PIPING ENGINEERING GROUP
PIPING SUPPORT PACKAGE CHECKLIST
Verify that the Structural group has been informed of (and agrees to) support locations
requiring additional concrete footings.
Verify that standard designs have been used wherever possible and that they have been
correctly specified on the log sheet.
Verify that any special support details and their revision status are listed correctly on the
log sheets.
On special details, verify line number, temperature, and reference drawing information.
On special details, check north arrow and orientations.
On special details, verify that the load and displacement data agrees with the piping stress
analysis results.
On special details, check that the drawings provide complete fabrication details,
dimensional and weld size information.
On special details, verify that acceptable materials have been specified.
On special details, verify that the preferred structural component sizes have been used.
On special details, verify that supplementary steel, welded joints, and bolted connections
have been designed in accordance with AISC.
On special details, verify that welds have been sized in accordance with Work
Instruction 011.
On special details, check that support designs allow for field fit-up.
On special details, check that shop welds have been specified to the fullest extent
possible.
On special details, verify that the supports are designed such that they cannot become
disengaged by movement of the piping.
On special details, check the completeness and accuracy of the bills of material.
On special details, verify that the completed drawings are in compliance with Design
Guidelines GLN-G132 and GLN-P250.
Verify that the log sheet and support identification numbers (drawing numbers) are in
accordance with Design Guideline GLN-P250 conventions.
Verify that the electronic drawing files are named and filed according to Design
Guideline GLN-G035 and GLN-G132 conventions.
Check that the correct borders have been used.
Verify drawing title/revision block information against the drawing register.
Verify that verification checklists are included as appropriate and that all information is
correct.
/conversion/tmp/scratch/505885849.doc
PIPING ENGINEERING GROUP
PIPING SUPPORT PACKAGE CHECKLIST
Verify that supports represented in the 3D model agree with the completed support
package. Inform the Lead Stress Analyst if the 3D model requires updating.
Sign and date the checkprints and this checklist.
Include this checklist in the design data folder and return the folder and checkprints to the
Lead Stress Analyst.