ing )
ed (W T s 75
No lta s: den d (V (V) e)
e% : 30 7
e u i e :
D di W pe :
4
-
Ra tra n S 65 - .6%
Ex sig Km
De
72
ph
00
WEL
78
L
00
De
Pro sign
C
Ex pose hain
i
Ty sting d Sp age
pe a
Pro of Span n (m 7+
po S )
2
99 .5 sal truc (m) 1x 914
RT
71
tur 1.
6+ 2x1 5 VE e 1 x0 2
79
1 0.7 CUL tion
x
00
P .7
1x X ruc Re IPE 5
00
con CU
) BO nst str LVE
o uct
n
(m e
r ec ion RT
a tu R
Sp ruc
g t
in S
ist of
Ex pe
Ty
80
00
70
00
HI CU
Ea P Ch RV
No sting aina E DE
De thin : ge TA
IL-
Ra lta g: 77 : HI
Ex dius (Δ): 212 1167 P
De tra W : 03 135 .89 8
+0
sig 2 9
3 2 .52 5
n S iden L 09
pe ing 800 4.77 0 L c: .257
ed (W 5 s
(V e) Ts :
): e% :
:
80 - 3.6%
Km
ph
SUPERELEVATION
DESIGN CHAINAGE
@8M LHS FROM PCL
VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 316.0 (m)
FIRST SUBMISSION
7040 323.620 322.998 1.105 323.686 324.791
TO MUDKHED
L=166.661m
7080 323.712 323.317 0.691 324.172 324.863
BY
7120 323.867 322.319 0.582 324.486 325.068
e=2.500
7140 324.134 323.175 0.702 324.518 325.220
L=350.000m
L
R
CLIENT :
R=11948.583m
7160 324.414 323.382 0.764 324.642 325.407
e=2.500
7180 324.470 324.325 0.456 325.170 325.626
L=157.023m
7260 325.422 326.167 0.758 326.082 326.840
CONSULTANT :
7340 327.005 326.271 1.199 327.347 328.547
L=80.000m
328.998
G=2.257
L=118.641m
7380 328.654 327.660 1.217 328.232 329.450
L=62.946m
R=150.000m
7440 333.749 329.750 -0.865 331.665 330.799
PROJECT :
7500 L=80.000m 332.217 330.410 0.353 331.658 332.011
e=7.000
e=7.000
L=200.000m
7540 333.580 331.303 0.178 332.532 332.710
L
R=-18183.527m
G=1.157
L=118.417m
DRAWING TITLE :
SANDEEP
PIPE CULVERT
TO BHOKAR
CHECKED
339.552
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)
NGK RAJU
APPROVED
Vertical 1:200
DATE
Horizontal 1:2000
REV : R-0
JUL- 2020
e=3.600
e=3.600
L=47.336m
R=800.000m
TO MUDKHED TO BHOKAR
7+ .2
1x1 75
Rec
1x0 CUL n
914
PIP tructi
ons
.
E
VER
o
790
T
IP
DETAIL-H 9+139.143
0
CURVE
inage :
HIP Cha 771713.195
Easting: 2122173.866
: 43.209
Nothing
): 01 55
Delta (Δ 1200
CD-29
ETAIL-HI
P 1 Radius: ening (We)
CURVE D 8+758.68 id
Extra W eed (V):
ge : 19.815
HIP Chaina 771533.486 Lc: 75 Design
Sp
Easting: 706 Ls:
2121838. -
Nothing: 03 47 03.532 Ts: 7.0%
:
Delta (Δ): 30 0 e%
Radius: 0.6
e)
ening (W 80 Kmph
800 Extra Wid d (V):
ee
0 Design Sp
9000
8900
HIP ing:
8800
Eas
Not (Δ):
Delt
Cha
t
Extr n Spe
hing
Des
a
ius:
VE D
in
a
ig
:
771
ETA
212
870
0 3
1
135 4.775 %: 3.
23 2
800 )
0
9.52
(We
IP
TO JAMBHALI -----
0
CD- 57
L
810
c:
Ts:
9.2
e
0 HIP CUR
27
80 K
860
Eas Cha VE D
Val
Bor
-
ve
No ting: inage ETAI
e
3
mph
De thing L-H
-
:
6%
0
: 77 IP
Ra lta (Δ 212 1395
>
diu ) C
Ext s: : 6 131 964 8+2 D-28
.
8 04 8.66 42
De ra W 07. 9 Lc: 1 .189
sig ide
n S nin 150 321 Ls: 78.
pee g ( 2
Ts: 70 03
850
d ( We
Tem
V): )
ple
e%
: 7 -
.
50 0.6 0%
0
Km
ph
82
840
0 0
0
8300
Bor
e
SUPERELEVATION
DESIGN CHAINAGE
@8M LHS FROM PCL
VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 336.0 (m)
e=3.600
e=3.600
8020 341.581
L=47.336m
340.557 340.803 0.855 342.435
R=800.000m
FIRST SUBMISSION
8040 341.519 341.733 1.010 342.187 343.197
TO MUDKHED
L
8060 341.194 343.020 1.034 342.924 343.959
L
8080 342.158 343.331 0.738 343.983 344.720
BY
L=70.000m
8120 345.858 346.180 -0.480 346.723 346.243
CLIENT :
G=3.808
L=304.436m
8160 348.734 347.759 0.046 347.721 347.767
L=178.203m
R=-150.000m
e=7.000
e=7.000
8260 351.427 351.076 0.111 351.464 351.575
Chainage=8299.897m
8300 352.541 352.226 0.699 352.399 353.098 Level=353.094m
CONSULTANT :
8340 353.159 353.497 0.531 354.022 354.554
L=80.000m
8380 353.857 354.250 0.934 354.941 355.875
PROJECT :
8500 356.754 356.473 1.384 357.648 359.032
e=2.500
8520 357.603 356.991 1.551 357.889 359.441
8560 e=2.500
358.027 357.183 1.817 358.339 360.157
SANDEEP
TO BHOKAR
CHECKED
NGK RAJU
Vertical 1:200
DATE
Horizontal 1:2000
REV : R-0
JUL- 2020
DATE
JULY 2020
LEVEL DIFF.
