You are on page 1of 24
SUBJECT ARCHITECTURAL DESIGN AND SITE PLANS A. PROJECT NO. 4 TITLE (and General Descristion) {A Proposed Two Storey, Sing Detached Residential Project Development, R-1, on a Froject Ste with a ten percent 10%) slope ee , STATEMENT OF THE PROBLEW: Zn Owner hae dace that his RA 2568 propery, wth a meters and located in an Urbs Area) shall serve a8 an fvaloprnent, inciwctal lots shal have a ‘depth The projec shal nckude six iG) Exciurve, Sem Upscale structures each having a Total Lot Area (TLA) o! One Hundeed Thirty Two (132.0) cquare rreiers ‘The seventy seven (77.0) square meters Tolal Gross Flocr Avea (TGFA) are Te enclosed areas cnly nd excludes al thor Foor arcae f Deing itvodueod in tho future, €. PROJECT SITE FEATURES: The Project Steve an inside io, rectangular in shape, naving a thity two meter (32 0m) wide frontage thats facrg East. The project ate uniformly sopes at one percent (1.0%) craiing souts The fifteen meter 15.0m) Road Right Of Vay (RROW) has 1.80 meter wade paver, dock surface sidewalk cn each sde. The RROVI's 310.0 slevation {An sight meter (8.0m) wide custer street bisects the sito at is long axis and intersects the main RROW at a rgnt angle. The road s al ton percent (10.0%) unform slope from west to east, which is also the Giection of te cluster staat that serves 26 deck accnss to tho ten (40,0) lots, five (6.0) on aach side of the Cluster stiet he two (2.0) era iets at the westem portion shall equal to 31.45% wider than the adjacent fot 31 the canter of te development D. DESIGN OBJECTIVES: To plan design the project on an R-i Zoned Property 5. To pany design a Project that's a closely-knt Residential Custer that wil serve as a model Savelopmertin the area © Tomanimize ine Cten's proft for me Project Proponent and The Project shall Serve 26.4 Landmark ‘or the aroa Uncer he Nana Euling Coe fhe Phipines BCP) whch ASP oar ote Goss Fao Nie staleee ree? Serrace rene & Bacony 3 see eos a facet vinci afte owng BNOTpHROT HERA ere Totes Ban 3 toey Tey cht he elwigs NOT pa oft GA? 3 Cove Tow Unt Aoom 5S stey roy vite ining ipa of Fa? 1 Matcincot « capot S Shey 2 Setar Pa wnat parr ark? 2 ove ; Siege b. Ridge Roll ~ <—@ Cattle Antenna nich ety o Spon a Tete 2 Beer Wats FGF wy aoe vine fpr efoapee? "ears tol Groner Leste - Son vt NOT po 607 a) Side Tewace - Interior Cortyarcs Samer Sree cer 8 Which s pant ot Footsrn? i 2. itty oom 6 Bateony Dying area (Panty — b. 10, Which i NOT part of RROW? 6 ‘. Sewaik 2 Curb 5 Median Front yard AL 11-Atwnat stage shouts you consider Topical Coign Cons a. Atthe very onset. during the Pre cecigh Stage . Anytime during the Design Development Stage © Dunng Cortraet Documentaton 4. During Post Conetrucion Stage A, 12 swat sige ant yorearater ee naiiay 8. tthe very once, durng the Pre design Stage Anyamne during the Design Devoiopmert Stage € Dung Contract Documentation 14. During Post Construction Stage By 19.A: wnat stage shocis you consiser Bagrananrg>) 2. At tho vary onset, during tne e-desiger Stage B_Anytme curing the Design Development Stage & During Centract Socumertaton ‘4. During Post Constricton Siage 14. At what stage shoud you consider Provisions of NECP? @ At the vey orsat, during the Pre deagh Stage D. Anytime curing tho Design Developmen Stage & During Conirec: Documentation ©. Dunng Post Constnuction Stage . 18, At what stago should you consider Provisions of PEERY - roe Al ihe very onset during tho Pro deogs Stage BD Anytene during the Design Development Stage & During Cont2¢t Decurnenatin Dung Post Gonetnictin Stove 16. Atwhat stage shoud you consice” Provisions of] 2. Atte very onset. curing the re dean eee Anytime durag ine Design Development Saye & During Contract Bosumeniaten {During Post Construction Stage 17 Atwhat stage should you consider Prousiors of 28.9266 a) Ate very ontet, dung the Pre desi Stage Anytime during te Design Development Stage Duta Contract Bocurrtaten 4. During Post Construction Stage 18. At what siage should you consder Proneons cf NAGP Rules 7 8 67 }Atthe very once, cunng he Pre design Stage ®. Anytime during te Design Daveoomers Stage & Dung Cortraet Socimentaten 4 During Pos Constucton Stage ss 19 wher SBD incised in tie Desgn Dovelopmert Stage? ia. Praperation of Technine Spectecse TY © Preparation of Root Pan es © Preparation Caing a , & Fe Layout & Foor Plans < e 20 Vinatis preven Sip < A seated SreSeweWy PMMA 6 sevione and Swie sw Acumen 3 StoNansWiee a Vic sie ofthe sructue wil be exposed tothe Sun for appronmately& months? a ed Eat Se 3. sou 3 Wes ) 1B» Hoes fe erecuee ibe expats 0 me Sun aberoxmaeh& ete? / ee Re ° — BS South West hw a a es on ’. Southwest @ Northeast righ ie eee 5 mee pion ee ee Deen sat ot ely pane asad clit aa er sar ec oy D rmacteas ctiines panama wie eeu vase tee eat a a an piel ere lary 2S Season cet get Niet ncotinen pat taunts ener kelenoes wines ee mera aes presi gioeee fa Fay SOE wnat sro nad San ins see nur in 20. Wel Ua ndn soleil agua? roe Sas tn ears aise 2 haoeassonsd Sands 31, What shetdd be the échetypior Rt devetomene ae ie hn 5 Soreeees eee. sna Susead toes satin mnie Se i geen sity Cet cwatsan thal es aoe ge ers rans fase seeks ivi ie Pw AL PROJECT NO. 2 TITLE (and General Description) A,ptopeted MaslumRise APARTMENT BUILDING Project 12. a development with « Basement Componert and on a Prowect Ste having an Eigh Parcont (BOM) Slowe towers mente B. STATENENT OF THe PROBLEM ‘A Private Development Campany (the Total Lot Area (TLA) of six thousand aquaye meters (6,000.0 SLM.) shal be developed to hoe {ig goaciment bulldng (te ‘Project). The Projects located ma Rurel Ava, HghDenaty Ovese ey Maximum RS The Dweling write shal be of 2 types: 1%) Studlo-Type win & Goss Floor es tGPA of 224 square meters: (2°) One-Bectcom Apanment Unts wih a Gross Foor Area (GPA) of 80.5 cepa meters cpr Fe he froject Se i reclangar in shape and ison inte