Gulf Eagle Contracting A01

CALCULATION SHEETS
PROJECT NAME: Facility-A01-Control Room in Zone-I to Zone-VI
SITE NAME Western Region
AREA OF FACILITY PM Area TOTAL NO NET UNIT
Flat AREA - 1 - M2
Area of the Building Length Width Area
Ground Floor Area

1 Steel Reinforcement per zone

Length/Ar UNIT Weight


Item Item Description No (kg/m) Member Total Net Total Unit
ea

Column Steel-16mm dia 40 12.00 1.580 18.96 758.40 Kg

Beam-1 Steel-16mm dia 18 12.00 1.580 18.96 341.28 Kg


Beam-2 Steel-20mm dia 21 12.00 2.469 29.63 622.19 Kg
Roof Beam-
Steel-12mm dia 13 12.00 0.890 10.68 138.84 Kg
22
Slab Steel-12mm 29 12.00 0.890 10.68 309.72 Kg
Raft Steel-20mm dia 26 12.00 2.469 29.63 770.33 Kg
Ties Steel-8mm 36 12.00 0.395 4.74 170.64 Kg
Ties Steel-10mm 62 12.00 0.617 7.40 459.05 Kg

TOTAL 3,570.44 Kg
Total Number of Zones is 6=6x3570.44 kg 21,422.66 Kg