You are on page 1of 20

MTN Congo Fiber Ring

Project

Detailed Design Document

HUAWEI TITLE SIGNATURE

Drawn by

Checked by

Project manager approved


MTN TITLE SIGNATURE

Rollout manager checked

Project manager reviewed

8 JULY 2010
Ver. 2.0

1
Cable tray

Shelter1
Shelter3

Shelter2

Lead up HDPE
Cable ditch
Cable Lead up
A'

Excavate concrete base

The cable lead up sketch map(A-A'view)

A
Scale=1:100
Cable ditch

PROJECT NAME : DRAWING NAME :


APPROVED BY CHECKED BY
MTN Congo Fiber Ring Project Drawing of site Shelter
MTN MSC Site(1)

DATE DATE
Ren Jun Ren Jun 2010-07 1:100 mm
Drawing No:GL100600F01-(Shelter)-1/7
Feeder window
Ground point

ACDB
MDF BTS6000
ODF

600*600*2000 600*600*2000
OSN3500 ODF/DDF ODF/DDF

Battery

The installation of ODF/DDF in shelter


(Scale=1:50)

PROJECT NAME : DRAWING NAME :


APPROVED BY CHECKED BY
MTN Congo Fiber Ring Project Drawing of site Shelter
MTN MSC Site(2)

DATE DATE
Ren Jun Ren Jun 2010-07 1:50 mm
Drawing No:GL100600F01-(Shelter)-2/7
Gas tank
Security room
REC2 REC1

OSN3500
Generator

Trans
Feeder window
Ground point
600*450*1600
ODF/DDF BTS2 BTS1
A

Tower The installation of ODF/DDF in shelter


(Scale=1:50)
Feeder window Shelter

Shelter

Lay along angle iron Feeder window

A' OM-28#

Lead up HDPE

The Angle iron sketch map(A-A'view)

PROJECT NAME : DRAWING NAME :


APPROVED BY CHECKED BY
MTN Congo Fiber Ring Project Drawing of site Shelter
OLYMPIC Site

DATE DATE
Ren Jun Ren Jun 2010-07 1:100/1:50 mm
Drawing No:GL100600F01-(Shelter)-3/7
ACDB
Feeder window BTS2 BTS1
A Shelter A'

600*600*2000

OSN3500
ODF/DDF

Feeder window
Trans REC2 REC1

6
Scale=1:100

OP-16#
Ground point

Shelter
The installation of ODF/DDF in shelter
(Scale=1:50) Feeder window

Lead up HDPE

The Angle iron sketch map(A-A'view)

PROJECT NAME : DRAWING NAME :


APPROVED BY CHECKED BY
MTN Congo Fiber Ring Project Drawing of site Shelter
PLATEAU Site

DATE DATE
Ren Jun Ren Jun 2010-07 1:100/1:50 mm
Drawing No:GL100600F01-(Shelter)-4/7
PD-17# A'

Lay along angle iron Feeder window


Ground point
BTS1 BTS2

OSN3500

600*600*2000
ODF/DDF
Feeder window

TRANS
Shelter
REC1 REC2

A
The installation of ODF/DDF in shelter
(Scale=1:50)

Generator
Shelter

Security room
Gas tank
Feeder window

Lead up HDPE
Scale=1:100

The Angle iron sketch map(A-A'view)

PROJECT NAME : DRAWING NAME :


APPROVED BY CHECKED BY
MTN Congo Fiber Ring Project Drawing of site Shelter
Diata Site

DATE DATE
Ren Jun Ren Jun 2010-07 1:100/1:50 mm
Drawing No:GL100600F01-(Shelter)-5/7
6400
2820
600 600 680

300160
300 270
500
BTS1 BTS2
ODF/DDF
5100

620
2230
600
Shelter

600
Trans
Tower

600
REC2 REC1 800
Shelter
DB-17#

Lead up HDPE
600 600 180 600
Feeder window
The installation of ODF in Shelter
5200