R0
No
SUPERELEVATION
DESIGN CHAINAGE
@8M LHS FROM PCL
VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 352.0 (m)
L=275.360m
9000 359.139 358.334 -0.319 359.479 359.161 TO JAMBHALI ----- >
e=2.500
9040 358.186 358.041 -0.744 359.007 358.264
FIRST SUBMISSION
TO MUDKHED
Chainage=9099.897m
Design Speed (V):
L
G
CURVE DETAIL-HIP
Nothing: 2122173.866
Delta (Δ): 01 55 43.209
Chainage=9122.494m
9120 355.293 355.406 0.164 355.919 356.083
9100
BY
80
Level=356.010m
Ls:
Ts:
e%:
-
Kmp
CD-30
R
h
-
-
9+139.143
Proposal
L=40.394m
9160 354.351 353.241 1.105 354.103 355.209
CLIENT :
Design Chainage
Type of Structure
Existing Span (m)
Proposed Span (m)
Nall
a
9180 353.174 351.958 0.217 354.803 355.020
Proposed Span(m)
Design Chainage(m)
9+190
L=120.000m
4x5.75
Nall
R=2409.742m
a
MINOR BRIDGE
9200 352.981 354.058 0.327 354.671 354.998
Widening
4x5.75(sk)
4x5.75
We
L=85.202m
ll
9+190
MINOR BRIDGE
Chainage=9242.494m
9240 354.762 354.740 -0.052 355.503 355.450 Level=355.501m
Na
lla
9260 355.296 355.212 -0.329 356.191 355.862
R
Radius:
Easting:
L=41.909m
9280 356.226 355.649 -0.384 356.660 356.275
HIP Chainage :
9300
Delta (Δ): 01 36 02.860 Ts:
-
e%:
CD-31
80 Kmph
-
-
-
9+265.496
CONSULTANT :
9360 356.838 357.559 -0.191 358.118 357.927
PROJECT :
G=2.065
9520 359.289 359.616 0.839 360.393 361.232
9500
Chainage=9779.632m
9780 365.478 364.844 0.687 365.914 366.601 Level=366.594m
Gate
Val
ve
368.095
DRAWING TITLE :
SANDEEP
TO BHOKAR
CHECKED
367.301
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)
APPROVED
Vertical 1:200
DATE
Horizontal 1:2000
REV : R-0
JUL- 2020
DATE
JULY 2020
LEVEL DIFF.
R0
No
SUPERELEVATION
DESIGN CHAINAGE
@8M LHS FROM PCL
VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 362.0 (m)
e=2.500
10040 366.807 365.861 2.814 367.490 370.303
FIRST SUBMISSION
Sa
ma
di
TO MUDKHED
Proposed Span(m)
L
Design Chainage(m)
Nall
a
BOX CULVERT
10080 367.469 366.985 3.281 367.296 370.578
L=600.000m
1x2x1.5
R=-20324.098m
10+070
10100 367.888 367.514 2.511 368.175 370.685 10100
Na
lla
Type
Design
Existin
10120 368.864 368.179 1.597 369.177 370.773
BY
f
d
Proposa
l
gS
S
S
tr
p
Radius:
Easting:
a
Chaina
Bo
re
n
e=4.700
e=4.700
10140 369.815 368.960 0.676 370.165 370.841
ge
ucture
L=98.169m
R=600.000m
HIP Chainage :
(m) 1
Re
Propose pan (m) 1
Design Speed (V):
x0
CLIENT :
Extra Widening (We)
.7
10+07
st
5
0
x2x1.5
CURVE DETAIL-HIP
ru
BOX CU n
Delta (Δ): 09 22 27.880 Ts:
LVERT
80 Kmph
CD-32
L
370.928
35
10+136.358
10200
e%: 4.7%
772187.884 Lc: 98.169
CONSULTANT :
10360 368.510 368.879 0.894 369.400 370.293 Ot
a
Chainage=10379.632m
10380 368.730 368.239 0.852 369.274 370.126 Level=370.129m
PROJECT :
10520 L=591.436m 367.738 367.238 0.601 368.283 368.884
G=-0.887
10540 368.201
L=298.939m
366.953 366.913 0.506 368.706
Chainage=10678.571m
10680 366.270 365.706 0.640 366.825 367.465 Level=367.477m
10700
Proposal
Type of Structure
Reconstruction
Na
lla
Bor
e
Design Chainage(m)
Nalla
L
R
SABEESH
la
1x7
Nal
DRAWN
10+812
364.845
Nalla
367.539
L=350.000m
Nalla
R=9852.699m
DRAWING TITLE :
Radius:
Easting:
:
Nothing: 212357
10900
(We)
e=2.500
CURVE DETAIL-H
IP
SANDEEP
0.411 Ls:
12.301 Ts:
e%
772641.148 Lc:
-
:
TO BHOKAR
CHECKED
100 Kmph
CD-33
-
-
-
e=2.500
368.203
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)
Vertical 1:200
DATE
Horizontal 1:2000
REV : R-0
JUL- 2020
TO MUDKHED TO BHOKAR
CD-34
CURVE DETAIL-HIP
11+339.660
HIP Chainage : 69.695
772993.877 Lc:
Easting: 80
2 Ls:
Nothing: 2123942.08 -
00 Ts:
Delta (Δ): 26 37 17.6 7.0%
De
Radius: 150 e%: Pr sign
0.6 o
Extra Widening (We) Ex pos Cha
65 Kmph Ty istin ed S inag
Design Speed (V): Pr pe o g Sp pan e
op
os f Str an ( (m) 11
al uc m) 1x +44
Sam
ad
tur
2x 2x1. 0
i
Sh
ed
e
B 0. 5
Re OX 9
co
Sch
ool
ns CUL
tru VE
cti RT
11300
Hous
e
on
11
40
HP
0
Ga
te
1 12
HP
00
33
CD- 699
11
IP +825. .861
111
- H
50
AIL 10 : 27
DET Lc -
VE e :
0
U R 1 4 8 Ls: -
C inag 41 .
