You are on page 1of 1

16 15 14 13 12 11 10 9 8 7 6 5

5 4 3 2 1
03 0-CIV-00014

000

000

000
500
000

500

500

500

500

500
DRG. NO.
REV

20.

50.

80.
10.
0.

X + 123.

X + 128.

X + 142.

X + 144.

X + 146.
NOTES :
PP1

X +

X +

X +

X +

X +
Y + 0.000 PROPERTY LINE 1. ALL PLUMBING WORKS SHALL BE IN ACCORDANCE WITH UNIFORM PLUMBING CODE.

NE
GATE GATE

PROPERTY LI
M 2. PIPING MATERIALS SHALL BE PVC SCH. 40 M
Y + 3.800
Y + 5.000
N 3. ALL PIPE SIZES SHOWN ARE NOMINAL INSIDE DIAMETER IN MILLIMETER.

4. ALL PIPE INVERT LEVELS SHOWN ARE FOR GUIDANCE ONLY. CONTRACTOR TO
ESTABLISH THE MOST APPROPIATE PIPE INVERT LEVELS ON SITE.
FIRE WATER TANK
PUMP HOUSE 5. ALL COORDINATES AND PIPE LEVELS ARE IN METER, UNLESS OTHERWISE NOTED.
(EXISTING)

6. FOR HOLDING TANK SIZE, SEE DRAWING NO. 0-CIV-00015.

Y + 17.000
6. THE INVERT LEVEL AT THE CONNECTION OF PROPOSED SEWER LINE TO THE
Y + 19.000 TANK-2
TANK-3 TANK-1 EXISTING MANHOLE SHALL BE AS PER SITE CONDITION.

L L

Y + 27.000

EXISTING SEWER LINE


Y + 34.000 FUEL TANK AREA
(TYPICAL)
(EXISTING)

EXISTING MANHOLE

185
(TYPICAL)

X + 146.
FIRE DIVISION
K BUILDING K

Y + 49.000
TANK-4 TANK-5
BOP=99.153

GCO
BOP=99.026

Y + 55.750
BOP=99.000
Y + 57.000

BOP=99.174

Y + 61.950 GCO
Y + 63.000
Y + 63.800
BOP=99.067
J J

900

500
BOP=99.200

X + 134.

X + 135.
GATE

Y + 72.800
ACCESS ROAD
NTEREST OF THE COM PANY

BOP=98.850
LEGEND :
H H
BOP=98.824
WORKSHOP
CO.

Y + 85.650
BUILDING
BOP=98.812 - EXISTING MANHOLE
NATIONAL CONTRACTING

BOP=98.786
THE I

Y + 89.450 - EXISTING SEWER LINE


BOP=98.773
M ENTAL TO

Y + 93.400
BOP=98.747 - WASTE PIPE
Y + 94.450
ANY W AY DETRI

BOP=98.737 - WASTE PIPE IN CONCRETE ENCASEMENT


COOLERS AREA
S THE PROPERTY OF

ACCESS ROAD
BOP=98.763 GCO - GROUND CLEANOUT
G G
N
RECTLY I

ACCESS ROAD

ACCESS ROAD
BOP - BOTTOM OF PIPE
NDI
THE DOCUM ENT I
RECTLY OR I

Y +113.000
T M UST NOT BE USED DI
ON

Y +118.000
ON
NFORM ATI

F F
DIESEL GENERATION AREA
THE I

(EXISTING)
I

DG DG DG DG DG DG

Y +138.000

ACCESS ROAD
Y +139.000

E CONTROL ROOM E

Y +146.200

132 KV. SUBSTATION


TRANSFORMER AREA (EXISTING)

D D

ACCESS ROAD
TRANSFORM ER AREA

AS-BUILT
C C

CO.
TABOUK ELECTRICITY COMPANY

TAB

ITY
O

IC
U
K R
ELECT
ACCESS ROAD

PROJECT:
GT GT GAS TURBINE AREA GT GT
TABOUK II POWER PLANT EXPANSION
(EXISTING)
UNIT NO.6
NE

CONTRACT NO. 4GT SP16


PROPERTY LI

CONTRACTOR:
B B
NATIONAL CONTRACTING CO.LTD.

(POWER PROJECTS DIVISION)


GUARD HOUSE P.O.BOX-90, AL-KHOBAR 31952
Y +210.000 (EXISTING)
REV. DATE ALTERED OMS KINGDOM OF SAUDI ARABIA
03 08/99 CHECKED MFB

AL HAMDAN
CONSULTING OFFICE
AS-BUILT
P.O.BOX 2474
Alkhobar 31952
EXISTING NEW NEW Saudi Arabia
SEPTIC SOAK SOAK Tel. 8983641/8943981
ACCESS ROAD TANK PIT PIT Licence No. 447

PROPERTY LINE ALTERED JKM ALTERED JKM DESIGNED BY: RRG DRAWING TITLE
Y +225.000 REV. DATE REV. DATE
A DOCUMENT STATUS A
02 10/98 CHECKED RRG 01 08/98 CHECKED RRG DRAWN BY: JKM SITE DEVELOPMENT - PP1
FOR INFORMATION SANITARY WASTE WATER SYSTEM LAYOUT
500
000

MAIN ENTRANCE
000

CHECKED BY:
FOR APPROVAL
X + 146.

(EXISTING) ISSUED FOR CONSTRUCTION ISSUED FOR APPROVAL


X + 114.
00.

TEC COMMENTS INCORPORATED APPROVED BY:


FOR CONSTRUCTION
DRAWING NUMBER REV SHEET No.
DATE: 03/98
FOR FABRICATION
X

SCALE: 1 :300 0 - C I V - 0 0 0 1 4 03 1 OF 1

16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

You might also like