Secunty Room
Scale 1:50
Shelter Lead up HDPE

4100
The Angle iron sketch map(A-A'view)
4200

Scale 1:100

PROJECT NAME : DRAWING NAME :


APPROVED BY CHECKED BY
MTN Congo Fiber Ring Project Drawing of site Shelter
BATIGNOLLES2 Site

DATE DATE
Ren Jun Li Xue Lin 2010-07 1:100/1:50 mm
Drawing No:GL100600F01-(Shelter)-6/7
11500
230 340 2500

800
BO-32# 3.5
Lead up HDPE

1090

1190
Tower

6600

4600
Shelter
600

ODF/DDF
1400 2500

3000

420 90 600 260 600 150 600


Shelter Trans

1800

600
55012001400 3670 650
2000 500

H=1960
2200
Shelter ACTURA

600
BTS
48201
H=1850 H=1090
2600

Security Room

380
Secunty Room

8500
BTS
ACTURA

600
H=960 H=1090
3600

Generator
AVR
H=900
1090 950 1040
4000
30 4600 90 10000

The installation of ODF in Shelter room


Scale 1:200
Scale 1:50

PROJECT NAME : DRAWING NAME :


APPROVED BY CHECKED BY
MTN Congo Fiber Ring Project Drawing of site Shelter
OUENZE Site

DATE DATE
Ren Jun Li Xue Lin 2010-07 1:200/1:50 mm
Drawing No:GL100600F01-(Shelter)-7/7
air-condition
New OFC lead up
from ground floor

air-condition
1
New OFC lay under Raised floor
7160
2 OSN3500 7

1800
OSN3500 6

3 ODF/DDF 5
air-condition NO item model specification(W*D*H)remark
4 1 Battery cabinet1 Battery CB 600*400*2000 Existing
2 Battery cabinet2 Battery CB 600*400*2000 Existing
3 switch cabinet SDE401 01 900*640*2200 Existing
4 Air condition 600*440*1700 Existing
5 Huawei cabinet ODF 600*300*2000 New
6 Huawei cabinet OSN350 600*600*2000 New
7 Huawei cabinet OSN350 600*600*2000 New

PROJECT NAME : DRAWING NAME :


APPROVED BY CHECKED BY
MTN Congo Fiber Ring Project(Point noire) Drawing of equipment room
in Siè ge site

DATE DATE
Ren Jun Ren Jun 2010-07 1:100 mm
Drawing No:GL100600F01-(DIATA-BATIGNOLLES2)-1/12
To Brasserie Site
Generator shelter

Lead up 900mm
to first floor
3070

Shelter Lead up 2000mm


Existing pipeline to Loandjili site
E*4
HDP 0
OFC lay through PVC pipe 400 BS24#

23710

PROJECT NAME : DRAWING NAME :


APPROVED BY CHECKED BY
MTN Congo Fiber Ring Project(Point noire) The Pipeline Route
in Siè ge site

DATE DATE
Ren Jun Ren Jun 2010-07 1:150 mm
Drawing No:GL100600F02-(Equiptment room)-2/12
4 5
7 3

ODF
Earth access point

New OFC NO
1
2
item
Microwave
Power cabinet
model

ACTURA 48 201
specification(W*D*H)remark
600*600*2000
600*600*1080
Existing
Existing
3 Huawei cabinet OSN3500 600*600*2000 New
6 4
5
Huawei cabinet ODF
ERICSSON cabinet RBS 2216
600*300*2000
600*520*900
New
Existing
1 6
7
Air-condition
Cabinet Alarm cable sympatic
660*100*510
480*120*220
Existing
Existing

Sympatic equipment
2

PROJECT NAME : DRAWING NAME :


APPROVED BY CHECKED BY
MTN Congo Fiber Ring Project(Point noire) Drawing of equipment room
in Sympatic site