ot, wih a with of fifty meters (60.0. the for barf which faces north. Tho 2-Lane RROW for access and cramnape (eee ERED: the Srrectihe asening leo sianty meters (60.0 m) deep and wih ect aocese to he seateanctat rico im) wioe street The RROW slopes at 19 of 1.0%, unfemly draining wes!. The road has a 2.401 wide sidewalk et each ds. The Project Ste unifomiy 2.0%) toward the RROW winch also slopes af sight ‘BALCANL (LD) towares the vacant lot in font. The surface of the sdewalk al to ganar erase ee p 6 c ® D A D c ® 6 © o C oe lef cf the Ste isa vacant at (a viewed fom the RROW) rd 10 the rear of the Project Ste are Proposed 3.Storey engle-detached residences, 0. DESIGN oByecTivEs: ‘entersileasees 3 To Plan’ design a medium-tise apartment building, maiketable and attractive to "riddle-income 5. To plan! design the apartmert building in a way that can maximize rentals and leases for the Developer, the ratio of saleable versus notysalvatle spaces based or GFA shall be at 70:30 of the leasabe: ent (86.0% ofthe Total Gross Floor Area (TGFA), and ©. To plan” desigh a bulking that shal serve as a ncmark in the Project area while considering the least cost fo the daveloperent the projet voaT EAP ENINE 36. Which fering matera is °aGhuna grantees sn wena taianante sa rin of he fotonig SNOT the mest economical? ’ China Grante Sab ® talon Grane Sab 30 vnic ‘ay oxom 3 o4om 38 Accoring to B44 2 Ocom 5 orm 40 According to OP a4 21am 3 im 41. ¥atis the minimum depen of ot or ne dacleg? 317m 3 t60m 42. whens NOT an seupment? 3 Exrauat Far wat hs floirg is nt considored future? oS 3 Tane 44, Which ofthe following ie NOT a uriture? 2 bresser 3 oun 45 mavuidng hat 0 cal cuaing, drapes, te 2 Future ©) Furishings 46, Wnieh fs NOF arumhing? "ace: Parting Asceilng Fan 47. Wen is NOT a Fumshing? 3 Wal Point 3 Comee 48, Which Flooring materiale the moet eitent? a. Vinyl Sheeis Unde 49. Which Feoring materials the LEAST ese 2. Vin Sheet Ute 150, Were te best orentaon of bedrooms? “a) Nort East D 51.Why is CFL prelerred over other types of tampe? cheaper ‘More sustanabie CC. 52: What cat you not prowdo ina pinight housing? 2. 100W incandescent & 20NCRL 43.Whieh, D A o Cc Cc B Bp Cc C G it aconomica’? @©)lalen grante tes Locally manufactured granite ts @ haan Granite Tes 1. China Grante Ties 1We folowing nota good deptn ofa ted courterton? 045m 050m what s tha minimum width of elevator door? 2 080m 110m wnat isthe einian wit of oe stall? 180m 8)1.70m 2.150m é.190m «cctv 4. Soap Dispenser ©@ounain «é Lampshade rat LED Ty, Dyan? Fotos 6. Fittings ©. Area Rug . Sectional Sota ©)Tte Fooning ‘Shelves ” @ ny Ties 6 Ceramis Ties & Ceramic Tiles 4. Vind Ties © South West «¢ vestnetic valve J readly avaiable @up 6 40W CFL DD 53 nen is the size of a bedside table? a Ottm Dom Goan 54 Whats eliistcaton for 9 og bed? A raises ~ € 8x2 29000 0 B70 x 230 em 6 7 + 230 em 98, la sae o ange ot teeta for Bsns? a 1am ad chitin 133m Gran A. 56 deat 20 of 3 Bing Table (1-09) for 4 pereone ‘120em € Higa 8 oem 6 ten G57. 1tabinng Table orpersons is used, now muti is counted? ‘210.50 sam. ‘¢, 10.80sq_m 1b, 10.20 sqm. @10.602qm. 158. virat woud be te sizeof ag 12? & 0.40x040m © 0.30% 0.30m 0g0x050m Goasx048m 59, Vat isthe NET Ate ofa Beige Table wih Drawers loge? A Seon ee ees0%x030m © os0x0s0m 6.045 x045m 60, ira isthe deal sizeof a Be for ane person? 2 o Som > 69m 79. Whats the ea dep o essing? en °. 50m @ sm 74 Whatis the siz of =)86589> 2. 45x 80 2.50 56 $02 50 a aoe as 76. For apeat house, which i HOH a good dep fo w nad Counter? 2oc0n cen Boam 6 040m 16 Wn ofthe folowng s NOT corsderes a Excavoalac? oom © Guest Pang 8, Gare Room SHomeoures Assodation Offce 17 Wich of he folowing « NOT conscorad a Ubiyprvson? 2 Generate Room eer 8 Eevatee Water Tank @ taney Stat 73 Wek oloung © UO sonerd a Saree ovetn? 2 Garaerers Room Woreshop 8. Stomesa Water Tank 4 Securty Quarters B78 thet ot tre folowing movers shout HOT be tus tes fo ene anther? 2 'Socurty Quotere Lockers and CR 3 Homeowno’ Atsoction fice and Generator Roem 2: Gunst Parang. Ramos ana Sets i. Gatern and Sowagetroutrant ent A.PROJECT NO. TILE land Genaal Desepton| A Proposed Medium-Rise OFFICE CONDOMINIUM Project ic. a development with # Basement, ‘component and on a Project Sie having a 2.60% Stone. © STATEMENT OF THE PROBLEM: "A Privately Ownee Company has deciced that's C-3 zoned propety wit a Tolal Lot Area (77.8) of two thousand square meters 2,000.00 eam.) ocsted in an urban area in Mania be developed ino a Medium Rise OFFICE GOMDOMINUN The prop Geveopmer: shal Consist of our 4.0) yoes (1) thy (20.8, Square mater GFA Office Unts, 2") minty (60.0) square meter GFA Offce nes. (3°) ninety (90.0) square ineter GFA Office Unis and (4) One Hundred Twenty (120.0) square meter GFA Office Unis C. PROJECT SITE FEATURES: “The Preje: Sie is an neice Ic, with a forty meter (40.0m) wide frontage facing South Tue Project Site ‘unformyy slopes at 2.5% towards ihe fifteen meter 76.0m) Rac Kight Of Way (RROW) that s aso at 9 ‘lope of 13 of 1.0% Graning tonards the north. and which hos a 1.8m wide sidewalks at buth sidas. The ‘surface of he sidewakc atthe center of the Project Ste trontage is corsidered as elevation 0.0. To plan! cesigh a high-density commercial building, marketable and attracive to smelt and medium-sized buyers, ‘Te plan’ deaxgn the project in @ way that can mavimize prefs forthe Project Proponent the ratio of us non-saleable spaces based on GFA shal be 70:30, and serve ae 9 landmark host ea, 80, Ta tt 2 vahicies par structural hay (meters times meters. center to center). which ef the following should NOT be 9 recommended bay measurement forthe Project? a 855x90 ¢.9.05x98 244 ey > 875495 7.26x80 8 ow rch te tuner angle secton in inet Fetes) is required for ne same 4 g/m x 810 m conference 1900 OO de 2 202 22 woe Fae ae 4.00+ 0.5 Gottes} 82, Ideal detance of colurin, conte 1 conta, for 2-car parking area? 3.700 ¢ 8co0G (eas0¢ 4. e0n0e. 83 Whalis 2 neutral coo? Bae beige gold 184 Whats not a newtra! co.or? ‘3 ivory e-taupe b.bron Dorey In Interiors, what color represerts ‘Royal and Noble™ ‘Droyal ue fuschia bree purple Whails an "Ean" Color? atan « fuschia B ted 4 purple Whats nt an “Ean olor? stan brown green (a) cooley wai goo is Fun and Alive"? bus « green >) yellow pink, ich celor has the tendency of igang aggraseve behavior? @. Voie © Pik 5 Brown (Res In (tutional Design, whet color is ming o thé eyes of a person? 