00
1 House
Delt ius: in g
n
Rad a Wide ed (V)
: De thin g: age ETA
11
r e Ra lta g: 7 : IL
Ext ign Sp -H
00
60
D e s
De tra : 0 23 4.
1 1 89 55 11 CD
sig Wi
0
n den 4 5 7.9 4 +7 -3
Sp in 20 1. 16 Lc 33. 5
ee g 0 64 : 0
d (W 0 5 Ls: 43 22
109
(V e) Ts .55
Nalla
):
e% : - 2
Na
lla
:
00
Nalla
10 - -
0K - HI CU
Ea P Ch RV
11
mp
h No stin ain E DE
De hin g: age TAI
t
Nalla
70
Ra lta ( g: 77 : L-H
108
IP
0
Ex dius Δ): 212 356
De tra W : 01 386 5.88 11 CD
00
sig id 35 5.6 2 +9 -3
n S en 2 4 L 17. 6
pe ing 200 1.36 3 L c: 1
ed (W 0 9 s: 55 98
la
Nal
(V e) Ts .47
): e% : - 6
: -
1
10 - -
1
0K
80
W mp
ate
rT
Sama
di
h Nalla
0
an
k
Nalla
Nalla
Nal
la
Nalla
Nal
la
Nal
la
De Na
lla
Pr sign
11
Nalla
Ex opos Ch
9
Ty istin ed aina
00
S
Pr pe o g Sp pan ge
op Nal
os f Str an ( (m) 11
la
al uc m)
tu 1x +87
re 5x 3x1 5
0 .5
Re OX .6
B
co
ns CUL
tru VE
12
cti RT
on
00
0
CLIENT : CONSULTANT : PROJECT : DRAWING TITLE : SCALE ON A2
PLAN & PROFILE (MUDKHED-BHOKAR ROAD) Horizontal 1:2000
FROM KM-10+000 TO KM-11+000 Vertical 1:200
R0
No
SUPERELEVATION
DESIGN CHAINAGE
@8M LHS FROM PCL
VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 368.0 (m)
L=384.542m
FIRST SUBMISSION
TO MUDKHED
G=2.665
L=111.429m
11100 371.696 372.258 0.241 372.253 372.494
BY
e=2.000 e=2.000
Chainage=11140.000m
11140 372.799 373.279 0.246 373.314 373.560 Level=373.560m
CLIENT :
11180 374.159 374.469 0.147 374.414 374.561
L=80.000m
11280 376.597 377.427 -0.740 377.235 376.495
L=300.000m
R=-12300.808m
11320 377.702 378.579 -0.888 377.929 377.041
e=7.000
e=7.000
CONSULTANT :
L=69.695m
R=150.000m
11360 377.542 378.928 -0.590 378.046 377.456
L=80.000m
Chainage=11440.000m
11440 375.248 376.135 0.917 376.980 377.898 Level=377.898m
PROJECT :
11520 375.492 376.341 1.794 376.285 378.079
1x2x1.5
11+440
379.313
L=250.000m
R=19238.480m
DRAWING TITLE :
SANDEEP
BOX CULVERT
L=55.476m
TO BHOKAR
R=-2000.000m
CHECKED
378.898
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)
Level=380.737m
11980 378.452 378.954 1.891 378.900 380.792
e=2.500
APPROVED
SCALE ON A2
Vertical 1:200
DATE
Horizontal 1:2000
REV : R-0
JUL- 2020
TO MUDKHED TO BHOKAR
CURV
HIP Chai E DETAIL-HIP
n
Easting: age : CD-37
12+051.
Nothing: 773699 924
.131
Delta (Δ 2123845.722 Lc: 26.856
): 00 46 Ls:
Nalla Radius: 09.767 -
2000
Nalla
Ts:
Nalla
Extra W -
id e%:
Design ening (We) -
Nalla
Speed (V -
):
100 Km
Nalla
ph
130
Nalla
Nalla
00
12000
age 12+667
Design Chain 1.5
an (m) 1x2x
House
Proposed Sp
12100
(m) 1x1.2
Existing Span
129
T
cture BOX CULVER A
Type of Stru Reconstructi
on E DET
CURV ge :
12200
Bore
al
00
Propos h a in a
HIP C :
Samadi
g
Eastin g:
Nalla
12300
Nothin Δ):
a (
Delt :
128
s
Radiu idenin
12400
Nalla
Nalla
W
Extra Speed
00
ig n
Des
12500
12700
WELL
Nalla
12600
WELL
Nalla
R0
No
SUPERELEVATION
DESIGN CHAINAGE
@8M LHS FROM PCL
VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 378.0 (m)
L=93.562m
12020 380.260 379.662 1.701 379.701 381.402
e=2.500
12040 378.626 379.990 1.450 380.258 381.707
L
R
FIRST SUBMISSION
TO MUDKHED
BY
12140 380.881 380.973 1.583 381.651 383.233
CLIENT :
12180 381.383 381.797 1.407 382.436 383.844
G=1.526
L=403.335m
12200 381.861 381.995 1.440 382.709 384.149
L=421.838m
12300 384.262 383.857 1.282 384.393 385.675
CONSULTANT :
12360 385.520 384.800 1.109 385.482 386.591
Chainage=12379.776m
12380 385.993 385.247 1.014 385.881 386.896 Level=386.892m
PROJECT :
L=250.000m
R=13324.125m
12520 387.055 388.689 0.531 389.240 389.770
e=4.700
e=4.700
Chainage=12841.472m
12840 399.878 398.190 0.622 399.583 400.205 Level=400.255m
SANDEEP
e=2.500
TO BHOKAR
CHECKED
e=2.500
SCALE ON A2
Vertical 1:200
DATE
Horizontal 1:2000
REV : R-0
JUL- 2020
TO MUDKHED TO BHOKAR
C h 3 .