DATE DATE
Ren Jun Ren JUn 2010-07 1:20 mm
Drawing No:GL100600F02-(Equiptment room)-3/12
Fuel tank Power box Security room
Angle iron

Generator Sympatic site Feedwindow

OFC

A
Flat iron

Tower Equipment room

Angle iron A-A' view

To Siege and Loandjili


5m
SS30#

Lead up 3m
A'

PROJECT NAME : DRAWING NAME :


APPROVED BY CHECKED BY
MTN Congo Fiber Ring Project(Point noire) The Pipeline Route
in Sympatic Site

DATE DATE
Ren Jun Ren Jun 2010-07 1:100 m
Drawing No:GL100600F02-(Equiptment room)-4/12
OFC lead up 3m
1 2
3 4 5

11
New OFC

Earth access NO Item Model specification(W*D*H)remark


12 1 switch box 300*140*500 Existing
2 AST 430*220*500 Existing
9 8 7 6 3 Power cabinet ACTURA 48 201 600*600*1100 Existing
10
4 Power cabinet ACTURA 48 201 600*600*1100 Existing
5 Huawei cabinet BRU 3900/OPTIX RNT 620 600*600*2000 Existing
6 ERICSSON cabinet microwa 600*500*770 Existing
7 ERICSSON cabinet RBS 2216 600*500*1000 Existing
8 ERICSSON cabinet BTS 600*470*1850 Existing
Loandjili Site equipment room 9 Huawei cabinet OSN350 600*600*2000 New
10 Huawei cabinet ODF 600*300*2000 New
11 Air-condition 780*500*570 Existing
12 Air-condition 780*500*570 Existing

PROJECT NAME : DRAWING NAME :


APPROVED BY CHECKED BY
MTN Congo Fiber Ring Project(Point noire) Drawing of equipment room
in Loandjili site

DATE DATE
Ren Jun Ren Jun 2010-07 1:50 mm
Drawing No:GL100600F02-(Equiptment room)-5/12
Power box

Generator
Fuel tank

To Sympatic
Lead up 3m

17500 6000 SL-14#

To Tie Tie
Loandjili site

Security room

PROJECT NAME : DRAWING NAME :


APPROVED BY CHECKED BY
MTN Congo Fiber Ring Project(Point noire) The Pipeline Route
in Loandjili Site

DATE DATE
Ren Jun Ren Jun 2010-07 1:200 m
Drawing No:GL100600F02-(Equiptment room)-6/12
OFC lead up 3m

10 11

6
New OFC
5 7
NO Item Model specification(W*D*H)remark
1 switch box 390*140*580 Existing
4 8 2 AST 500*210*700 Existing
3 Power cabinet ACTURA 48 201 600*600*1100 Existing
3 4 Power cabinet ACTURA 48 201 600*600*1100 Existing
5 Huawei cabinet OSN350 600*600*2000 New
6 Huawei cabinet ODF 600*300*2000 New
9 7 Huawei cabinet BRU 3900/OPTIX RNT 620 520*380*2140 Existing
2
8 ERICSSON cabinet RBS 2206 600*450*1850 Existing
1 9 ERICSSON cabinet RBS 2216 600*520*1000 Existing
10 Air-condition 780*500*570 Existing
11 Air-condition 780*500*570 Existing

Tie Tie Site equipment room


PROJECT NAME : DRAWING NAME :
APPROVED BY CHECKED BY
MTN Congo Fiber Ring Project(Point noire) Drawing of equipment room
in Tie Tie site

DATE DATE
Ren Jun Ren Jun 2010-07 1:50 mm
Drawing No:GL100600F02-(Equiptment room)-7/12
Security room
Power box Fuel tank
To Gare site

Generator
Equipment room

LT-26#

Tower

OFC lead up 3m
To Loandjili site

Tie Tie site

PROJECT NAME : DRAWING NAME :


APPROVED BY CHECKED BY
MTN Congo Fiber Ring Project(Point noire) The Pipeline Route
in Tie Tie Site

