Professional Documents
Culture Documents
Indosat Site ID :
SITE ADDRESS : Klangsur, Dongko, Kabupaten Trenggalek, Jawa Timur 66363, Indonesia
No Description OK NOK NA
1 Cover
…………… , …………………
(-----------------------------------------------) (------------------------------------------------)
PROPOSED SITE COLLOCATION SUMMARY
FOR
COLO SHARED INFRASTRUCTURE
SITE ADDRESS Klangsur, Dongko, Kabupaten Trenggalek, Jawa Timur 66363, Indonesia
I. Existing Antennas
RRU 6 46
MW
…………… , …………………
(-----------------------------------------------) (------------------------------------------------)
PHOTOGRAPH DOCUMENTARY
Site No. : Project : Mini CME XL Project
Site Name : Location :
NUMPAKCES TRENGGALEK
Visit Date : 11-Dec-20
Prepared by : PT. HUAWEI TECH INVESTMENT
Surveyor : PT. PERSONEL ALIH DAYA
Proposed RBS
PHOTOGRAPH DOCUMENTARY
Site No. : JAW-JI-TRK-4072 Project : Mini CME XL Project
Site Name : Location :
NUMPAKCES TRENGGALEK
Visit Date : 11-Dec-20
Prepared by : PT. HUAWEI TECH INVESTMENT
Surveyor : PT. PERSONEL ALIH DAYA
Proposed Antenna
Proposed Antenna
REQUEST FOR APPROVAL
(Tower Rental Project)
Date :
SITE ID SITE INFO PROVIDE REMARK
SITE ID XL: JAW-JI-TRK-4072 RNP
SITE ID ISAT : 0 RF : 46m, azimuth :
SITE NAME XL : NUMPAKCES TRENGGALEK Location Photograph
TNP
Address: NE HEIGHT NE DIAMETER AZIMUTH FE SITE ID
Prepared by,
PT. HUAWEI TECH INVESTMENT
NAME :
Date :
CHECKLIST APPROVAL PROPOSAL
Site Name :
NUMPAKCES TRENGGALEK
Visit Date : December 11, 2020
I. GENERAL INFORMATION
Area : JAWA TIMUR
Site Address :
Klangsur, Dongko, Kabupaten Trenggalek, Jawa Timur 66363, Indonesia
Contact Person :
Phone Number :
✘
Map Datum : WGS 84
✘ Mark position on map ✘ A4 sketch from above
Taken on ✘
Ground Exist. Tower Building Tree
Page 1 of 7
ENGINEERING SURVEY REPORT
Prepared by : Project :
PT.Huawei Tech Investment Tower Rental New Build / Collocation Existing
Surroundings :
✘
RBS TYPE INDOOR OUTDOOR MODEL :
Note : Diisi oleh PIC RND XL berdasarkan info & data di SSR
OTHER COMMENTS:
RF RECOMMENDATION : ✘
OK NOT OK
Page 2 of 7
ENGINEERING SURVEY REPORT
Prepared by : Project :
PT.Huawei Tech Investment Tower Rental New Build / Collocation Existing
V. TRANSMISSION DATA
Prop.MW Antenna Height : ……...…. M
Diameter : ………….M Azimuth 21.55 …………..
FACING SITES DISTANCE (km) BEARING (degree) ANTENNA HEIGHT (m) DIAMETER (M)
(*) Diisi hanya untuk Project XL Own Build / oleh Vendor Sitac Regular
OTHER COMMENTS :
GREEN FIELD
General Topographi : ✘
Flat Swamp Slope Hilty
Obstruction ✘
No Trees Building ……………..
