Professional Documents
Culture Documents
644
TOILET BEAM / SLAB HEIGHTS SHALL BE CONFIRMED
2021 AFTER DEMOLITION OF FALSE CEILING.
FC @ 24
815 PANELING OF WALL AND COLUMN ON
SITE.DIMENSION GIVEN ARE WITH EXISTING
400
STOCK PANELING.SO DIMENSIONS MAY VARY
1359
ROOM
00 MM LV
AFTER DEMOLITION OF PANELING ON SITE.
TR-2
809
FALSE CEILING LEGEND
L
372
TRAIL ROOM ,STOCK ROOM & TOILET LP
FC @ +2400 MM LVL TO 14
2099 BE FINISHED WITH MORNING GLORY - 0765
FC @ +2900 MM LVL TO BE LP
FINISHED WITH MORNING GLORY - 0765 14
2526
LP
FINISHED WITH GREY ACP OR PAINT 14
2558 (AD03-CHAMPAGNE SILVER-ALU DECOR)
PROPOSED SMOKE DETECTOR IN
FC @ 2900MM LVL CEILING 08
2656
OTHER PROPERTY LP WHITE LUSTER PAINT -MORNING
14 GLORY
AREA - 1080 sq.ft
MIR
FC @ 2900MM LVL
1855
1854
LP
ENTRY
AREA - 1164.4 sq.ft
+/- 00 MM
LVL
CARPET AREA - 1164.4 sq.ft
PARKING AREA
NOTE:
FFL TO FALSE CEILING BOTTOM +3050MM LVL
FFL TO GLASS DOOR HEIGHT +2440MM LVL
FFL TO TOILET DOOR HEIGHT +2065MM LVL
FFL TO ROLLING SHUTTER BOTTOM +3008MM LVL