HIP ting: 212 38 1 0 ph
: 3 200 Km
Eas thing ): 1 ) 65
No lta (Δ ( We
i n g :
De ius: iden (V)
14000
d
Ra ra W peed
Ext sign S
-41 4
139
De
CD 7.75 085
P +65 296.
la
Nal
I
-H 13 c: -
00
AIL L -
ET 9 s:
V ED : 7 .73 34 L s: -
U R ag e 2 2 .0 8 T :
C ain 77 5 00 7 e% -
C h 2 38 19.8 ph
130
CD-40 P : 1
HI sting : 2 21 12 00 Km
13
IP
ETAIL-H 429 65
13
CURVE D 13+306. Ea thing ): 8 e)
10 : : 87.142 13+5
55
No lta (Δ (W
00
e
in ag ing ):
80
Lc
HIP Cha .3 37 ge .5 De dius: iden d (V
78 45 haina m) 1x2x1
0
7748 Ls: C
la
Easting: 2123747.221 n
Nal
Desig d Span ( Ra tra W Spee
0
- 5
hi ng : 42 Ts: s e 2x0.7 LVERT
N ot 09 .1
Prop o n (m ) CU Ex sign
): 33 17 e%: 7.0% g Spa BOX De
9 Delta (Δ 150 tin re structi
on
Nalla
CD-3 3 0.6 Ex is uctu
of Str Recon
129
137
Lc: 75 Design Sp ee
0
a 3 9
hain 72.0 :
7746 9.688 Ls
Nal
HIP C :
0
la
-
1
g 8 s:
Eastin g: 21238 04.236 T : 7.0%
Nalla
00
3
Nalla
20
1 e%
Nothin Δ): 19 0 0
Nalla
Temple
( 9 0.9
Delta : ph 0
s We) 50 Km
Radiu idening ( :
1360
Nalla SHET TALE
Nalla
a W ( V )
Extr S p eed
n
Desig
0
13500
SHET TALE
601
13+
1330
SHET TALE
ge 2
1x1. 5
13400
aina (m)
n Ch n 7
1x0. ULVER
T
Desig sed Spa m) C
o
Prop g Span re
( PIPE uction
0
in tu n s t r
Exist of Struc Reco
e
Typ sal
o
Prop
R0
No
SUPERELEVATION
DESIGN CHAINAGE
@8M LHS FROM PCL
VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 404.0 (m)
L=75.000m
13020 406.871 406.779 0.457 407.139 407.596
Chainage=13041.472m
13040 408.635 408.954 0.177 408.399 408.576 Level=408.649m
e=7.000
e=7.000
L
R
FIRST SUBMISSION
TO MUDKHED
e=7.000
e=7.000
13060 410.455 411.307 -1.167 410.740 409.574
L=75.000m
13120 417.669 421.580 -5.103 417.672 412.568
BY
13140 419.179 423.403 -5.727 419.293 413.567
G=4.991
L=185.280m
13160 421.644 424.942 -6.371 420.936 414.565
CLIENT :
e=2.500
13180 421.704 424.030 -7.044 422.607 415.563
L=72.699m
13200 422.664 425.848 -7.370 423.932 416.561
e=2.500
13220 426.721 427.499 -7.911 425.470 417.560 Chainage=13226.752m
Level=417.897m
L=45.000m
13260 433.096 432.893 -14.186 433.538 419.352
e=7.000
e=7.000
L=87.142m
R=-150.000m
13320 438.020 433.066 -14.015 434.958 420.944
L=200.000m
R=-2705.710m
13340 434.044 432.077 -12.491 433.669 421.179
CONSULTANT :
13360 429.103 430.585 -9.291 430.558 421.266
L=45.000m
13400 425.665 425.289 -4.390 425.387 420.997
L=114.266m
13480 420.847 420.498 -1.456 420.665 419.209
PROJECT :
13520 418.114 416.847 0.389 417.859 418.249
1x2x1.5
13+555
G=-2.401
L=296.085m
e=2.500
R=-800.000m
Chainage=13876.261m
Level=409.696m
13880 410.077 411.828 -0.775 410.382 409.607
DESIGNED
SANDEEP
L=47.602m
R=200.000m
TO BHOKAR
CHECKED
L=60.000m
Vertical 1:200
DATE
Horizontal 1:2000
REV : R-0
JUL- 2020
DATE
JULY 2020
LEVEL DIFF.
R0
No
SUPERELEVATION
DESIGN CHAINAGE
@8M LHS FROM PCL
VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
13900
HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 392.0 (m)
Proposal
Type of St
Nal
la
ructure
Proposed Sp e
an (m) 3x
an (m) 1x
Reconstruct
13+970
e=2.500
BOX CULV
FIRST SUBMISSION
Nalla
TO MUDKHED
e=2.500
14100 404.758 404.277 0.552 405.062 405.615
BY
L=238.483m
14140 404.065 403.790 0.448 404.623 405.072
Nalla
14100
14160 403.421 403.363 0.442 404.357 404.800
CLIENT :
14180 402.933 403.093 0.509 404.020 404.528
CONSULTANT :
14300
14360 400.410 400.321 1.295 400.788 402.083
G=-1.358
L=641.776m
14420 399.711 400.056 1.098 400.170 401.268
14400
14460 399.044 398.605 1.111 399.614 400.725
PROJECT :
14520 397.755 397.733 1.534 398.376 399.910
D
IP
el
14500
14560 397.191 397.332 2.557 396.810 399.367
C
ta
ha
Nothing
Radius:
(Δ
:
Extra W
):
Design Sp
inag
CURVE D
23
idening
35
eed (V):
(W
776149.2
ETAIL-H
1800
07
Easting: 2123939.824
Lc
L=741.152m
Ls:
R=-1800.000m
e%
29.749 Ts :
-
CD-43
: 741.
