SISÄKKÄIN TASKS 12.1.

2021
Wood Architecture Experimental Building Project / Tasks for the first 1,5 weeks

TASK LIST 1 by Thursday 14.1.


• NAME OF THE PROJECT all make proposals

• LIST OF DRAWINGS / DOCUMENTS NEEDED joint task


- What do we need to design
- Responsibilities
- Information needed
-  SCHEDULE (specify the original schedule given)

• COMMUNICATION PLAN joint task


- Inside the team
- Public communication
SISÄKKÄIN TASKS 12.1.2021
Wood Architecture Experimental Building Project / Tasks for the first days

TASK LIST 2 by Thursday 21.1.


• group 1: PLAN (4 students)
– FUNCTIONS NEEDED  SPACE NEEDED  ORGANIZATION OF THE FUNCTIONS
– POSSIBLE OVERLAPPING FUNCTIONS
– INTERIOR DIMENSIONS  MINIMAL BUT COMFORTABLE
– OPENINGS  VIEWS  DAY-LIGHT
– INTERIOR APPEARANCE  SPATIAL CHARACTER
• use 3-D studies, diagrams and all tools to envision the space
• group 2: TECHNICAL UNIT (4 students)
– Possible ways of organizing the functions  dimensions
– Installations / building services: water, sewerage, air conditioning, heating, electricity, lighting etc. 
space needed, requirements
– Case study solutions
• group 3: VOLUME / EXTERIOR APPEARANCE (4 students)
– POSSIBLE APPEARANCES, ROOF , VOLUME
– EXTERIOR DIMENSIONS  TRANSPORT LIMITS  POSSIBLE SOLUTIONS
– OPENINGS, POSSIBLE CLADDING MATERIALS
– OTHER COMPONENTS NEEDED (gutters, rainspouts, snow traps, ladder…)
• use physical models, sections axonometric and other 3D tools to study the volume
• group 4: STRUCTURES / ELEMENTATION (3 students)
- HOW TO BUILD / POSSIBLE MATERIALS / STRUCTURAL SOLUTIONS
- POSSIBLE DIVISION IN ELEMENTS  HOW TO TRANSPORT
- OTHER NECESSARY STUDIES
– (