2 Be oe vownts 5 Green 1 Yolow Orange ‘Anes color sigites purty ana autnerty? 2 Yalow vite ® Boge Bro" 3 Whats the es ait eco or Rook? <2) Daik ray 6 Light Gray 3 Dark Boge 3. igh Beige What a the Best pint cob ocaadorer wale? 2 ban ary ugnory 5! Dat Baige B Ugh Beige G96. What pant colar i nt recommend forthe exter af Frswal? 2 Gant Gray'o ecum Gray leek 5 Bamcray S Boge 1) 9% whario NOT «vecermended colar for aFsewat? 3 White = Be B)Blece 4 Boge fh 97 natcooris Nor wet: 8 roottece? 3 Gray Black Givinite 8. Blue A; 28 Whe shouldn't be ceate at the (C2) oy Cor oom © Guard post S. davers tounge 4 Infermaton Courter A. PROJECT NO. 4 TITLE (and General Description [A Proposed Low Rise NATIONAL GOVERNMENT OFFICE Project ie. @ deveopment wih 2 ene, Phu with OpHoTa BIPENAY a TRV 7 ‘on a Prost Sto having 9 Twa rent (29%) So 5 “ine Navenal Government a docded o erecta buiting on ks property wil @ Toll Lot Avea (TLA) of ‘ight thousand square meters Tocates m to Mania. The sucure fo be eretee shat be 3 bow-Rise Nationsl Government Ofte Duidng (C. PROJECT SITE FEATURES: "The Proect Sie mctangular through ct wih an weplanade atts Noch. The esplanade i relatively ‘tat, navng'@ V8 of 1.0% slope draining towards the eat. The Moin ax slocatad atthe eify metal {80,0m) wide frontage facing south. The Road Right Of Way (RROW) is a thirty meter (30.0m) wide street {elatvaly fot at 1/8 of 08 slope eraning east Tho se 1 & » slope of fo pereent BOM] toworco the eplanaue which Pas a 120 meter wide sicewals, ané aving 2 6.0 meter width anc @ fee aster 3.0m) vide promenade “the feed tne © 08 meter lover than the eslanade, and at 0.9 elevation on bling gicund ne. The ‘thin meter 0,0m) RROW has 2.40 meter siewales on Both sides Bl has becoma av arcaded ste! by ‘irae of a ly ordinance The project uses he Groen Bualaing’ concapt Atthe cast o tre are two (2) [overrmentcttce compieres, and across te tot are pate lowes oftee OUIONSS % : Se EE Rub sructre hata Wigh- Dena hethdene Bulg. To plan’ design a nuiaing mal can maximize services fer the general pubic, and To plan’ design a buleing that shall serve ag a landmark in the Project area with a sustainable least: cost ‘C100. Which of the following 's NOT an executive position at the Govemment-Owned end Controlled Corporation (GOCC)? 7 2. Vics President 2 Dwaion Chiat 8. Orecier & Assistance Present 101. To sameve eccnomy in dovign where 2houd the sestnele feature of an (C-2) Office Busing be vocatea? — 3 Rear pomon ofthe bulling eA he Conter of the busing >. Sides of the building GAL iront of buiing 102. What best uted tor Parking Areas? ‘a. Rough Finish Concrete OGrevei » Asorat 3 Sol 103 What type of fomsiatis beat when pourng? ‘a Cast coneiete Grave! ©) Asphat Bit ‘04, Yonat type of oad ish hase we is pourng? 12 Casteoncrote © Grav B asprat 8 ct 105, Among the choices, shen has the FASTEST surface water rurot 3 it Rows Gan 5 Censrete & Asphat< 106. Wiha ype of reed finish vi ert SSIES Hea” oaseren Ean ot ® Censrote Ort Read 107. Which pavernentgunus the MOSTitivat and refects tre most tot? 2 Asphalt S Paes « oa 9 Dic Read 108, Wn of he olowing is he ” (2 caw casey mM san win Ragstnee ann wh Garabae Srass 4 Lawn wm Pavers R108 Winch ee owng the “? ‘Pavers mi pockets for pants Pavers win gravel n between Pavers wih mertar inbetween Pavers wih sardin behwoen Tt1a. Among the choices, wtich nas the MOS ‘surfoca? a 2 Grave Concrete & Send Asprat ‘he deln ast ea i. A am Tree ‘S Manogany ees 4 Aewaa ‘Shallow Rooted) Small Darveter Roo's, Nt 4 Acacia 1 Fee NOTH ones erase ot sow ras and can easty a. tence 9 Hei GOO sorte ste because of ts SeeBFEEanc cant ve easty &. Mahogany ‘A. PROJECT NO. § TITLE |and Gonerst Description} 2 Proposed Garment and Unisisarment FACTORY Project cna Projec Site having Fou percent tat Stes S-STATENENCOF tHe PRoBLEN Sareea encanta fecdes tort a ultng ont prope with a Total Lot Aen (TLA) of ten tnsusand seuare metre Dan gain aces nan sia zone The siecle tbe erected eal earn © preiect sie searuse eine Slee idan nde aia it wih on any meter 60.0m) wae rnaae cg west The project site unformly stopes at four persent (4.0%) towards @ creeh six moters (6.0m) at SS Ihe Lat att aaa ess @cortaner Van pa Trucks, os Mb De. SHS dese Rag OF Woy ROM) tes Wey sacar (2.0m) we set haeg @ one tine srtane whch fas 24 metarsnee Sees reer cen The sure of the adowal at he center a te Peete toreage costed a elevation ©. ic sttary BROW trsetcs atm ansins a ve ior eos, ach wh ax mates. (6.0m) snow ‘ns wo f) comers hae sx meters © haan win egs of 425 cor. Toe eho te Mote a pct offcebuting.tetsr pnte a ceric acy, srors he se are two (2) dee bas a Steschr wa veSandpertomance and acne te eek se re row howe, D. DESIGN OBJECTIVES: te ort desta acter tat moxnzes the pot tv good vertoalapatlrelaorshipe wih good tows ne pace panning o._To pe deo tn fet hati eed wih eutiebty: nd £ roplan cesta bulcng hat al sve us lananark noo ae, 117. Whet type of fighting is best used for allSiORy? ‘2. Penaant « Fouescere B: Trot @ leo 118. nat be he best Regt eran Idi stuck naa Re? 4 Steel Deck tel Roo! 2, Concrete Rocf Deck Metal Root 119 What bee bes: Reina er Reso suc Hake rea aR? Roche 3 Steep Atuminum Roct ( @)Sigity Steep Gadle Root é 420. For a massive factory s'cue, what shoul be the prominent arhiectural ines tobe seen from ne steer? @) Verica « Diagenal 5. Horaontl 6 Cures 121. What should be the deal reatment forthe facade of te Warehouse? 