You are on page 1of 4

Asahan No.

3 Hydroelectric Power Plant Construction Project


Sumatra, Indonesia
Shimizu - Adhi Karya JO

Type of material : Sampling Date :


Source of material : Testing Date :
Location of test : Location of sampling :

0-5
Sample No.1 Sample No.2 Average Sand
Sieve size (mm)
Individual Individual Cumulative Lower limit Upper limit
Cumulative Retained Retained
Retained Passing (%) Retained Retained Passing (%) Passing (%)
mm ASTM No. Retained (g) (%) (%) TS 100308 TS 100308
(g) (g) (g)
9,5 3/8 0.0 0.0 100
4,75 4 2.2 0.9 90 100
2,36 8 92.0 91.3 80 100
1,18 16 169.8 182.3 50 90
0,6 30 102.0 102.1 25 65
0,3 50 44.1 41.3 10 35
0,15 100 42.8 39.1 2 15
0.075 200 28.9 27.2 - -
sum

5-10
Sample No.1 Sample No.2 Average 0-5 mm
Sieve size (mm)
Individual Individual Cumulative Lower limit Upper limit
Cumulative Retained Retained
Retained Passing (%) Retained Retained Passing (%) Passing (%)
mm ASTM No. Retained (g) (%) (%) TS 100308 TS 100308
(g) (g) (g)
12.7 1/2 100
9.5 3/8 90 100
4.8 4 0 15
2.4 8 0 5
sum

10-25

Sieve size (mm) Sample No.1 Sample No.2 Average 5-10 mm


Individual Individual Cumulative Lower limit Upper limit
mm ASTM No. Retained Cumulative Retained
Passing (%) Retained Retained
Retained
Passing (%) Passing (%) TS 100308 TS 100308
Retained (g) (%) (%)
(g) (g) (g)
38.1 1 1/2 100
25.4 1 95 100
19.1 3/4 - -
12.7 1/2 - -
9.5 3/8 0 10
4.75 4 0 5
sum

Contractor Engineer
Shimizu-Adhi Karya JO Nippon Koei

Name : Name :
Date : Date :
Asahan No.3 Hydroelectric Power Plant Construction Project
Sumatra, Indonesia
Shimizu - Adhi Karya JO

Type of material : Crushed material Sampling Date : 17/12/2020


Source of material : Tunnel Muck Testing Date : 17/12/2020
Location of test : Laboratory at BP1 Location of sampling : BP1 Stock Yard

0-5
Sample No.1 Sample No.2 Average 0-5
Sieve size (mm) Individua Individua Cumulati
Cumulative Lower limit Upper limit
l Retained Passing l ve Retained
Retained Passing (%) Passing (%)
mm ASTM No. Retained (g)
(%) (%) Retained Retained (%) TS 100308 TS 100308
(g) (g) (g)
9.5 3/8 0 0 0 100 0 0 0 100 100 100 100
4.75 4 2.2 2.2 0.44 99.56 0.9 0.9 0.18 99.82 99.69 90 100
2.36 8 92 94.2 18.84 81.16 91.3 92.2 18.44 81.56 81.36 80 100
1.18 16 169.8 264.0 52.80 47.20 182.3 274.5 54.90 45.10 46.15 50 90
0.6 30 102.0 366.0 73.20 26.80 102.1 376.6 75.32 24.68 25.74 25 65
0.3 50 44.1 410.1 82.02 17.98 41.3 417.9 83.58 16.42 17.20 10 35
0.15 100 42.8 452.9 90.58 9.42 39.1 457.0 91.4 8.60 9.01 2 15
0.075 200 28.9 481.8 96.36 3.64 27.2 484.2 96.84 3.16 3.40 - -
sum 500 500

100

80

Result
60
Result
Lower limit
Upper limit
40

20

0
0.1 1 10

Contractor Engineer
Shimizu-Adhi Karya JO Nippon Koei

Name : Name :
Date : Date :
Asahan No.3 Hydroelectric Power Plant Construction Project
Sumatra, Indonesia
Shimizu - Adhi Karya JO

Type of material : Crushed material Sampling Date :


Source of material : Tunnel Muck Testing Date :
Location of test : Laboratory at BP1 Location of sampling :BP1 Stock Yard

5-10
Sample N0.1 Sample No.2 Average 5-10 mm
Sieve size (mm) Individua Individua Cumulati
Cumulative Lower limitUpper limit
l Retained Passing l ve Retained
Retained Passing (%) Passing (%)
mm ASTM No.Retained (g)
(%) (%) Retained Retained (%) TS 100308 TS 100308
(g) (g) (g)
12.7 1/2 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0! #DIV/0! #DIV/0! 100 100
9.5 3/8 0.0 0.0 #DIV/0! #DIV/0! 0.0 0.0 #DIV/0! #DIV/0! #DIV/0! 90 100
4.8 4 0.0 0.0 #DIV/0! #DIV/0! 0.0 0 #DIV/0! #DIV/0! #DIV/0! 0 15
2.4 8 0.0 0.0 #DIV/0! #DIV/0! 0 0.0 #DIV/0! #DIV/0! #DIV/0! 0 5
sum 0 0

100

80

60
Result
Lower limit
Upper limit Result
40

20

0
1 10 100

Contractor Engineer
Shimizu-Adhi Karya JO Nippon Koei

Name : Name :
Date : Date :
Asahan No.3 Hydroelectric Power Plant Construction Project
Sumatra, Indonesia
Shimizu - Adhi Karya JO

Type of material : Crushed material Sampling Date :


Source of material : Tunnel Muck Testing Date :
Location of test : Laboratory at BP1 Location of sampling : BP1 Stock Yard

10-25
Sample N0.1 Sample No.2 Average 10-25 mm
Sieve size (mm) Individua Individua Cumulati
Cumulative Lower limit Upper limit
l Retained Passing l ve Retained
Retained Passing (%) Passing (%) JIS A5005 (2510)
mm ASTM No.Retained (g)
(%) (%) Retained Retained (%)
(g) (g) (g) Min Max
38.1 1 1/2 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0! #DIV/0! #DIV/0! 100 100 #DIV/0!
25.4 1 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0! #DIV/0! #DIV/0! 95 100 #DIV/0!
19.1 3/4 0.0 0.0 #DIV/0! #DIV/0! 0.0 0.0 #DIV/0! #DIV/0! #DIV/0! - - #DIV/0!
12.7 1/2 0.0 0.0 #DIV/0! #DIV/0! 0.0 0.0 #DIV/0! #DIV/0! #DIV/0! - - #DIV/0!
9.5 3/8 0.0 0.0 #DIV/0! #DIV/0! 0 0.0 #DIV/0! #DIV/0! #DIV/0! 0 10
4.75 4 0.0 0.0 #DIV/0! #DIV/0! 0.0 0.0 #DIV/0! #DIV/0! #DIV/0! 0 5
sum 0.0 0.0

100

90

80

70

60
Result
50
Lower limit Result
Upper limit
40

30

20

10

0
10 100

Contractor Engineer
Shimizu-Adhi Karya JO Nippon Koei

Name : Name :
Date : Date :