Completed Cost Comparison sheet for Network Wiring and Switching

On Site I.T Telemax Ltd SSN Wiring

Description Cost Description Cost Description Cost

Quote # 1142 16445

Pricing
$40,176.00 $66,048.00 $86,150.00
Optional
(Optional) HPE 1820-48G Switch - 48 Ports -
Manageable - 2
Layer Supported - 1U High - Rack-mountable, $7,552
Desktop, Under
Table, Wall Mountable - Lifetime Limited Warranty -
$ 944 x 8
Optional Project Disc (250 x 8) ($2,000)
A separate quote to install 3 Category 6 Data runs for
Security Cameras on each of the 4 floors is as
follows:

3 Boxes of Cat 6 FT6 cable


(Optional) Network Switch Installation and
24 Cat 6 Data Modules
Configuration
• Supply and install 8 x 48 Port Network Switches
12 Single Port Surface Assemblies
• Supply and install all necessary CAT6 patch
Optional $1,950 $4,502
panels
1- 24 port Patch Panel
• Configure settings on each switch
• Provide documentation and passwords for each
Misc.- labels, Velcro, cable ties, etc.
Switch

Amount for materials - $1,622.00

Amount for labor - $2,880.00

Optional-4ft White Cat6 Patch Cable with Snagless


RJ45
Connectors - Cat6 Ethernet Cable - 4 ft Cat6 UTP
Cable - 4 ft
$1,463
Category 6 Network Cable for Network Device,
Workstation,
Hub - First End: 1 x RJ-45 Male Network - Second
End: 1 x RJ45 Male Network
Subtotal: $49,141 $70,550 $86,150

5% Tax $2,457 $3,528 $4,308

Total $51,598 $74,078 $90,458


Install, terminate, test, label, certify and
document Cat6 FT6 network lines for APs
according to YYCHS APs wiring list that
"requires new"
**Lines on north side of the hotel will be ran
through the stairwell before being drilled into
Network Wiring the adjacent room's blinds valance and
The project entails the installation of Category 6 (FT6) cable runs to all
Tender price includes electrical permit, inspections costs. subsequent rooms there after. Lines on the
of the 96 rooms at your location. The proposal includes 2 Category 6
• Tender has been prepared as per: south side of the hotel will be ran through the
Data runs to a single jack location in each of the 72 Standard rooms and
• Cabling Requirements and Standards v4.0 (16 storage room area and rooftop before being
2 Category 6 Data runs to each of 2 jack locations in the Suites. Once in
pages) drilled into the adjacent room's blinds valance
the rooms, all of the cable runs will be exposed along the edge of the
• Global Design & Construction Standards for and subsequent rooms there after. A small
ceiling space and then hidden in the wall from the ceiling edge to the
Technology – Hilton Worldwide (42 pages) bulkhead will have to be installed every 2nd
jack location in each room. All of the cable runs would be routed in the
• Site visit on 2019-11-22 room in order to accommodate the floor plan's
hallway ceiling space and terminated onto a patch panel in the utility
This quote includes the following: jogs.
room of each floor. There will be 2 Category 6 Tie cables installed from
Scope Includes • (4) Cat6 cables from each suite to nearest maid closet (24 Certify network lines according to YYCHS wired
each utility room patch panel down to the main patch panel at the
suites total) ports list ""TBD at re-certification"
parkade level.
• (2) Cat6 cables from each room to nearest maid closet (72 Install, terminate, test, label, certify and
As per our discussion during the walkthrough, a carpenter would need to
rooms total) document Cat6 FT6 dual network lines to link
provide a separate quote to install a decorative molding to hide the cable
• (1) Wall mount patch panel installed on each maid closet MDF to IDF#1 (on 2nd floor) IDF#2 (on 3rd
runs in each room. The project logistics can be worked out upon
• (2) Cat6 cables from each maid closet back to mechanical floor) and IDF#3 (on 4th floor) **the 1st floorwill not have an IDF rack due
approval of the proposal.
room (4 maid closets total) to space
• All plates, jacks, and terminations required constraints in the closet. 1st floor lines will run
Price per floor includes all labor and materials required to place the Data
• All crown molding, or wiremold, required in each to and be terminated in the 2nd floor IDF rack.
cables
room/suite, to be provided and installed by others Link lines at the MDF will be terminated on the
• (crown molding is highly recommended and we can quote existing MDF rack**
this with our carpenter if you like) Labour
• Filler plate above upper cabinets in suite kitchenettes to be Core a 1 1/8" hole between 1st and 2nd floor
removed, and reinstalled by others closets
• All work to be completed during normal working hours (MF, 7:00- Building and installation of white Melamine
16:00) bulkhead cover strips for valance (material and

THE FOLLOWING ITEMS ARE EXCLUDED FROM OUR


TENDER UNLESS NOTED OTHERWISE:
• ALL EXCAVATION,TRENCHING, BACKFILL,
COMPACTION, SAND BASE OR ENCASEMENT,ETC.
• ALL CONCRETE WORK: INCL. CORING,
CUTTING,XRAY,PATCHING,CONDUIT
ENCASEMENT,CONCRETE
POLE AND POST BASES, HOUSEKEEPING PADS ETC.
• ALL MASONRY WORK INCLUDING CUTTING,
PATCHING,ETC. ALL CUTTING, PATCHING,PAINTING,
ETC. ROOF PENETRATIONS, GUM CUPS, REPAIRING
Exclusion Does not include the cost for the carpenter.
• SEALING, ETC. PLYWOOD BACKBOARDS. FIRE
STOPPING. GARBAGE REMOVAL. STEEL OR WOOD
CAR PLUG POSTS, RAILS OR FENCING
• BACKING FOR SUPPORT OF ELECTRICAL FIXTURE
AND DEVICES. DRYWALL ENCLOSURES FOR
ELECTRICAL FIXTURES AND DEVICES
• SITE SURVEYING, LEVELLING, LOCATING, ETC.
• TEMPORARY POWER, LIGHTING, HEATING
• UTILITY SYSTEMS CHARGES AND FEES
• BONDING IS EXCLUDED, BUT AVAILABLE ON
REQUEST AT EXTRA COST