Professional Documents
Culture Documents
HP
Exam HP5-K03D
Delta - Supporting and Servicing HP 3PAR StoreServ Solutions
Version: 6.0
[ Total Questions: 30 ]
HP HP5-K03D : Practice Test
Question No : 1
You are installing an HP 3PAR StoreServ 7200 with an additional M6720 drive enclosure.
Where should you install four LFF NL disks and four LFF SSDs in the new enclosure for a
supported configuration'?
A. SSD drives in Slot 0, 4, 8, and 12; NL drives in Slot 16, 20, 1, and 5
B. SSD drives in Slot 0, 4, 8, and 12; NL drives in Slot 3, 7, 11, and 15
C. NL drives in Slot 0, 1, 2, and 3; SSD drives in Slot 4, 5, 6, and 7
D. NL drives in Slot 0, 3, 20, and 23; SSD drives in Slot 4, 16, 7, and 19
Answer: B
Explanation:
LFF drives must be loaded in pairs of identical drives starting at the bottom of a column,
leaving no empty slots between drives in the column. Columns of drives in the M6720
enclosure must be of the same type (SSD or NL) and, for HDDs, the same rotational
speed. Drives of differenttypes may not be mixed in a single column. It is permitted to have
empty columns between columns containing drives. Different columns do not have to
contain the same number of drives
Question No : 2
A customer has tested an HP 3PAR StoreServ 7000 in a try-and-buy scenario and now
wants to buy the system. During the initial setup, the customer decides against a
connection to HP 3PAR Central. The customer wants you to enable the connection in
A. 20 (FTP)
B. 161 (SNMP)
C. 389 (LDAP)
D. 443 (HTTPS)
Answer: B
Question No : 3
What is the procedure change when you use HP 3PAR SmartStart during an HP 3PAR
StoreServ 7000 installation?
Answer: C
Question No : 4
Your customer has a two-node HP 3PAR StoreServ 7400 with two additional drive shelves.
They have just purchased an additional 16 SFF drives. What must the customer do when
adding the drives to the enclosures'?
Answer: D
A customer has two HP 3PAR T800 systems with Inform OS v2.3.1 in two separate
locations Data is being replicated between systems using Remote Copy. The customer
wants you to develop a plan for upgrading the environment to the HP 3PAR OS v3.12.
A. All participating systems must be upgraded to the same major OS within 5 weeks.
B. It is not necessary to stop the Remote Copy groups for online updates.
C. Downtime must be scheduled because you cannot upgrade online from v2.3 1 to v3.1 2
directly.
D. Necessary updates to the hosts as required in the Interoperability Matrix can be installed
after the Inform OS update.
Answer: C
Question No : 6
Answer: B,E
Reference:http://bizsupport2.austin.hp.com/bc/docs/support/SupportManual/c03607506/c0
3607506.pdf(see page 53, troubleshooting storage system setup)
Question No : 7
You support a leading provider with two new HP 3PAR StoreServ 7200 systems. Which
A. The DP1 of the HP 3PAR StoreServ 7200 is limited to three expansion drive enclosures.
B. The disk drives in the node enclosure are connected internally through DP2.
C. The combined total node and drive enclosure for the HP 3PAR StoreServ 7200 is nine
D. The DP2 of the HP 3PAR StoreServ 7200 is limited to three expansion drive enclosures.
E. The minimum addition to a two-node system without expansion drive enclosures is two
identical disk drives.
Answer: B,D
Reference:http://vmfocus.com/2013/03/18/3par-storeserv-7000-hardware-part-3/(see driver
enclosure expansion)
Question No : 8
Your customer has an HP 3PAR StoreServ 7200 with an all-SSD configuration. They have
a requirement for a second tier of higher capacity 300GB 15K drives You need to add the
new FC class drives. What is the minimum number of disks you should include in your
solution?
A. 2
B. 4
C. 6
D. 8
Answer: D
Question No : 9
You are performing an upgrade for a customer who has an HP 3PAR StoreServ 7400 with
two nodes. The upgrade must fulfill the customer's following needs
What should you verify before and during the upgrade? (Select two.)
Answer: D,E
Question No : 10
Youare creating a CPG and want to ensure that the HA Cage is available with RAID 5.
Which best practice should you follow to achieve this goal?
Answer: B
Reference:http://h20195.www2.hp.com/V2/GetPDF.aspx%2F4AA4-4524ENW.pdf(page 20)
Question No : 11
Your customer is running HP Inform OS version 3.1.2 on their HP 3PAR StoreServ 7400.
To ensure there is no loss of access to the LUNs during an upgrade, they want to utilize the
NPIV feature. How can the customer accomplish this?
Answer: A
Question No : 12
Your customer has an existing HP 3PAR F400 array with two controller nodes and eight
DC3 disk enclosures Each DC3 disk enclosure is fully populated with 300GB 15k disk
drives.
The customer has purchased a new HP 3PAR StoreServ 7400 two-node system with five
additional drive enclosures to be installed in a second data center. This system is fully
populated with 450GB 10k drives. Data will be migrated from the F400 to the 7400 by using
Remote Copy Fibre Channel (RCFC). The 7400 will then become the primary system, but
data will continue to be replicated between the systems. Additionally, the customer has
ordered extra 8GB/S FC adapters for the new 7400.
What is the maximum number of configurable host ports on the new HP StoreServ 7400
array in the customer environment?
A. 4
B. 8
C. 10
D. 12
Answer: D
Question No : 13
You are installing an HP 3PAR StoreServ 7000 for your customer. They want to deploy a
physical Service Processor. When setting the Global LAN IP address via ETH0, which user
account is required to log in to the Service Processor?