2 a Glass and Concrete G More on Concrete and Less Giars b. More on Stes! 3 Concrete and some Paste 122 Ifthe project sts located n alake, whet should de the eal rootng material? ‘8. Conerete (docx) © Asphalt Shingles ‘tong Span G.! 6. Tegula rooting |A Proposed Low-Rise NATIONAL GOVERNMENT OFFICE Project ic.» development with a ‘Basement, Podium with Optional parking) and Tower component ard on a Projec: Ste having a Two ercent 2.0% Slope. 8. STATEMENT OF THE PROBLEM: "The National Govemmert has decided to erecta builing on is property with a Total Lot Area (TLA) of slaht thousand square maters (2,000 aq iosaied m Wotro Maria. The stustra tobe erectxd shal bo ‘ Low-Rise National Goverament Office buia.a (G.BROJecT sire FEATURES: “ihe Proje See # rectangular through ot wit an esplanade atts Nor. The esplanade is olay ‘at, hag 2 42 of 4.08 soe Srainng tonards he Sasi The Man ais located a the Oluhty meter {0.0m) nue toniaye lacing south. The Roed Fight Of Way (BROW) i 9 thie eter (38.0m) wise sect ‘Bia fat at 179 of 1.0% slooe orate east The stele aa slope ct Wo pereent (20°) ‘owaras ihe Rpanods which hos 120 moter wie ndowal, ans having 3 60 mater width ars a tee mater 3. G ‘wile promenade the fo ine is 0.8 mator ower than the esplanace. ad at 0.9 elation on bulding ground ine, The tity moter (20,02m) ROW has 240 moter odowelka On beth vies, tut as became an afeedod street by vi tue ol a cty ordinance The project uses the “Green Building” concept. A the east of te lt are two (2.0) governe offee compleres. and across the lot are puvalelomeiee oftce buildings © DESIGN OBJECTIVES: ‘2. To plan design « pubic sructure mat s 2 High-Density Institutional Buidng: To pian cesign a bulsing that can mawimae services for the general publi, ane © To plan’ sesign a buldéng that shall serve as a landmark in the Proje! area wth a sustainnble east- cost 122. iat of raiment shuld bu ne aga of Gln ae Sioa ‘2. More on Conctote wit Office Busing? 'D) More on Giass and Stoel wth lose Conerate £ Combination f Conerete ane Paste More on Steel AL 124 To achieve aconemy in designy wn “a.” Reer perten oe bulding Sees of te bulking or should the Dawnepeut af an (C-2) Ofce Building be located? ‘ Althe Genie of the butcing 6 AtPermaete: Wall 125, What i the typical space slltront fora pecaptoniroarh? a3ssqm (5:25 eqm 30sam 4 20eqm 128, 128. Whal ihe iypical space allornont for an iaevew tom” a i5sam BiiB2qm © 25 Gm aa 127 wnat shea sac oman or agate on Bassqm 285 eqn 6.2054m 128 What en ypc spce alotrent for Tpisasa Os? 3.40.50 sqm (26-20 cqm 45-50 sam 120 What isthe typical spa¢o aloirent fr ‘3 20:90 sq.m 5 40-805q.m 180, What i the typical apace allotment fora al soc ao for aoc win 2280x300 B deox 300 120-40 64% 25-30 9qm 10.20 sqm ©. 10-18 sam 84Deem Stren ‘F250 «2.50 192. Ina comded ane noisy nalvay, whieh wil you not prove i tir of acoustical eatmen'? 2 caret 8 Gypaun bows 133, Which wil you pol provide « manAgersToHCS? Gonersnce Room 3 Tae 134 Which i 04 i rode» gacmanahpestar? nia ’Sosteoe 3. Bone eae ae Mit yr Beni» SRR A ® bast fora Government Gulag Curae Gass Vistor's Chae 4 Fling Gabnet © Fie Orawer 4 Exenstve Chait sitated ia forested area? rial 4 sivated ra forested area? © Stoop Asphalt Shingles 4. Tegula roofing © Dry Storage 4. Blecrcal Room Ceo hg 4 tis mores tn Stoves base 4 Roof dace basemen? be Foxtures 4. Fuimehings 1€1, Which 's NOT ncluged inthe Architectural interiors? (a) Fumstings 2 Wal B. Floors 3. Celing 162. Which is NOT an Architectural Irterior (I) element? @ Eaves © Unit Party Walt _ Elevatec Lobby Geting 4 Gatrrcom Foot 163. Which 1s NOT an Inter Appliance? ‘a Exhaust Fan Microwave Oven 'B Electne Fan ACU 164, Which is net an Architectural inten element? '@ Suspended Slab Some wat! » Floor @Funrings 165. Whats @ zoning map? a separaton af lard subonasion of land ib) regulation of property use 4. copsration of districts 1166. wnat is @ Cadastral Map? 23 register of ra estate < @ edaivision of tans 1 regulation of property use x separation of cisirits 187, Whatis a Topographical Map? 4. erosion polenta! Dhand elevation 'b Natural and Man-mace Features sol stata 168. What is net ncluded mn Topographic Maps? / (@ Elevation of Agjacert Buitings ‘e Natural and Man-made Features ’. Contours of Ajacert Lets . vogetation ‘68. What type of foundation should be used Fhe acjacert ols sloping upwards? Retaining Wall, © Trapercidal D) isolated .riprap 4170. Which has 2 minimum of S-years warranty (asked repeatedy for each probiam) ‘2) Roofdeck Waterprooting «©. Floor Laminate ‘BT SB Wisterprocing 4. Giaes window 171. On a swampy area, who! type of soll should he founcation rest on? 3) Hara o very hard ‘© Mechum to hard Very softto sot 4 Softto mecum 172. Assuming the ate wil be on a converted rico fil, en wnat coll mutt the foundation rest? 2 Sot 6. Hara Medium 1) Very Hard 173. Aasuring the ste wil be on flood plain, on what ea! musi the foundation reat? 2 Sof Hara Medium @very Hard 174, Assuming the site wil be on Adobe Soll, what fourdaton wil you use? '2. Bored Pie (C tgolatec Fontng 5. Sheet Pi & Footings wih Tie Beams 175, Wha foundation presents the LEAST dsturvance & potest damage to neighboring lols? ‘3 Bored Pile ‘isolated Footing 5. Sheet Pile Foating with Te Boome 160, What foundaton presents tne MOST dstutvance & potential damage to negnberng ots? 3 Bored Pile € Isolated Footing b._ Sheet Pile . Footing with Te Boome 181. On an array st, where should he touncation rest? 2 Soh ‘¢ Hard b. Megium (Very Hard 162. On a site located in Pasi City near the Markina Faut Line. where should the foundaton rest? 2. Sof «Hard . Medium @ very Hard 183, What type of Foundstion should be used so that the construction would not affect the adjacent structures? 