Professional Documents
Culture Documents
01P a g e
Monthly Progress Report – December’2020
TABLE OF CONTENTS
Chapter Content Page No.
Chapter 1 The Project 03
1.1 Project Details 03
1.1.1 Project Highway Map 03
1.1.2 Salient Features 04
1.1.3 Major Project Facilities 04
Chapter 2 The Concessionaire 05
2.1 Scope of Work 05
2.1.1 Operation Management 05
2.1.2 Maintenance Management 05
2.1.2.1 Highway Maintenance 05
2.1.2.2 Incident Management 05
2.1.2.3 Environment Management 05
2.2 Concessionaire Team and Contacts 06
2.3 Provision for User Services 07
2.3.1 Ambulance 07
2.3.2 Route Patrol Vehicle 07
2.3.3 Crane 07
2.3.4 Highway Emergency Contact Information 08
2.4 Establishment Contact Details 08
Chapter 3 Toll Operation Management 09
3.1 User Fee Details 09
3.2 Monthly User Fee Collection Data 10
3.2.1 Single Journey Traffic 10
3.2.2 Return Journey Traffic 11
3.2.3 Single Journey for commercial vehicles registered within plaza district 12
3.2.4 Monthly pass for 50 single journeys in a month 12
3.2.5 Monthly pass for local personal (Non-Commercial) 13
3.2.6 Single, Return & Local RFID Journeys 14
3.3 Traffic Data & PCUs 15
3.4 Forced Exemption Vehicles
16
1|P a g e
Monthly Progress Report – December’2020
Chapter Content Page No.
5.1.1 Ambulance Services 21
5.1.2 Crane Services 21
5.1.3 Route Patrol Services 21
5.1.4 Highway Helpline 21
5.1.5 Incident Management Photos 22-24
5.1.6 Accident Statistics 25-26
5.1.7 Cumulative Accident Statement for the current month 27
Chapter 6 Road User Complaints 28
6.1 User Complaints-1033 Helpline 28
6.2 User Complaints registered at plaza 29-31
2|P a g e
Monthly Progress Report – December’2020
Madurai to Kanyakumari Section is a full-access controlled highway that interconnects Major National
Highways around Madurai-Kanyakumari, covering a distance of 243.170 Kms from Samayanallur via Tirunelveli and it
ends at Kanyakumari on NH-44 (Old NH-7). Constructed as part of the National Highway Development Project to
decongest the city of transiting vehicles, the highway interconnects NH-49E, NH-45 and NH-7A and it covers five Districts
Madurai, Virudhunagar, Tuticorin, Tirunelveli and Kanyakumari.
Madurai to Kanyakumari highway section is a part of National Highway No. 44 (Old NH 7) in the State of Tamilnadu. It is
one of the Projects comprising of 9 National Highway stretches (Bundle-3) on Toll Operate Transfer (TOT) Mode.
The Site of the four lane divided Project Highway starts at Km.116+500 of NH-44 (Old NH 7) and ends at Km.180+000 of
NH-44 (Old NH 7) in the State of Tamil Nadu. Having a user fee toll plaza at Km.125+780. The total length of Project
Highway is 63.5 Kms. This project will be for Toll, Operation, Maintenance and Transfer from Km.116+500 to Km.180+000.
3|P a g e
Monthly Progress Report – December’2020
1.1.2 Salient Features
8 Underpasses 16 nos.
4|P a g e
Monthly Progress Report – December’2020
5|P a g e
Monthly Progress Report – December’2020
6|P a g e
Monthly Progress Report – December’2020
Paramedic
Force Ambulance - TN 01 AW 2174 Ambulance Driver 20th Oct 2020
Ambulance Helper
Date of mobilization of
Vehicle Type and Reg. No. Staff Deployed per Shift
Vehicle
Date of mobilization of
Vehicle Type and Reg. No. Staff Deployed per Shift
Vehicle
7|P a g e
Monthly Progress Report – December’2020
2.3.4 Highway Emergency Contact Information (From Km.100.000 to km.150.000)
8|P a g e
Monthly Progress Report – December’2020
Car, Jeep, Van or Light Motor Vehicle 100 150 3295 50 275
9|P a g e
Monthly Progress Report – December’2020
Oversized Vehicles (seven or more
640 960 21280 320 NA
axles)
10 | P a g e
Monthly Progress Report – December’2020
For corresponding For preceding month - Nov'20 For current month - Dec'20
month of Previous Year ( 01.11.20 to 30.11.20) ( 01.12.20 to 31.12.20)
Vehicle Type
Fees Fees
No. of No. of Fees Collected Fees per No. of
Collected Collected
Vehicles Vehicles (Rs.) Vehicle (Rs.) Vehicles
(Rs.) (Rs.)
