Professional Documents
Culture Documents
i. Lighting
Energy efficiency LED light fittings will be used to fulfill the general lighting requirement of
entire building. The LED fittings will be best quality with minimum 2 years’ warrantee. The
board room lights will be used as per requirements and the quality will be approved by the
Engineer. All the light fittings and switches will be clearly numbered not to be affected to the
appearance. However, it will take every step to gain maximum natural light in to the building
during the day time.
ii. Ventilation
Air conditioning will be used for all enclosed spaces if not specified, and natural ventilation
will be used for cafeteria, lobbies, reception, corridors, wash rooms store rooms and
staircases. The contractor recommended to use Central cooling air conditioning system or
VRV/VRF system for air conditioning and individual split type air conditioners where
necessary. The make and quality shall be approved by the Engineer. Air curtain will be used
at the doors of often opened sections and all the doors shall be consist of door closures. All
the lecture halls should consist of natural ventilation provisions in case of shut down of air
conditioning system.
ICC provide Air Conditioning all enclosed spaces other than Janitorial rooms, Record rooms,
pump room, lobbies, reception, corridors, wash rooms store rooms, staircases, and audio
and video LAB in semi basement (newly added area).
ICC use VRV type air conditioning system and split type air condition system for individual
operation areas.
ICC dose not introduce air curtain (No requirement of air curtains)
ICC provide openable windows for all lecture halls to provide natural ventilation provision
Electrical power installation will be done in accordance with IEE and CEB regulations to
establish all the safety requirements. ICC will install a 500 KVA LECO transformer and a
500KVA diesel generator with all the service lines as per the power requirement of the
building. Transformer room and generator room are included in the proposal under the
area for service provisions.
Public areas of the building will be secured with HD 1080p high quality night vision CCTV
camera system with required DVR, display, minimum 28 days’ storage and battery backup.
ICC will provide a monitoring/control for CCTV system of the building. The make and quality
of CCTV system will be approved by the Engineer.
v. Water Supply
Water sump and overhead tanks with adequate capacity should be provided and the
contractor should connect the sump to the water board mains adjacent to the site with
automatic pumping system.
Water calculation
Total Storage (for domestic purpose) 171 m3 (more than two-day demand)
ICC connect the sump to the water board mains adjacent to the site with automatic pumping
system to overhead tank.
The building should be provided with adequate sewer and waste water disposal system in
order to uninterrupted smooth functioning.
Hydraulic Load
All the firefighting and fire protecting facilities should be provided including water sump with
required capacity, hose reels, and portable carbon dioxide, water apparatus, fire and smoke
detectors and sprinklers, etc. all as per the regulations of Fire Service Department of the
Colombo Municipal Council.
ICC design Firefighting and fire protection system according to guide line of Fire Service
Department of the Colombo Municipal Council.
It is proposed a location for network racks and provisions will be kept with 3 nos of 6” dia
PVC pipes from the boundary of the site to the rack location for laying of optical cables. Only
the conduiting will be done for data, telephone and TV systems.
All the precautions will be taken and systems will be installed for lightning and surge
protection of the building according to standards.
Level II Lightning Protection System is proposed for the entire building under BS 62305
standard.
Class I surge arrester is included in the Main Distribution Board (MSB), while the Floor
Distribution Boards (FDBs) are equipped with Class II surge arresters.
Aircraft warning light for the building will be provided as per the standards and regulations.
Lift shall be provided with adequate number and capacity as per the standard regulations for
vertical trance potation of the building. Minimum number of passenger lift shall be 02 nos
and the designers are encourage to provide observation lifts for the appearance and safety
purposes. The lift shall be Western or Japan make and the manufacturer should have at least
25 year experience in manufacturing lift or escalators.
ICC provide 2 number of 17 passenger lifts.
Mono/poly crystalline solar panels will be install on the roof of the building to cover at least
60% of the building plot coverage. Solar panels and inverters will comprise of 25 years and
10 years’ warrantees. The package will include all the cabling work, display panels, remote
monitoring system and the connection to the CEB grid. ICC will bear all the documentary and
connection charges to CEB. The products and quality will be approved by the Engineer.
CO2 level inside the building shall be measured and observed by CO 2 meters and the
contractor supposed to fix at least one meter at each floor.
ICC is supposed to use self-sensitive control system for electrical lighting control to minimize
the electrical utilization in particular areas where the adequate sunlight is available or the
space is not occupied. This system will be applied for corridors, lecture halls, wash rooms.
xvi. Landscaping
Landscaping of the building shall ensure the green cover of the surround and the designer is
advised to use endemic plants as the compatibility with the environment. And also
introduction of water source will be value added to the building while increasing the
atmospheric humidity. The designer may use special feature of landscaping to offer an
ancient and great historical appearance to the building.
xvii. Furniture