A. setupusr
B. 3paradm
C. spmamt
D. hpservice
Question No : 14
Your customer has recently purchased an HP 3PAR StoreServ 7200 with two additional
disk enclosures. Each disk enclosure contains 24 disks. Their business requirement
stipulates that no data can be lost, even if an entire disk enclosure fails. You recommend
that they use HA Cage for their CPG availability.
When creating the CPGs,which RAID levels should you configure to meet the customer
requirement (Select two.)
A. RAID 1
B. RAID 5 (3+1)
C. RAID 5 (4+1)
D. RAID 6 (3+2)
E. RAID 6 (4+2)
Answer: B,C
Question No : 15
Your customer has an existing HP 3PAR F400 array with two controller nodes and eight
DC3 disk enclosures. Each DC3 disk enclosure is fully populated with 300GB 15k disk
drives.
The customer has purchased a new HP 3PAR StoreServ 7400 two-node system with five
additional drive enclosures to be installed in a second data center. This system is fully
populated with 450GB 10k drives Data will be migrated from the F400 to the 7400 by using
Remote Copy Fibre Channel (RCFC). The 7400 will then become the primary system, but
data will continue to be replicated between the systems. Additionally, the customer
hasordered extra 8GB/sFC adapters for the new 7400.
During the installation you record these serial numbers for the new HP 3PAR StoreServ
system:
A. SP0001628580
B. SP32439658
C. 1628580
D. 00032439658
Answer: A
Reference:http://bizsupport2.austin.hp.com/bc/docs/support/SupportManual/c03603825/c0
3603825.pdf(page 7, second bullet)
Question No : 16
Answer: B
Question No : 17
When replacing a defective disk drive in an HP 3PAR StoreServ system, which additional
task should you perform?
Question No : 18
Beginning with the 3PAR Inform OS v 3.1.2, which license is no longer required for
autonomic system rebalancing after adding new resources?
Answer: C
Question No : 19
You are designing a three-site solution for a customer. Two of the sites will have an HP
3PAR StoreServ 7400, and the remaining site willhave an HP 3PAR StoreServ
7200.Additionally, the solution must adhere to the following requirements:
Which HP 3PAR Remote Copy Software configuration rule will affect the design of the
solution?
Answer: B
Question No : 20
Answer: D
Reference:http://bizsupport2.austin.hp.com/bc/docs/support/SupportManual/c03606526/c0
3606526.pdf(page 8, see the paragraph right after Note)
Question No : 21
Answer: A,C
Question No : 22
A customer has an existing c70fJ0 enclosure, with 6 blades and FlexFabric modules. You
What would be the most cost-effective method for adding a new 3PAR storage?
Answer: A
Question No : 23
You have changed the sparing algorithm that distributes the chunklets on an HP 3PAR
StoreServ system. After adding new disks to the system, you discover that the new sparing
algorithm applies only to the newly-addeddisks. You need to ensure that the new sparing
algorithm is applied to the existing disks.Which command should you execute to achieve
this goal?
A. tunesys -chunkpct
B. adrtithv
C. checlchealth -detail
D. adxitpd
Answer: A
Question No : 24
You need to check the health of all hardware and software components of an HP 3PAR
StoreServ system, and you need to obtain information about service-related issues. Which
single CLI command can you use to achieve both of these goals?
A. checkhealth -all
B. checkhealth -list
C. checkhealth -quiet
Answer: B
Reference:http://h20000.www2.hp.com/bizsupport/TechSupport/Document.jsp?objectID=c
03610832&lang=en&cc=us&taskId=&prodSeriesId=5335712&prodTypeId=12169
Question No : 25
Your customer plans to build a two-tier architecture with one HP 3PAR StoreServ 7400.
Layer 1 should be the SSD Tier, and Layer 2 should be the Fast Class Tier. After the
SmartStart configuration is complete, the customer connects to the system through the
InformOS Management Console. Which default CPGs are created during the process of
initializing the storage system?
Answer: A
Question No : 26
Your customer has an HP 3PAR StoreServ 7200 and requires additional high capacity
storage for an archiving project. The initial requirement is for 10TB. When installing drives
into the new LFF enclosure, which best practice must you adhere to?
A. Start at the bottom of a column and leave no empty slots between drives.
B. Populate all bays to ensure a balanced storage shelf.
C. Start in the top left bay and populate all disk bays from left to right.
D. Add disks in blocks of four disks at a time.
Answer: A
Question No : 27
"A Composite Solution With Just One Click" - Certification Guaranteed 13
HP HP5-K03D : Practice Test
A customer has three HP 3PAR StoreServ 10000 systems in different sites on their
metropolitan campus The FC-based SANs within the different sites consist of B-series 8
Gbps switches with an active port-based zoning.Between the sites, there is a 10 Gbps
Ethernet connection.
A. N-to-1 Configuration
B. Synchronous Long Distance Configuration
C. Unidirectional 1-to-1 Configuration
D. 1-to-N Configuration
Answer: D
Question No : 28
You are installing a two-node HP 3PAR StoreServ 7400. Which action is a best practice
that you should perform to ensure a successful installation?
Answer: A
Question No : 29
Which statements are true about the HP 3PAR StoreServ 7000? (Select two.)
Answer: B,C
Question No : 30
A customer has a department with sensitive data stored on an HP 3PAR StoreServ T-class
system. The customer wants to migrate all of the data to a new HP 3PAR StoreServ 7400
and then repurpose the old system in a different department. The customer is concerned
about the possibility of sensitive data being disclosed. Which action will remove the
sensitive data?
Answer: C
Reference:http://h20195.www2.hp.com/v2/GetPDF.aspx%2F4AA4-3999ENW.pdf(page 11,
third paragraph)