2. Pile! Caisson @)Sheet Pile D. Sip Footing mat foundation 184. Minimum USA for GI Zoning 2 10% @20% b. 15% 6.3% 185. Maximum ISA for GI Zoning 210% 220% B18% 4 5% 196, For Project under the 2004 Revised IRR of PD/No ‘006 er the NECP, what ell be the applicable range of te Floor o Lot Area Rat (FLAR) forthe Projecr? a 20 2250 B 360 4.300 107, fer Prciec.Uncer te NBCP and bases on tne maximum GEA (in square motes), wht shal be the front satback? 2 5.00 @eo b 800 3700 188. A building i FUNCTIONAL i 4. The butding has all the necessary spaces There is no Dead Space . The buiting s Form fllows Function 6. The furnture ang turashings ae minimal 489, Which ofthe folowing Structural Elemente can bo erected along a Side or Rear Preperty Line he ‘property i raging on relatvoly fat erain? D Frrewals and Penmeter Wale © End Wal ._ Retaining Wall ‘3. Zocaio Wall 199. Which o ne folowng woud you specity forthe eling 2 Sem FICE Grim GYPSULA Board bY HOMF Board 3. tamm Piynood 191. Winien Style would you recommend fr this bung” 2 Neowclasicsl International Style 5. Modern &, Styized Cassial 182. What ines should be prominent for this buteing? ‘3 hovaontal Vertical . Diagonal acne 182, Which af the lowing would you speci fer the Lobby Flooring? a, Orende fe Ving 5. Ceramic Ties & Marae 104, Which o the folowing i the meet economical but alogant fring material forthe Lobby? 2 Granite Slab € Grane Ties Concrete Sib @Synthotc Grante Ties 195. For the Project Ste (zoned as Gl under the NBCP), how much ib the sic space retirements in determining te sie of me rooms? 2 300cum © 14030um, B. 12.00 cum. ascocm 195 Forte Project Ste (coved as Gl under the NBCP). now much the maximum alowabla ISA (in square meters}? 7 a 1.800 S109 ax 5. 1800 2 3.000, 187. What mthe minimum size of an offce space as pet NBCP? (a) 300 sam © 6 00sqm B 400eqm 5.00 sqm 198 For the Project Site (zoned as GI under the NBCP), how much is the mnmum USA in square meters? a, 1800 © 1.200 B) 1200 6.3.00 199 Uncer the f Natona! Suiting Cod of the Phiippines NCP) abot = the TOSL? 33200 ‘e200 S150 © 5.400 200 in texms of mainnal producton, whic of he folowing fooring mate ie considered to have the lowest carbon teotpant? baked clay thes nigh pressure laminate oring ©) hand-cut natura: stone ©. cetami tes ef P.O. No, 1096 or te 197 Professional Regulation Commission (PRC) Professional Regulatory Board of ARCHITECTURE (PREGA) Licensure Examination for Architects (LEA) suaecr ARCHITECTURAL DESIGN AND SITE PLANNING NON . MAMUUAL DRAFTING low EDGE 243#0 CUM COMPETENCY BASED: Or MANUAL DRAWINGS AND SKETCHES (non - GRADED) Iv ORDER FOR THE ANSWERS (ORADED) ‘AMULTPLE WARNING: 1 there are contlets hetwoen 9 stated word and the numer! amount figure describe. the sialed | speled worth sShouid there be contlets bowroon two (20) stated quartiles, tre Higher gure shal prevalt IMPORTANT NOTE: For this oformat of to examination inthis subjct, tho Examinee shal be atowed ‘0 make fll use (pan books) ONLY of Rule ViLand Aule Vl ofthe 2004 Revised imofementing Rules ‘tnd Regulations TBAT of Preadartial Decree [2D] Ne. 1098, ctharwiee Known at the 1877 National ‘Buviang Code of the Philippines (NBCP) Le. ONLY as downloaded ond secoduced from the PAB2A weosite ot wvw.archiecturebosrd pt. The use of otverIRR versions are Specicalyalsaliowed dur ‘this examination ‘A. TITLE and General Description: ‘A Proposed Mesiuny-Rise GARMENT AND UNDERGARMENT FACTORY Project (develope ‘ith Basement and Tower conpenents ony] 8. STATEMENT OF THE PROBLEM: 1A cormest Fim based outside Met Malla hes decided tet Rs ney eq property with an ‘odesral 3 G8) song dassreabon, lated PareNacue Gly (near acPor, shal host almedumerise Undergarment Factory Bulling (te Project”) The Garment Frm spaces hara) ie {ped shits, dreses; mens ed lois’ undergarmeta, all fr the export market. Based on their concukants researc, the entre opeatons ofthe Garment Frm Le. wich stat (om fecepY storage oF raw mater 12 {niching, pacagng ard cortainarang, shuld Be moved to the naw faci to save 0M fen and fright) handing costs. The Garmest Frm hac about bvo undue twenty (200.0) rk ard fe employees (lcuding fey wesw betel tenor a 220 EMfoyees (C. PROJECT SITE FEATURES: snr sts as cme aa re (ie et 60 Mr wg Sa gO a canta butting tres tra a s Foca br, 2 eat (0.0) m via soa a prefs = (Coscney te primary Wa gory (RROW)) The id prtny ROW m euonae oy mio rs ench tha (6.0) ne ihecnay Core Oe ‘SRaaps ao eg ot 5 ahs on lghty (00. we owas at ce te west ‘Stee: Berman ar We conan wana onan has Te rope Se sop tt percent (¢.0%) towards the creek. The surface of the sidewalk at the primary RROW shall be considered as Siretin 00 otc Kiel te Poets ts pte er beg To erg cmos cry ‘nang recy soos fe Soe are to (Et) wows brs ond Tesauarbar wi ve ove poronsanan haces te ea bo art he (23) re oma, 2. To desgn Garment Fen ‘2 gond.process Now ‘lewrdaconship end space planing ‘ctency; amd To design @ Bulking that shal be sstahby planned esgned,cetvered a the fast cost and that Shall Sere a a andar the Project area. frelon ho 5 nasa come spes Pe) TS 1. Uncer the 2004 Revised iRR of P.0.no. 1096 or NBCP, what shal be the maximum allowable percentage of site occupancy (PSO) forthe Projet (without frewal)? Semernan eausor na aoe ort Stearn C2. ner MHC, wat tne pexbd minum rt setback meter forthe Pret ster = ce 33 as 12 2. "Undertne we whats rested minimum sd stack (a meee fr the Pat ster 0 Bly + "uncerine nce wat she rested nm er setback (n meter othe Propet ster vs “3 ae as G 5. Under the wecp, what shouldbe thease dimensions and fasts fr the proposed building, assuming onvone (1)stucture erected? ¢. 64m com = 6.796 a0 Pm x15 «7,705 Sst ct22m 27.540 en 4 6S tDam = 6255 ee 1D © wnaeistne sopronmate lo ath (n meters ofthe Prot Ste? Petey — 45 0.235 a5 ‘Ate four percent (0%) soe, whatis the diferencein elevation fn meters) between the ‘ror and rear portions of he Projet Sts? 230 ess bas 380 A. 8. "‘Wnatisthe moxinum numberof adult we'sons who can wal side by ide onthe 24 meter wide sidewab onting the Project Ste? ve <2 be ae 2. Whi urban slant on the sidewalk canbe removed? 