-
416
-
-
80 Kmph
Nal
la
14680 396.002 396.038 1.743 395.995 397.737
Chainage=14718.037m
Level=397.220m
Nal
14720 395.776
la
396.207
Nalla
e
Proposed Span(m)
s
14800
Design Chainage(m)
DRAWING TITLE :
ig
ro
Existi
Type
p
n
BOX CULVERT
g
DESIGNED
of Str
pa
1x6x2.5
14+869
inage
Na
a ll
14+8
SANDEEP
69
5
6x2.5
L=400.000m
R=11013.386m
Nalla
TO BHOKAR
ucture econstructi
CHECKED
OX CU on
395.397
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)
Prop
in
Nalla
o
o
n Ch
Type sal
SCALE ON A2
Vertical 1:200
DATE
Horizontal 1:2000
Prop g Span
REV : R-0
JUL- 2020
Exist f Struct
ge
(
(m
Desig sed Span )
ure
aina m)
DATE
JULY 2020
LEVEL DIFF.
R0
No
SUPERELEVATION
BOX CULVERT
DESIGN CHAINAGE
14900
VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 390.0 (m)
Nalla
15000 394.297 395.050 2.439 394.561 397.000
Shed
Ty
15020 395.163 394.559 2.309 394.949 397.259
Samadi
pe of
Proposal
e=2.500
Str
Nalla
ure
FIRST SUBMISSION
TO MUDKHED
Proposed Span(m)
15060 396.343 395.611 1.257 396.628 397.885
Design Chainage(m)
15000
BOX CULVERT
(m) 2x0.75
15+005
(m) 1x2x1.5
1x2x1.5
15+005
Reconstruction
BOX CULVERT
BY
L
G
Nalla
L=335.829m
15160 398.515 399.191 0.646 399.345 399.991
15100
CLIENT :
15180 399.754 399.821 0.521 399.847 400.368
L=340.000m
R=-6058.739m
15340 401.587 403.601 -1.693 402.704 401.011
CONSULTANT :
15360 400.657 402.445 -1.366 402.161 400.795
15300
e=3.600
e=3.600
15420 399.668 400.530 -0.572 400.321 399.748
L=148.745m
R=800.000m
15440 398.851 399.518 -0.241 399.508 399.268
Radius:
Easting:
Extra Wid
Delta (Δ):
en
15400
15460 397.526 397.903 0.338 398.382 398.721
CURVE
ge :
eed (V):
800
Design Sp ing (We)
Level=397.891m
62
HIP Chaina DETAIL-HIP
Temp
le
-
Nothing: 776895.482 Lc:
PROJECT :
80 Kmph
-
CD-44
15+416.08
30
e%: 3.6%
3
G=-3.338
L=79.433m
15540 393.894 394.694 1.220 394.889 396.109
15500
15560 393.063 393.951 1.260 394.182 395.441 Chainage=15566.035m
Level=395.240m
L=120.000m
R=2841.170m
e=2.500
L=240.068m
15600
1x5x2
Nalla
Nalla
WE
LL
Nalla
Nalla
15700
Span (m
Structure
ainage
)
Span (m
BOX CULV
uction
ERT
395.309
G=0.886
L=340.512m
DRAWING TITLE :
De
e=3.600
e=3.600
De
C
SANDEEP
a
h
si
Nothin
Easting
L=250.240m
a
g
:
g
R=-800.000m
n
(Δ
:
in
TO BHOKAR
CHECKED
):
S
id
p
15940 394.946
2
15900
17 55 1
395.263
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)
9.5
0
NGK RAJU
777385 87 Ls:
APPROVED
-
CD-45
Lc: 25
e%: 3
65 Kmp
.458
-
30
.6%
SCALE ON A2
Vertical 1:200
DATE
Horizontal 1:2000
REV : R-0
JUL- 2020
TO MUDKHED TO BHOKAR
46
CD- 47
HIP 6+260.4 .728
E T AIL- 1 73
VE D Lc: 55
CUR age : 95
h a in 7 688.2 74 Ls: -
C 7 7 . 4 s :
H I P 5 3 8 T .0%
ing: 124 .410 e%: 7
East ing: 2 3 47 39
3 0.6 h
Nal
Noth (Δ): 125
la
mp
a
Delt s: g (W
e) 50 K Bore
d iu n in
Ra W ide d (V):
a
Extr n Spee
ig
Nal
95 Des
+0
la
16 .2
L
NA
CA
x 1 RT CURVE D
ge ) 1 0.75 LVE ETAIL-H
ina 1x E CU ion HIP Chai IP
C ha an (m P t na
Easting: ge :
CD-47
sig
n
dS
p
(m
) PI struc 777895.5 16+487.034 CU
HIP C RVE DETA
AL
N
De pose Span ure econ Nothing:
CA
163
19 Lc: h IL-HIP
Pro ting truc
Nal
lat R Delta (Δ 21 24 443.497 122.581 Eastin ainage :
162
): 23 24 Ls: g CD
s
Exi e of
S Radius: 40.461 - Nothin : 77798 16+5 -48 CURVE DETAIL-HIP CD-50 1
-5 54 3
Samadi
00
p l :
la
Ty posa Delta CD 8.0 .62
Nal
Extra Wid 300 - HIP Chainage : 16+751.089
3 : 26
Nal
-45 e%: (
Radiu Δ): 05 07 6.698 Ls 8
la
00
o en 3
CD .458 4 P r Design Sp ing (We) -
s :
.813 Easting: 778159.977 Lc: 4.786 P +9 11 50
15.58 HI 16 Lc:
House
6
IP 5+91 250.2
eed (V): 0.6 Extra : 300 3 Ts - Nothing: 2124436.478 Ls: 35 L- -
- H 40 Kmph Wide : I s : %
IL 1 c: 30
Gate
Desig n
n Spe ing (We) e%: - Delta (Δ): 00 47 00.638 Ts: - TA 9 L .8
D ETA L
- ed (V - DE : .41 34 Ts: : 4
RV
E : .88
0 Ls: ): 0.6 Radius: 350 e%: 5.4% V E e 346 .3 1
g 8 47 85 % 6
e 0. ph
16
Gat
16
a 7
7 437 .58 e%2 3 : ph
Ch Ch
Scho
1 3 50
40
WELL ol
Design Speed (V): 65 Kmph
HIP ting: 212 55 1
9 -
ph I P ing: : 2 29 3 230 e)
la
10
Nal
Nalla
H st
Eas hing: : 17 800 ) Km g W
0
t 65 Ea thin (Δ): (
g ):
No ta (Δ) We No lta s: enin (V
0
l g (
De ius: enin (V): Hou
se Lin
e
t
se Lin
S Ex sig
e
x
E ign
De
s De
1650