ACCESS TO SITE
Distance from public road : 20 Meter Width : 3 Meter
Type of pavement : Hotmix Asphalt ✘ Concrete Paving Block
page 4 of 7
ENGINEERING SURVEY REPORT
Prepared by : Project :
PT.Huawei Tech Investment Tower Rental New Build / Collocation Existing
Ladder Yes No
Is it possible to use ? : No ✘
Yes
(*) Diisi hanya untuk Project XL Own Build / oleh Vendor Sitac Regular
page 5 of 7
ENGINEERING SURVEY REPORT
Prepared by : Project :
PT.Huawei Tech Investment Tower Rental New Build / Collocation Existing
TOWER DATA
Tower Height : 50 M ✘
From Ground Level From Roop Top Level
Tower Type : ✘
Self Supporting Tower Monopole/Single Pole
: Guyed Tower Three Camouflage
(*) Diisi hanya untuk Project XL Own Build / oleh Vendor Sitac Regular
OTHER COMMENTS
POWER SOURCE
Power Availability (PLN) For XL ✘
Available Not Available Capacity : 6.6 KVA
Provided by building / PLN, Capacity : ... KVA ( FOR ROOF TOP SITE)
(*) Diisi hanya untuk Project XL Own Build / oleh Vendor Sitac Regular
OTHER COMMENTS:
page 7 of 7
VII. ATTACHMENT
DOCUMENT INDICATION
✘
Photo GPS Photos
✘
Surroundings tower (radius 200 m) Google maps & Sketch
✘
360 degree panorama, each 30 degree Photos
✘
Site situation, access, existing facilities, etc Photos & Sketch
✘
Obstacle objects & near field obstruction Photos
✘
Existing facing sites Photos & Sketch
✘
Proposed site & Area Photos & Sketch
✘
Actual centerline, North on sketch Sketch
✘
Location and size of column and beam, existing and additional Photos & Sketch
✘
Proposed Location and Shelter, Tower, AC, Power meter, etc Photos & Sketch
✘
Proposed routing of cables (co-axial, power, grounding, lightening conductor) Photos & Sketch
✘
Antenna type, location, level and direction, present, future Sketch
✘
Site Outline Drawing Hard Copy
PHOTOGRAPH DOCUMENTARY
Site No. : JAW-JI-TRK-4072 Project : Mini CME XL Project
Klangsur, Dongko, Kabupaten
Site Name : Location : Trenggalek, Jawa Timur 66363,
NUMPAKCES TRENGGALEK Indonesia
Visit Date : 11-Dec-20
Prepared by : PT. HUAWEI TECH INVESTMENT
Surveyor : PT. PERSONEL ALIH DAYA
GPS
PHOTOGRAPH DOCUMENTARY
Site No. : JAW-JI-TRK-4072 Project : Mini CME XL Project
Panoramic 100o
Panoramic 270o
Panoramic 330o
Panoramic 330o
PHOTOGRAPH DOCUMENTARY
Site No. : JAW-JI-TRK-4072 Project : Mini CME XL Project
Klangsur, Dongko, Kabupaten
Site Name : Location : Trenggalek, Jawa Timur 66363,
NUMPAKCES TRENGGALEK Indonesia
Visit Date : 11-Dec-20
Prepared by : PT. HUAWEI TECH INVESTMENT
Surveyor : PT. PERSONEL ALIH DAYA
Tampak Atas Bagian Depan Site Tampak Atas Bagian Belakang Site
PHOTOGRAPH DOCUMENTARY
Site No. : JAW-JI-TRK-4072 Project : Mini CME XL Project
Tampak Atas Bagian Kiri Site Tampak Atas Bagian Kanan Site
PHOTOGRAPH DOCUMENTARY
Site No. : JAW-JI-TRK-4072 Project : Mini CME XL Project
* Need add manual hauling for material due to access limitless, ± 35 meter
PHOTOGRAPH DOCUMENTARY
Site No. : JAW-JI-TRK-4072 Project : Mini CME XL Project
Klangsur, Dongko, Kabupaten
Site Name : Location : Trenggalek, Jawa Timur 66363,
NUMPAKCES TRENGGALEK Indonesia
Visit Date : 11-Dec-20
Prepared by : PT. HUAWEI TECH INVESTMENT
Surveyor : PT. PERSONEL ALIH DAYA
POLE PLN
TRAFO PLN
PHOTOGRAPH DOCUMENTARY
Site No. : JAW-JI-TRK-4072 Project : Mini CME XL Project
Klangsur, Dongko, Kabupaten
Site Name : Location : Trenggalek, Jawa Timur 66363,
NUMPAKCES TRENGGALEK Indonesia
Visit Date : 11-Dec-20
Prepared by : PT. HUAWEI TECH INVESTMENT
Surveyor : PT. PERSONEL ALIH DAYA
SITE SITUATION 1
SITE SITUATION 2
As to As (tower width leg to leg) - process
anchor measurement