3 wating ‘cbench 3 street tame -d Teephone Booth A, 10. ‘Which ca base part ofthe read ihtofstay (RROW) and immediatly ote the Project site? 2G + Canopy $ Fron Yard A Porimator 12, Were onthe 2oject Stef me best cation er the eating ck? s.Nonhyors Ne west yrs B. South yare a fastyod 12, hc ofthe following = NOT considered an anny suausn forthe Project? 2. erect lounge she gameroors for workers, wi Soikers union ofce x a video conference oom 13, Which ofthe folowing SNOT considered a service provision fr the Project? «2. Gym fora staff = € Cencessionoire-operated cafeteria . Business center for cients 4. Gameroom for workers 14, Which ofthe folowing is NOT considered agervice provision forthe Project? 2. Workshop and carpentry room Securit fico Mall room | 4. Overhead watertank 15. Which ofthe following is NOT considered a yy provision for the Project? 2.Gstern Covered parking, 7 . Generator room 4. Sewage treatment plant (STP) 46, Which ofthe following sets cf spaces should NOT be stwated close to each other? Na. Security staf quarters, lecker and shower Sold waste holding area and sewage treatment plat Elevators, service sts end fe escapes d. Covered parking sot, driveways, arp ot. 17, Whieh is NOT generaty considered a Green Archtecure concesn? ~2.Bulding energy consumption = D.Rairwater harvesting apoicable Lowering the bung carbon footpent 4. Relocation of informal setters onthe Project Site, if any — 28. Interms of cansiuction material procucton, which ofthe fotowng loring mater ts considered to have the lowest carbon footpran”? ~ 2. Vigan tiles * € High-pressure laminate ooring = bi Mariwasa ties 4. Baguio tone— 18, interms of production, transportation and instalation, which ofthe flowing cing mates is considered to Rave the highest embodied energy? Pople cardboard egg rte eae bored bord (C80) ,Polyearbonate sheet — Gypsum board 6-1 20._ the executive offices on the Sth floor are to ke at-condhowed, what shal be the ‘minimum distance (n maters between the finshed flor line (FFL | and the fished cling fine (FC, as provided for under the NCP? 3240 e270 2.300 4.210 24. the staff offices at the 4th flor are NOT to be sr-onditioned, what shall be the minimum distance (n meters) between the FF and the FC, as provided for under the ocr? 2.300 240 230 6.27 22. Whatis the nominal thickness (in meters) of an exterior CHE wal, excluding plaster? 2.030 025, ».0.20 6.015 — 23, Whats the nominal thickness (ln meters) of an interior CHE wall, excluding plaster? 2.025 018, ».010— 6.0.20 24.” should youreauire fone to face abunystret, which material wil ous? 2. heinforced Concrete = SDam pDnyual 1.4" CH8 = deem anes 25,” Asuming » gaara location for the Fojet Site, who type of roof rvture should be intrucd? 2. Metal roofing on space frame” e Composible deck root BRC deck root ‘4a. Steel deck roof 26. “Assuming a lakeside location forthe Project Ste, what type of building projections should NOT be intioducea? ' 3 meter deep exes {0.3 meter deap sun breakers bb 1.5 meter deep Balconies + 6.1.8 meter deep canopy IPT Review Cevter brought » pares! of land, for ks review operations, bounded and stescrited as folows: A PARCEL OF LAND (LOT 48-20) OF THE SUBDIVISION PLAN FSD-00- 960469, LNe RECORD NO. 158), SITUATED IN THE DISTRICT OF SAMPALOC, CITY OF MANILA, ISLAND OF LUZON, BOUNDED ON THE W, ALONG LINE 12 BY CALLE CATCO, ON THE N, ALONG LINE 22 BY LOT 41019; ON THEE, ALONG UNC 3-4 GY LOT 4 8.21; AN ON THES, ALONG LN 4- 1, BY CALE LEPANTO, ALL OF PS 8523). BEGINNING AT A POINT MARKED “I” ON THE PLAN BEING N.0 06036 ©, 477 M, FROM FH. NO, 476, CITY Of MANIA; THENCE 1, SOM TO POINT 2. THENCE E. ICOM TO POINT 3; THENCE S. SOM TO POINT 4; THENCE W, 100M TO THE POINT ‘OF BEGINNING. AU POINTS ROFEARED TO ARC INDICATED ON THE PLAN AND ARE MARCED ON "THE GROUND BY PS CYL CONC MONS. 15 60 CM; BEARINGS TRUE; DATE OF ORIGINAL SURVEY (tIUNE 30 - DEC 6, 3915 (MANILA CAD.) THAT OF THE SUBDVSION SURVEY ON APRIL 9, 2011, AND APPROVED GN APRIL 20, 2011 Note that te property IsSLOPING 8 towards Cale 1 rom the gen tecnica! descrnen, whats the Tha? 2 150000 © 7.500sqm 1 a0900 sq 3.0005 LPT wantee © provide a parting areo/open space fers stadees, focuty and vistors. Being the Fengshal expert, Arch. Sine Ougeda was tasked 10 come ip with the simensionsfocatin fo ts are. She came up wth the fofowny secs Dimerson 78m Wid x 40m Leng xin hick locaton tthe corre of Cayeo aed Lepanko Concrete: cos 8 ‘levaton: Fished ele of paved parking sll throughout is some lve ae idewalkwhich wit be consigered ev O Wnt sn volume that nod to be exvate nord to frsh the erdeaver? Using 1otonmer treks, Pow many trgk loads requ to remove te excavated mater? {hat 6 te volume of sane tat wil ve used? 1 you use 15-tomne ek to hath sand, how many tuck loads wil be needed? What se volume of gravelthai wit be wed? FFyou uses -tonner track te haul the grovel ow many track lade wil be needed? How rany bags of cement wil be used? ‘after coreete pouring how wil yu event crackin brought abet by raid drying due to high temperature of he envrenment? ‘220 long W 6125 Wide Farge Beam weighs how much? tna W625 Wide Flange Beer, te 7" sane fr? 2 Web Tekness wath b dep 6. Unie Wegnt How mary windewapening can heallowed.on2 Yim Hx 10m W Frewal? ao ©2 ba a ito prepares te cui sto see bu? 2. Engineer Ste! Fabricator > Aitect ©. General Contractor ‘During th constrction stage, who ie responible for ensuring the alignmentidimension of the Elevator shat? 12. ProgetEnginsce « HovstorSupplor arene 6. Genera Contractor se_ SEA yt ht sea Stipe hl Pky hg Bo nr are Cos sau als Da Some Com Paswig Owe ‘Tha du atin rt conned jos athe tt Tw Sty Raider Busing on sn upc subdien ntecy kat. Hs ltt an nsdeld mena 20084 ne To psa to eesaatg 190 mn bower band ets ho Br O- oy Roat rg away ebrad tars so Os ta val an east hes we Bra ina snl dete usc esCu, Ande ‘ero 83 Ck diaper cong wit bac euros ePO NT ao rn ate Hand Wee Cate eek Piigones. The stoi dopn 2 wars ho Gk ae \Yiveng shuld the Master Becroom be otierted? ese ere Fe iaiadiiomec! xe a . Remeron nan a ia greene pees tees as oi be edee ne pene ocho eetoen a Piotr GB. _ Shatow Root Trees Wises Feanas, Whaley anes tte Kh? 2 Tae say ena ntne ensrhs sr non DanSa as, 3 Sates Bo Ta 91 Ca a Wig 6 Wet @ wer 2 Wot Tate andor ana Sine Se ay Bry Slate «Mas aon ec fs Yot nd cones Seaton? 