Ota Nalla
Nalla
Nalla
160
Ota
Temple
Ota
00
Nal Temple
16600
la
HP
16800
16700
16900
Nalla
1590
Samadi
Nal
la
e: 16+649.508
Bore
Easting:
778058.494
Nothing: 21 Lc: 86.3
Nalla
24 Design Chainage
Delta (Δ): 16 424.628 Ls: -
16+821
House 28 55.596 Proposed Span (m)
Radius: Ts: - 3x4
Existing Span (m)
Extra Widenin 300 e%: - 3x4.5
g (We) Type of Structure
Design Spee 0.6 MINOR BRIDGE
d (V): Proposal
40 Kmph Reconstruction
Nalla
CLIENT : CONSULTANT : PROJECT : DRAWING TITLE : SCALE ON A2
PLAN & PROFILE (MUDKHED-BHOKAR ROAD) Horizontal 1:2000
FROM KM-16+000 TO KM-17+000 Vertical 1:200
R0
No
SUPERELEVATION
DESIGN CHAINAGE
@8M LHS FROM PCL
VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 384.0 (m)
FIRST SUBMISSION
L
TO MUDKHED
Proposed Span(m)
e=2.500
Design Chainage(m)
16100 395.333 395.385 1.680 395.277 396.958
PIPE CULVERT
L=150.000m
R=-5662.869m
1x1.2
16+095
16120 395.155 395.060 1.887 394.954 396.840
BY
L=96.928m
16140 395.128 395.013 1.532 395.121 396.652
e=2.500
16160 394.490 394.776 1.089 395.305 396.393
CLIENT :
Chainage=16176.547m
Level=396.126m
16180 394.156 394.781 0.886 395.179 396.065
L=55.000m
16220 393.888 394.913 0.562 394.797 395.359
e=7.000
e=7.000
L=73.728m
R=125.000m
16280 393.086 393.251 1.274 393.027 394.301
L=55.000m
16340 391.719 392.416 0.667 392.576 393.243
G=-1.763
CONSULTANT :
L=324.541m
16360 391.762 391.936 0.803 392.088 392.891
L=73.673m
16400 391.304 391.085 0.722 391.464 392.185
Chainage=16501.088m
L=122.581m
16500 389.919 389.285 0.666 389.757 390.422
R=-300.000m
Level=390.403m
PROJECT :
16520 389.714 389.479 0.639 389.443 390.082
e=2.000
16540 389.737 389.096 0.614 389.154 389.768
L
e=2.000
16560 389.749 388.918 -0.221 389.702 389.481
L
R
16660 388.488
L=86.300m
e=5.400
e=5.400
L=38.910m
Design Chainage(m)
DRAWN
L=650.000m
3x4
388.408
L=50.000m
DRAWING TITLE :
SANDEEP
TO BHOKAR
CHECKED
388.244
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)
Vertical 1:200
DATE
Horizontal 1:2000
REV : R-0
JUL- 2020
L=50.000m
DATE
JULY 2020
LEVEL DIFF.
R0
No
SUPERELEVATION
DESIGN CHAINAGE
Na
0
lla
VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
16
HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 388.0 (m)
Radius:
Easting:
O
Temta
ple
Nothing: 2124447.334 Ls:
Delta (Δ): 29 33 01.851 Ts:
L=50.000m
0.6
-
50
16+938.054
e%: 4.8%
FIRST SUBMISSION
778346.419 Lc: 118.623
TO MUDKHED
L
391.056
17000
17080 390.268 390.141 0.575 390.894 391.469
BY
Tan ater
L=70.687m
e=2.500
R=1200.000m
17140 391.433 390.845 1.143 391.726 392.869
Chainage=17151.088m
Level=393.155m
Radius:
Easting:
CLIENT :
HIP Chainage :
17100
e=2.500
Design Speed (V):
-
e%:
80 Kmph
CD-52
-
-
-
L=119.746m
17+115.166
778484.257 Lc: 70.687
G=2.610
17280 394.194 394.304 1.504 395.015 396.519
L=243.012m
17300 394.779 394.918 1.569 395.473 397.041
L=45.000m
17320 395.487 395.096 1.514 396.050 397.563
L
R
e=5.000
e=5.000
Proposed Span(m)
Design Chainage(m)
CONSULTANT :
1x1.2
L=45.000m
17300
17380 397.345 397.360 0.950 398.179 399.129
De
HIP
Proposal
Chainage=17394.100m
lta
Ch
Level=399.497m
Easting:
Radius:
Nothing:
(Δ)
399.650
:
Design Chainage
ag
Type of Structure
Existing Span (m)
21
01
Proposed Span (m)
Design Speed
:
Extra Widenin
24
(V):
CURVE DETAIL-
500
g (We)
4.6
1x1.2
1x0.75
778644.839
HIP
17+348
28 Ls:
48 31.976 Ts:
-
PIPE CULVERT
CD-53
80 Kmph
17+323.139
45
e%: 5.0%
Lc: 15.785
17400
17480 400.297 399.623 0.839 400.640 401.478
L=198.444m
17500 400.920 399.872 0.834 401.031 401.864
PROJECT :
17520 401.029 399.981 0.818 401.405 402.222
Bo
re
L=412.197m
R=1200.000m
DRAWN
(V):
1200
Extra Widening (We)
403.978
CURVE DETAIL-HIP
DRAWING TITLE :
17800
80
Nothing: 2125025.197 Ls:
Delta (Δ): 19 40 51.430 Ts:
DESIGNED
CD-54
Kmph
-
-
-
17+782.624
SANDEEP
Design Chainage(m)
TO BHOKAR
CHECKED
PIPE CULVERT
Shed
Sam
ad
i
401.907
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)
Bo
Propo
17900
re
NGK RAJU
Propo
Existin
sal
Design
APPROVED
g Spa
n
Nalla
Chaina
cture
Nalla
of Stru (m)
sed Sp ge
Recon
SCALE ON A2
Vertical 1:200
DATE
PIPE C
Horizontal 1:2000
REV : R-0
JUL- 2020
on
ULVE
structi R
DATE
JULY 2020
LEVEL DIFF.
