You are on page 1of 2

Eastern Refinery Limited

Instrument & Communication Department Date:_______________


SERVICING & CALIBRATION OF SAFETY RELIEF VALVES

Unit: Ref:____________
Sl Instru- Location Service Service Relief Pressure (Designed) Accumu- Tested Replace- Person from Supervisor/In Remarks
No. ment Fluid Tempe- lation Checked before Servicing Calibration after servicing on ment of Instrument spector from
Job Tag rature At Service At Test Temp. Relief at Bar Relief at Notch spare parts (Sign) Inspection
No. Temp. in Bar in Bar or or Kg/cm² Bar or setting (Sign)
or Kg/cm² Kg/cm² gauge gauge Kg/cm²
gauge Leakage in Leakage in
BPM at __% gauge BPM at __%
of set. Press. of set. Press.

Checked By: Signature__________________________________ Signature_________________________________


Officer/Asstt. Manager (Instrument) AGM (I&C)
CC : AGM (I&PC)

You might also like