2" Mew pe NOP © B2aG > arian © 1020 fam Ream ay cont / 1. ~ 3 Lungtoom, Dh in Baton The tabeag ae cra a Mas eran, og, 12 Sepa es stn to een ban, & Adwntone| has aseourms To an | Ye, along at dss De ears Sitansen Cote Not apnea ‘Wt Po th wk 0p rn Lng? The cel wa anor tonic oo tw ay Sra 2 ated Conte owe es 2 futon cares acl 4 ostomy fcr Mar Src Pant wants oman hah ra ar he me cl he pce, Nit mt de as bh was? ro Shee on Wate rH ‘ote Tauren Wie 3 Shae Grav Man soles ttre Wa ‘eens op Ghd everson Eure Was Can Fr Mestorrie good iS ane Sot ar Fen Sk, wt Dasma Exoramt Prose on te T co ra acd see craton i ar eat prt a i 2 nee ws haa eed is Sane E Samee conto & Nom Sane ncn Feng ede Fr 0 Pa eso rte sags nal toa Pct Kes (be Bor career? 1 Korn rte Py cua tt 2 MirBatee inne ‘oe sina tot aa Pees? ne A cae Pay © GR Se escent 3 Rn cwe scroms ‘ milwsry ean tb? Cmte et tot nee oe. ed ‘enna enone a cut x Gn rb et en tp? ae sy a so esi fe eae sb Se a ra sy ete ot aun ng «pet dan onto nectar ey one , {rnin remunerated recent meena yn pit mena? we Se cncte aa <0 vin ears Byes Fame we reane fy) i = 96 N 2) £4 tte Scien bu aw “Gnd a » 72 ad 43h me sw no t% wer 2006 79 ne 2. at S14 sem eo Se ww oF 6 TAH Me Ws w - wean " MEN DB WIS 9 20 20 & E-Design Pre-Boord Examination SUBJECT. ARCHITECTURAL DESIGN AND SITE PLANNING 3: H there are conticts between a slated word and the number/ amount figure described, the stated / spelled werd shall provall. Should-there be conflicts botwoon two 2.0) stated quantities, the higher igure shall preva. IMPORTANT NOTE: For this reformat of the examination in this subject, tho Exeminee shell be ‘allowed to make full use (open books) ONLY of Fue Vil and Rute Vil ofthe 2004 Revised Implementing Rules and Reguiations (IRR) of Presidential Decree (P-D.) No. 1086, otherwise known as the 1977 National Building Code of the Philippines (NBCP) .«. ONLY as downloaded and reproduced from the PRBAA wobsito at warw.2rchitectureboard.ph. The use of atier IRR versions ‘re specifically disallowed dering this examination. Project |, Diosdade Macapagal Intornational Airport : LCC Passenger Termmnal Statomant ofthe Problem: "35 MUON u A 25007 hectare airport complex, 10 be developed in Clark, Pampanga, will be one of the biggest in Asia, twas designated by the Philippine goverment ap the lure prenvar gateway site of the country. It has two 3 2 klometer parallel runways that can easly accommodate the new generation of arge and wide bodted arcrafs. {At present, the airport faciltates cargo operations and commercial Southeast Asian fights, Dut t {s projected to be the country s main Intemational gateway for al forms of commercial aviation in the lulure. There are ambfious plans to construct a naw passenger terminal much bigger and more technologically advanced than is counterparts i Asia. x Frights mounted nits present terminal are mosty by LCC (Low Cost Caer) Ailings that has siarecyeery, The successful operations of budget arines Ning regularly to Clark provide saereaogors an epporunty t ave ovatus pie destinations in Asi. The plan to expand Foote aa te eusling passenger tominl and tum tito a ermal for low cost aires ae eee tid such tamanal Asia ar KL ntematonal Aiport ard Siegapore Changi ~ ‘urport Wan he increasing number of fights and growirg airport operons, te pxsing terminalis vit ne parted, enovated and modem, ing tothe ew BMIA LCC Passenger ead 2 be ore ahould repo te te nx of ternational fights moureed by the LCCS Termin capone tote mastemlan and Overall canex’f the DIMA ceveloperent. Projet Site Features “The parce tot allocated forthe DMIA.LCC Passenger Terminals 4 Shectares meastong Te Pars by 100 meters, the ong side facng east and te terminal apron. The so ie So mel 7 00a Pe peo ayaa ace he Yor ven arabe cen 2 TE icloren rah carat wie sanders IPO NOBE oS Sirecocal odes : ; a? “Terminal Building Space Reurerents , Wom Ao 4. Lobtves: a. ticketing lobby. b- baggage aim lobby. ¢. wating looby 2 rine Ticket Counters § rane Ticketing ofc SuPDONS ot TEE SEETTISET = = ~ GB 2,796.50 99." © 4,343.50 sqm. + ae b, 3,153.50 54m. 6.4462.50sqm. b Whats actual USA? ade avy 2008 50), Waa = 181 can gag OP 25 4, Public Circulation Area 5, Terminal Services: 2. restrooms, b. concessionaites, ©. shops, d. miscellaneous 6. Baggage Handling Facility 7- Inspection Stations: a. immigration, b, customs, ¢. security inspection stations 8. concourse and departure lounge 8 administration spaces 10. utities = 1. Terminals are classified under what zoning classification? a Commercial C3». PUD ours «Industria! 2. The airport is under what division: general use/ character of occupancy of building? a Dwisono —w Onison£ «visor Sonn 3-8 Determine the Maximum Development Potential of the Project Ste Eo amer=_ (OF N50 m Pso= by qt tos. = Me i BL +3, 0 mt P84 Maca = A ORY Ste my he 4 ome 7 oo > Some Gras Be = pe ca (referring to table VILG.1) Tee PER SE (refering to table VILG 2) B ‘9. What is the BHL of the project? 7 atom BtSm 3a 2m 10. How many parking slots are the minimum requirement ofthe projec? 6) 2100 6.90 ©.60 aso eqn +11. How much isthe pinimum passenger leading space inthis project? 1.1 with 2 queuing buses 1 with 3 queuing buses ¢. 