You are on page 1of 1

WORK ALLOCATION FOR WELDER

WELDER NAME: ID No.: WAW No. :

Travel Shielding Prepared Approved


Preheat Interpass
Job Joint Speed Gas(Argon) By By
Date Process WPS No. Electrode Size polarity current volt Temp Temp
no. Detail Flow rate (Engineer (Head-
(min) (max)
Mm/min Lit/min - Welding) Production)
Deg C Deg C

Note:
The parameters for welding shall be as per applicable WPS and the same shall be verified by Engineer – Welding.

AI/U-17/R03

You might also like