Preheat Interpass Job Joint Speed Gas(Argon) By By Date Process WPS No. Electrode Size polarity current volt Temp Temp no. Detail Flow rate (Engineer (Head- (min) (max) Mm/min Lit/min - Welding) Production) Deg C Deg C
Note: The parameters for welding shall be as per applicable WPS and the same shall be verified by Engineer – Welding.