Car, Jeep, Van or Light Motor Vehicle 36251 5437650 0 0 100 0 0
LCV/LGV/Mini Bus 10117 2428080 0 0 160 0 0
Truck (Two Axle) 8557 4278500 0 0 335 0 0
Bus (Two Axle) - 0 0 0 335 0 0
Three axle commercial vehicle 1074 585330 0 0 365 0 0
HCM/EME/MAV (four to six axles) 1597 1253645 0 0 525 0 0
Oversized Vehicles (seven or more axles) 0 0 0 0 640 0 0
Gross Total 57596 13983205 0 0 0 0
Single Journey for commercial vehicles registered within the plaza district
3.2.3
For corresponding For preceding month - Nov'20 For current month - Dec'20
month of Previous Year ( 01.11.20 to 30.11.20) ( 01.12.20 to 31.12.20)
Vehicle Type Fees Fees
No of Fees Collected Fees per No. of
Collected No of Vehicles Collected
Vehicles (Rs.) Vehicle (Rs.) Vehicles
(Rs.) (Rs.)
11 | P a g e
Monthly Progress Report – December’2020
Car, Jeep, Van or Light Motor Vehicle 3791 220722 0 0 100 0 0
LCV/LGV/Mini Bus 4174 333920 0 0 160 0 0
Truck (Two Axle) 2420 399300 0 0 335 0 0
Bus (Two Axle) 0 0 0 0 335 0 0
Three axle commercial vehicle 706 127080 0 0 365 0 0
HCM/EME/MAV (four to six axles) 482 125320 0 0 525 0 0
Oversized Vehicles (seven or more axles) 0 0 0 0 640 0 0
Gross Total 11573 1206342 0 0 0 0
For corresponding For preceding month - Nov'20 For current month - Dec'20
month of Previous Year ( 01.11.20 to 30.11.20) ( 01.12.20 to 31.12.20)
Vehicle Type
Fees Fees
No. of Fees Collected Fees per Pass
Collected No. of Passes No. of Passes Collected
Passes (Rs.) (Rs.)
(Rs.) (Rs.)
Car, Jeep, Van or Light Motor Vehicle 9 29655 2 6590 3295 2 6590
LCV/LGV/Mini Bus 0 0 0 0 5320 0 0
Truck (Two Axle) 4 39152 0 0 11145 0 0
Bus (Two Axle) 0 0 0 0 11145 158 1763189
Three axle commercial vehicle 0 0 0 0 12160 0 0
HCM/EME/MAV (four to six axles) 0 0 0 0 17480 0 0
Oversized Vehicles (seven or more axles) 0 0 0 0 21280 0 0
Gross Total 13 68807 2 6590 160 1769779
12 | P a g e
Monthly Progress Report – December’2020
For corresponding For preceding month - Nov'20 For current month - Dec'20
month of Previous Year ( 01.11.20 to 30.11.20) ( 01.12.20 to 31.12.20)
Vehicle Type
Fees Fees
No. of Fees Collected Fees per Pass
Collected No. of Passes No. of Passes Collected
Passes (Rs.) (Rs.)
(Rs.) (Rs.)
Car, Jeep, Van or Light Motor Vehicle 57 15753 193 53075 275 177 48675
LCV/LGV/Mini Bus
Truck (Two Axle)
Bus (Two Axle)
NA
Three axle commercial vehicle
HCM/EME/MAV (four to six axles)
Oversized Vehicles (seven or more axles)
Gross Total 57 15753 193 53075 275 177 48675
13 | P a g e
Monthly Progress Report – December’2020
For corresponding month For preceding month - Nov'20 For current month - Dec'20
of Previous Year ( 01.11.20 to 30.11.20) ( 01.12.20 to 31.12.20)
Vehicle Type
Fees Fees
No of Fees Collected No. of
Collected No of Vehicles Collected
Vehicles (Rs.) Vehicles
(Rs.) (Rs.)