2 being both sides of RROW 4.2 each with 2 queing buses 412. Whats the size ofthe parking slot or buses 36x18 b.25x12 ©. 3x9 @36x12 4. What isthe whee! load of land planes. data necessary for preliminary structural analysis of apron floor construction? 4A 4 750ksm —b. 150psf ©. 500ksm od, 200 psf B14: Howmany accoste paring sits shout be provided forthe jee”? 97 at b2 63 a4 52 C_ 15. What is the standard size of the accessible parking slot? a.3.75mx6mb.35x5m EBImxsm J 2smxsm D 16. What's the maxienum distance of the accessible slat from the entrance of the building? a. 50m b. 60m ©. 70m @iom — EMBT PRE B17 Whats the bos ication ofthe parking area or this project? a both sides of the structure Glinttontofthe structure ch WEST con the west side of the building d. away from the terminal connected by a tram B18. wnat is most important eatment for the forearaund of the terminal? anaes tere @etiveway and curb desian 8. signage and flagpole ©. landscaping to buff the noise trom sted. parking pack, Cc 18. What is the ideal treatment of the facade of the airport? Quy horizontal shading devices » reflective double glazing with vertical sun shading devices 4d, with concrete pilotis and tall low-e glazing 20-21. Determine the floor area designated for Rentable Spaces=_Wk 245, reinaunase 20l “bere = aso D0 2S ideal in the deplaning curb of the terminal? b2 c3 d4 a ei }23.Whatis the minum a sito wat at runway? 2. 50m 316m 4. 3000m C4. Whats buidable rato of slope atthe cross section of approach depatue zones? ats 216 GID are 25. What is the minimum distance of the face of the building to the @inwapyf we apply the BHL ofthe project and the clear zones of approach departure TO? runways a 100m —b 105m E316 80m 26-28, What are the 4 major modes of passenger loading in an airport? b JB 20 nt see we oe fm a325m 9b 38m 25m dm A, 31 What is the gneuonummiviitn of access roads for any development? 230m 325m c2Sm 3m A 32 mses trate eau, cho tn fotoing forget core . Toweetearonfasipinto v= projet a oak a China Grige b ceramic ie © tedKz20 footing eno STONE = 0°) 235 Considering reenoLeMY arbipls. wich ote folowing wi have rede CO Bess ert pumas cokes? “ SsdB-Katng siom SRSA esting we NEE ates urna systems «. douse gna of windows 34. Which o the terminal canara eis more through lanes i aeaercergesiog? a enpiang.cu (Eperlaning oud © aproncuth da and CC. 28.Arcaoy hetoas wl sero wt te terial ce. ow maps estado ! eiecigg 1-081 mart ne ecoos oft Nar puted etna? 1, AG ‘a Soom — G)iotm = E4Sem) * d none of the above 36. What Is the staredard color f the gamaneationinesg® helineds’ a red al c black =. white Project B Metro Manila Inter-City Bus Terminal Project Descncton Metro Manila Development Authorty has decided to molement the nir-aly Bus System, Metro Manta corwig the major cites inthe maepots, Ths pojct sims to systomalizad conc ot tie bas ranaport sytem with te city to reduce rac as wel as fo prorat and requ and confortable commuting conitons ofthe expected usar, Several nadie 9 the ener vaDped nto termodal bus terme facitising Me varie of passengers kom SMX: one other noes of land transport mio bus made of rapt Project Site Features: 4 ise aa Seats, EF 3.153500 44462505qm. B+ wrasacalts! - ad av ws 2 ma yo Om je w a? “% ‘The pict ste wil Be located in a parce! of and in Quezon Cty situated along EDSA intersection node of Cuoao- Aurora Blvd, Converted land use to UTS zane wih a Ota area Of 2.28 ‘corre fot with 160 meter wide ttortage facng EDSA NeRnbound lane) and 150 marae facing Aurora Bud (Wostbound lane} Has elatvely hat oe Sea TSE To wide level at ‘both sides. The surface of the sidewalk at the center of the Project Sile frontage is considered 238 Sevaion 0. To the aclacak sides ofthe projet are corer stabionmente ard complexes he Praiect design aims to serve as a model for other inter-cty bs terminals tobe developed in metro, [D _ 37. For this traffic generating building the SHBRGSlBetween the siraet cutsof the ingress/egress Ne ersecion shat ncibe (nearest the intersection) and the straight curb oft Tose than how niuch? 225m 50m = o75m = DOM, BB 8 sim oor paking biking sal te but wi radius ofthis development, how mh percartage oft agreement Sl be 9 260% 80% = 4K. 20H B38. vinatrue of ne IRR of PO 1096 onal the gadinpregUESR his bung ype. : anulexi —b.ruleVi crue Vil ruleX! B 42.Uncer tne 2004 oD 1095, what ithe minim turisce area the project site? The answers a percentage ofthe TLA 2.50 6.10 24 4.60 C41. Forthe project st, now much s the Say 217250 b.2260 © ¢.9000 | 6750 42, What is thewttaiifiilin atiowable impervious surface area for the project stte if the building ‘chakpothavessili@Wal? The answer is a percentage of the TLA. > 20 = bt ea 43, Whats the minrmumiumpoved@Urace area or the project se frewalis incorporated in the design? @, 2250 b. 6750, © 9000 6.11250 Co 44. Forthe project sto, now much the comtoned tal fr he maxim allowablayBA pl the minimum iiSAtin area)? 29000 bh 40 211250 4.50 45. Under the 1977 National Building Code ofthe Philippines, whet is GaNeregy the Bulging C- Freignt int forthe projet? . ‘a. antenna _b. electrical or electronic device mounted on top of the parapet wall eH HS TE EGS TOTET EN B2,796.50 34-0 b. 3,153.50 54". SA? 8. What Is actual U p B= 19 gas = ama sae gag 1? 25 6430350sqm, 8 BOT 4.4,462505qm. LL ©. deck roof level parapet wall, t introduced dmast — Par G 46 According to the NBCP, what 1s the maximum height of the structure? 2.9m b. 10m 15m d. 12m 47 For design standards and eteence, what te MM ac fo BOBBBP net ~— 2.9,75m-16.46m —b S.4m-om cc. 3.46m-6.7m ‘d.none of the above oP) C, 48. What i the conceptual fiw of eialidh for this building type? alee Doeentnatcd ¢. linear oyial DD. 48. Using the aiowable maximum building footprint (AMBF) and the maximum building height limit (BHL) that are applicable for the project under NBCP, what shall be the reeuttant TRA per floor? ~ =a TOFA PER Fuk

You might also like