R0
No
SUPERELEVATION
DESIGN CHAINAGE
17900
VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
Design Chainage
Type of Structure
HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 392.0 (m)
Nalla Nalla
e=2.500
Nalla
FIRST SUBMISSION
TO MUDKHED
18000
18060 399.738 400.369 0.380 400.819 401.198
L
G
Chainage=18083.058m
18080 399.832 399.650 0.448 400.352 400.800
L=164.946m
Level=400.740m
TA
AV L
18100 398.772 398.670 0.820 399.604 400.424
BY
Radius:
Design Speed
HIP Chainage
Extra Widening
Nothing: 212
18100
:
(V):
CLIENT :
1200
(We)
CURVE DETAIL-
779342.861
HIP
-
e%:
L=220.000m
-
-
Proposed Span(m)
R=6677.637m
18+201.749
Design Chainage(m)
L=100.204m
Lc: 100.204
R=1200.000m
BOX CULVERT
18220 397.429 398.166 1.129 398.290 399.420
1x2x1.5
18+211
Na
Nalla
Proposal
18200
18260 396.556 397.571 1.006 398.558 399.564
Nalla
Nalla
Design Chainage
Type of Structure
Chainage=18303.058m
2
Reconstruction
L
G
BOX CULVERT
CONSULTANT :
18300
18360 398.558 398.567 0.966 399.729 400.695
L=207.388m
18380 399.590 399.346 0.760 400.118 400.879
L=250.000m
L
R=-9054.930m
Tem
ple
PROJECT :
House
e=3.600
e=3.600
L=72.249m
18540 399.781
R=-800.000m
18500
18560 398.395 399.057 1.223 399.316 400.539
HIP Chainage :
Ho
L
use
800
779643.3
Chainage=18584.724m
Extra Widening (We)
Level=400.213m
Nothing: 2125334.089
Lc:
Ls:
L
53 Ts:
Chainage=18615.821m
80 Kmph
-
18+525.359
30
Level=399.760m
3.6%
72.249
Nalla
Nalla
Nalla
Type of Structure
(m)
Proposed Span(m)
Nalla
Design Chainage(m)
BOX CULVERT
1x2x1.5
18+638
e=2.500
R=6993.113m
18700
18760 397.931 397.957 0.297 398.851 399.148
400.469
Level=400.590m
DRAWING TITLE :
DESIGNED
G=2.119
SANDEEP
TO BHOKAR
CHECKED
18900
Ex
402.072
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)
e=5.000
e=5.000
ing:
a
Desig
Delt s:
L=53.123m
NGK RAJU
VE D
R=-500.000m
E
n Sp
CUR age :
Noth (Δ): 0
T
APPROVED
d
5
5
00
g (W
Radiu Widenin (V):
IP
403.121
e)
hain 780022 .411
2554 638
Lc:
IL-H 18+95
SCALE ON A2
L=45.000m
Vertical 1:200
DATE
7
9.4
Horizontal 1:2000
REV : R-0
CD-5 85
JUL- 2020
DATE
JULY 2020
LEVEL DIFF.
R0
No
SUPERELEVATION
DESIGN CHAINAGE
@8M LHS FROM PCL
VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
LEVEL DATUM- 392.0 (m)
0
L=45.000m
19020 401.771 402.598 0.468 402.932 403.400
FIRST SUBMISSION
TO MUDKHED
L=56.922m
19
19080 402.555 403.539 0.475 403.601 404.075
Valve
Temple
BY
Ra lta ng:
HI C
d (W
(V e
0
Ea P C UR
): )
1
7
L=90.000m
ee g 30 .67
De tra s: : 2 25 22.
De thi g: age ET
0
Km
AI
0
e%
:
L-
ph
Ts
:
192
19160 402.704 403.686 0.745 403.849 404.593
HI
P
CLIENT :
c:
80 0.6 7.0 -
%
.
34 67 19+ CD
2.