Car, Jeep, Van or Light Motor Vehicle 98911 11888142 207723 19334365 211144 19614815
LCV/LGV/Mini Bus 27681 4904400 21553 3051440 23909 3373840
Truck (Two Axle) 20915 8044842 8232 2231400 19001 5315235
Bus (Two Axle) 0 0 17709 4951105 10587 4608004
Three axle commercial vehicle 9340 3471810 7364 2445510 8091 2717155
HCM/EME/MAV (four to six axles) 10240 5663490 12306 5891960 14261 6827440
Oversized Vehicles (seven or more axles) 94 60160 75 43520 102 57280
Gross Total 167181 34032844 274962 37949300 287095 42513769
14 | P a g e
Monthly Progress Report – December’2020
For corresponding month of For preceding month - Nov'20 For current month - Dec'20
Previous Year ( 01.11.20 to 30.11.20) ( 01.12.20 to 31.12.20)
PCU
Vehicle Type
Factor
No. of Vehicles PCUs No. of Vehicles PCUs No. of Vehicles PCUs
Car, Jeep, Van or Light Motor Vehicle 1 0 0 234757 234757 237813 237813
LCV/LGV/Mini Bus 1.5 0 0 22159 33239 24747 37121
Truck (two Axle) 3 0 0 22749 68247 21167 63501
Bus (two Axle) 3 0 0 19481 58443 24529 73587
Three axle commercial vehicle 3 0 0 8777 26331 9901 29703
HCM/EME/MAV (four to six axles) 4.5 0 0 12554 56493 14585 65633
Oversized Vehicles (seven or more
4.5 0 0 80 360 107 482
axles)
15 | P a g e
Monthly Progress Report – December’2020
3- Total
Vehicle Type Car LCV Bus Truck HCM/EME/MAV OSV
Axle Traffic
16 | P a g e
Monthly Progress Report – December’2020
The details of maintenance activities undertaken for smooth and safe operations of the Project Highway during the
month are tabulated below:
17 | P a g e
Monthly Progress Report – December’2020
08-Dec-20 1.RE Wall unwanted plants cutting work and median juliflora cutting
work at 140+250RHS,
2.Shoulder bushes and unwanted plants cleaning work at 161+200RHS
3.Shoulder bushes and avenue unwanted plants cleaning work at
178+630RHS
10-Dec-20 1.RE Wall unwanted plants cutting, median juliflora and unwanted
plants cutting work at 140+300LHS,
2.Median grass cutting work at 163+000,
3.Shoulder bushes and unwanted plants cleaning and MCW cleaning
work at 160+900BHS
4.Shoulder bushes and avenue unwanted plants cleaning and MCW
cleaning work at 178+730RHS
11-Dec-20 1.Median chute drain cleaning work and main carriage way soil cleaning
work at 160+800BHS,
2.RE Wall unwanted plants cutting, Median juliflora and unwanted
plants cutting at 140+200RHS,
3.Pot rectification work from 125+000 to 125+500LHS,
4.Median grass cutting work at 159+000,
5.Pathway and kerb shyness soil cleaning at 142+230RHS.
18 | P a g e
Monthly Progress Report – December’2020
19 | P a g e
Monthly Progress Report – December’2020
20 | P a g e
Monthly Progress Report – December’2020
21 | P a g e
Monthly Progress Report – December’2020
22 | P a g e
Monthly Progress Report – December’2020
23 | P a g e
Monthly Progress Report – December’2020
24 | P a g e
Monthly Progress Report – December’2020
Responsible
Animals killed
Vehicle
Road Feature
Classification
Intersection
Non Injured
of Accident
Condition
Condition
Nature of
Grievous
type and
Accident
Accident
Weather
Accident
Location
Time of
control
Causes
Minor
No. of
Help provided by Ambulance/ RPV/ Crane
if any
Sr.
Road
Fatal
Date
No.
PATROL / AMBULANCE
Car A Speedy car driver proceeding towards Kanyakumari at LHS
11.37 118+900
1 10.12.2020 4 2 2 4 4 - 1 /Jeep/Van/ 0 1 1 6 0 slow track, Hit behind the motorcyclist who crossing carelessly
AM Meithalaiyanpatti
Taxi from service road to main carriageway. In this accident the
motorcyclist and pillion got Injured.
PATROL / 108 AMBULANCE
Motorized
20.35 142+600 A speedy motorcyclist proceeding towards Madurai at RHS slow
2 16.12.2020 3 2 2 4 4 - 1 two- 0 1 0 0 0
PM Thalayathu track hit by an unknown vehicle. In this accident the
wheeler
motorcyclist got injured.