DATE DATE
Ren Jun Ren Jun 2010-07 1:100 m
Drawing No:GL100600F02-(Equiptment room)-8/12
2
1 3 4
NO Item Model specification(W*D*H)remark
1 switch box 300*140*500 Existing
New OFC 2 AST 430*220*500 Existing
9 10 5 3 ERICSSON cabinet RBS 2216 600*550*950 Existing
4 ERICSSON cabinet RBS 2216 600*550*1000 Existing
Double air-condition

8 6 5 ERICSSON cabinet microwa 600*600*2000 Existing


7
6 Huawei cabinet ODF 600*300*2000 New
7 Huawei cabinet OSN350 600*600*2000 New
8 Power cabinet ACTURA 48 201 600*600*1100 Existing
9 Air-condition 740*500*510 Existing
10 Air-condition 740*500*510 Existing

Gare Site equipment room

PROJECT NAME : DRAWING NAME :


APPROVED BY CHECKED BY
MTN Congo Fiber Ring Project(Point noire) Drawing of equipment room
in Gare site

DATE DATE
Ren Jun Ren Jun 2010-07 1:50 mm
Drawing No:GL100600F02-(Equiptment room)-9/12
Generator

Fuel tank
Angle iron

Feedwindow

Power box
OFC
Tower
Flat iron

A' A

Angle iron

Shelt

Security room
OFC lead up 3m

A-A' view

To Brasserie and Tie Tie


GB-01#

PROJECT NAME : DRAWING NAME :


APPROVED BY CHECKED BY
MTN Congo Fiber Ring Project(Point noire) The Pipeline Route
in Gare Site

DATE DATE
Ren Jun Ren Jun 2010-07 1:100 mm
Drawing No:GL100600F02-(Equiptment room)-10/12
NO item model specification(W*D*H)remark
1 switch box 380*130*565 Existing
2 AST 500*210*700 Existing
3 switch box 140*80*180 Existing
4 OSN3500 OSN350 600*600*2000 New
5 power cabinet ACTURA 48 201 600*600*1080 Existing
1 3
2 6 Huawei cabinet BRU 3900/OPTIX RNT 620 600*600*1100 Existing
4 5 6
7 MDF 520*380*2120 Existing
8 ERICSSON cabinet RBS 2216 600*520*900 Existing
Earth access

OSN3500
Huawei

New OFC 9 ERICSSON cabinet RBS 2217 600*520*900 Existing


10 power cabinet ACTURA 48 201 600*600*1080 Existing
ODF Subframe
point

11 ODF Subframe New


Huawei

10 9 8 7
11

Brasserie Site equipment room

PROJECT NAME : DRAWING NAME :


APPROVED BY CHECKED BY
MTN Congo Fiber Ring Project(Point noire) Drawing of equipment room
in brasserie site

DATE DATE
Ren Jun Ren Jun 2010-07 1:50 mm
Drawing No:GL100600F02-(Equiptment room)-11/12
Generator

Lead up 3000mm

Equipment
Room

Tower

HDPE*4
17
Brasserie site

Security

BS1#
To Siè ge site Existing pipeline to Gare site

PROJECT NAME : DRAWING NAME :


APPROVED BY CHECKED BY
MTN Congo Fiber Ring Project(Point noire) The Pipeline Route
in brasserie site
NO item model specification(W*D*H)remark
1 Microwave 600*600*2000 Existing
2 Power cabinet ACTURA 48 201 600*600*1080 Existing
3 Huawei cabinet OSN3500 600*600*2000 New
4 Huawei cabinet ODF 600*300*2000 New
5 ERICSSON cabinet RBS 2216 600*520*900 Existing
6 Air-condition 660*100*510 Existing
7 Cabinet Alarm cable sympatic

DATE
480*120*220 Existing

DATE
Ren Jun Ren Jun 2010-07 1:150 m
Drawing No:GL100600F02-(Equiptment room)-12/12