e=7.000
e=7.000
Existing Sp
L=112.530m
Design Chain
House
R=-230.000m
cture
age
L=700.000m
R=-14671.053m
Proposed Span(m)
an (m) 1x
BO
an (m) 1x
Design Chainage(m)
X
1.0
Reconstructi
on
CULVERT
1x2x1.5
19+275
DAM
19320 400.872 402.029 1.869 402.453 404.321
CONSULTANT :
L=90.000m
Shed
Typ e
Design
Existing
of
19400
Sp
p an
truct
e
Rec
st
19+439
Chainag ) 1x3x1.5
ru
BOX CU
House
Proposed Span(m)
Design Chainage(m)
e=2.500
BOX CULVERT
19500
e=2.500
19500 400.350 400.973 0.900 401.030 401.929
PROJECT :
19520 400.389 401.223 0.679 400.848 401.527
e=2.000 e=2.000
House
19700
of
Proposed
Proposal
St
Existing Sp
Sp
Extra
Radius:
Wi
age
Delta (Δ):
an (m)
ructure
de
G=-2.652
Nothing: 21
L=160.513m
:
Design Speed
nin
Proposed Span(m)
Design Chainage(m)
50
(V):
Design Chain (m) 1x1.2
0
1x1.0
(We)
19+746
PIPE CULVERT
IL-HIP
19720 395.603
Reconstruct
House
1x1.2
26253.842 Ls:
ERT
Ts:
19+746
e% :
-
65 Kmph
19+753.910
3.8
25
R
%
HIP Chainage 33.696 Lc: 38.642
e=3.800
e=3.800
19800
19760 394.060 394.517 0.719 394.685 395.404 Chainage=19764.613m
Level=395.281m
L=38.642m
Radius:
Easting:
House
Design Speed (V):
70
Extra Widening (We)
e=2.000
SABEESH
CD-60
30 Kmph
DRAWN
-
50
19+919.725
e%: 5.0%
L=61.945m
19840 392.880
780242.748 Lc: 19.001
393.072
1990
0
ed
DRAWING TITLE :
Sh
Shed
L=200.000m
R=14213.976m
House
19900 390.993 390.908 1.175 391.161 392.336
use
Ho
Shed
Shed
R
Shed
19920 390.741 390.962 1.126 390.883 392.010
DRAWING NUMBER:- ***/MU-BO/HIG/PP/21
SANDEEP
e=5.000
e=5.000
TO BHOKAR
CHECKED
Shed
19940 390.277 390.932 0.910 390.803 391.712
20
Valve
FROM KM-19+000 TO KM-20+000
00
0
390.659 Chainage=19964.613m
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)
NGK RAJU
APPROVED
e=2.000
Vertical 1:200
DATE
Horizontal 1:2000
REV : R-0
JUL- 2020
L=50.000m
DATE
JULY 2020
CURVE DE
2126 41
LEVEL DIFF.
R0
No
8.
15 33 07.9
48
TAIL-HIP
SUPERELEVATION
DESIGN CHAINAGE
@8M LHS FROM PCL
VERTICAL ALIGNMENT
FINISHED ROAD LEVEL
780242.748 Ls:
13 Ts:
-
HORIZONTAL ALIGNMENT
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
House
-
19+919.725
30 Kmph
50
e%: 5.0%
e=2.000
20000 389.970 390.009 0.920 390.025 390.944
HP
d
20020 389.772 389.678 0.913 389.783 390.695
She
199
00
Shed
L=50.000m
20040 389.509 389.211 0.787 389.659 390.446
House
FIRST SUBMISSION
House
TO MUDKHED
Shed
Shed
Bore
e=5.000
e=5.000
20080 388.512 388.176 1.179 388.770 389.948
L=63.597m
R=90.000m
Shed
Shed
Valve
Radius:
Easting:
200
G=-1.245
HIP Chainage :
L=271.774m
Design Speed (V):
90
BY
Extra Widening (We)
CURVE DETAIL-HIP
House Line
L=50.000m
Nothing: 2126534.030 Ls:
Delta (Δ): 40 29 13.089 Ts:
20100
Shed
House
CD-61
35 Kmph
-
Line
50
20+074.578
Bore
20160 387.702 387.073 1.485 387.468 388.952
e%: 5.0%
CLIENT :
780141.247 Lc: 63.597
L=100.000m
R=6479.219m
House
e=2.000
House
Chainage=20336.387m
Level=387.528m
20340 386.566 385.773 0.981 386.559 387.539
20300
L=356.740m
CONSULTANT :
e=2.000
House
Proposed Span(m)
House
Proposed
Design Chainage(m)
Design Ch
PIPE CULVERT
1x1.2
House
20+368
Reconstr
9
) 1x1.2
PIPE CU
20+368
20400
20440 386.521 385.615 1.329 386.508 387.838
uction
G=0.299
LVERT
L=208.098m
20460 386.419 385.983 1.484 386.414 387.897
Proposed Span(m)
Design Chainage(m)
PIPE CULVERT
Type of
Proposal
Existing
Proposed
1x1.2
Design Ch
PROJECT :
Nalla
Span (m
Structure
ainage
Span (m
Nal
la
20520 L 386.212 386.013 1.806 386.270 388.076
) 2x0.
9
) 1x1.2
Chainage=20544.485m
20500
Reconstru
Level=388.150m
ction
Radius:
Easting:
LVERT
Nothing: 21
e=3.700
e=3.700
House
e:
CURVE DE
26
L=58.093m
d (V):
05 42.052
HIP Chainag TAIL-HIP
-
House
L=120.000m
50 Kmph
R=-12964.367m
-
CD-62
House
e%: 3.7%
Lc: 58.093
20 700
House
L=452.784m
386.727
House Lin
e
DRAWING TITLE :
House
G=-0.627
L=408.116m
SANDEEP
House
TO BHOKAR
CHECKED
385.903
PLAN & PROFILE (MUDKHED-BHOKAR ROAD)
NGK RAJU
Shed
APPROVED
House
SCALE ON A2
Vertical 1:200
DATE
Horizontal 1:2000
REV : R-0
JUL- 2020
TO MUDKHED TO BHOKAR
21+055
ainage
Design Ch an (m) 1x1.2
os ed Sp 9
Prop ) 1x0.
Span (m PIPE CULV
ERT
Existing ct ure
Type of St
ru
co nstr uction
Re
Proposal
Shed
Rest House
Shed
Shed
House
House
House
Shed
House
House Line
Tem
Shed Shed
ple
Ota
Shed
21000
Shed
House
Shed
e
House Lin
20 900
Gate
Relvey
Relvey Gate
Chainage=21072.601m
Level=385.393m
PIPE CULVERT
Design Chainage(m) 21+055
Proposed Span(m) 1x1.2
385.598
385.472
385.393
385.849
385.247
384.568
385.899
384.996
0.476
0.351
LEVEL DIFF.
385.737
384.607
385.710
385.197
385.091
384.722
386.013
385.100
HORIZONTAL ALIGNMENT
VERTICAL ALIGNMENT
e=2.000
SUPERELEVATION
21072.601
DESIGN CHAINAGE
21000
21020
21040
21060