PATROL / 108 AMBULANCE
Car A speedy car driver proceeding towards Kanyakumari at LHS
04.12 117+200
3 23.12.2020 4 3 2 4 4 - 1 /Jeep/Van/ 0 0 1 0 0 fast track hit on motorcyclist who crossed the road carelessly
PM Velliseri
Taxi from RHS to LHS at Vellisery junction. In this accident the
motorcyclist got injured.
PATROL / AMBULANCE / CRANE
A speedy Eitcher van driver proceeding towards Madurai at RHS
fast track, unfortunately the vehicle tyre burst. Due to this the
02.20 113+400
4 27.12.2020 1 2 2 4 4 - 1 Truck/Lorry 0 2 0 3 0 van driver lost control and hit on the centre median. Two
PM Idaiseval
occupant sit above the eitcher van jumped from the eitcher van
in that one occupant hit on center median got grevious injured
while boarding to the hospital he was died.
PATROL
08.15 133+000
5 28.12.2020 3 3 2 4 4 - 1 Truck/Lorry 0 0 2 0 0 A speedy car driver proceeding towards Kanyakumari at LHS
AM Arasankulam
slow track hit behind the witcher van, who also proceeding
25 | P a g e
Monthly Progress Report – December’2020
Responsible
Animals killed
Vehicle
Road Feature
Classification
Intersection
Non Injured
of Accident
Condition
Condition
Nature of
Grievous
type and
Accident
Accident
Weather
Accident
Location
Time of
control
Causes
Minor
No. of
Help provided by Ambulance/ RPV/ Crane
if any
Sr.
Road
Fatal
Date
No.
26 | P a g e
Monthly Progress Report – December’2020
1 Fatal 00 00 00 00 00 00
2 Grievous Injury 02 04 03 04 06 10
3 Minor Injury 02 01 02 04 06 05
4 Non-Injured 02 04 02 09 05 10
27 | P a g e
Monthly Progress Report – December’2020
Summary of Road User complaints received and attended during the month of December '2020 - Package – 7
Complainant’s
Sr. Complaint Complaint Resolved Solution
Complaint Sr. No Vehicle No Contact No. Complaint description Remarks
No Date Time on explained
(if any)
we will work on
SMTL/O&M/TCR/CB- White Paint Marking not visible the same & it
1 05.12.2020 12:52 PM TN66K1342 9543389728
01 properly will rectified
soon
The Road is poor maintenance we will work on
SMTL/O&M/TCR/CB- & Fall of Pot Holes/After the the same & it
2 06.12.2020 1:45 PM TN72BH4937 943286474
02 Rain it is very difficult to will rectified
drive. soon
29 | P a g e
Monthly Progress Report – December’2020
30 | P a g e
Monthly Progress Report – December’2020
31 | P a g e
Monthly Progress Report – December’2020
NIL
32 | P a g e
Monthly Progress Report – December’2020
Juliflora and unwanted plants cutting work at stone pitching area on VUP-160+100LHS
33 | P a g e
Monthly Progress Report – December’2020
34 | P a g e
Monthly Progress Report – December’2020
Before RE wall unwanted plants and median juliflora cutting work at 140+300RHS
After RE wall unwanted plants and median juliflora cutting work at 140+300RHS
35 | P a g e
Monthly Progress Report – December’2020
36 | P a g e
Monthly Progress Report – December’2020
37 | P a g e
Monthly Progress Report – December’2020
38 | P a g e
Monthly Progress Report – December’2020
39 | P a g e
Monthly Progress Report – December’2020
40 | P a g e
Monthly Progress Report – December’2020
41 | P a g e
Monthly Progress Report – December’2020
42 | P a g e
Monthly Progress Report – December’2020
43 | P a g e
Monthly Progress Report – December’2020
44 | P a g e
Monthly Progress Report – December’2020
45 | P a g e
Monthly Progress Report – December’2020
46 | P a g e
Monthly Progress Report – December’2020
47 | P a g e
Monthly Progress Report – December’2020
48 | P a g e
Monthly Progress Report – December’2020
49 | P a g e
Monthly Progress Report – December’2020
50 | P a g e
Monthly Progress Report – December’2020
51 | P a g e
Monthly Progress Report – December’2020
52 | P a g e