Professional Documents
Culture Documents
CPWD
feooil-110011
fasil dya isT, fAS1 , T
3Ta-deleeevbed.cpwd@nic.in
HTS
23022227
Ha
e 54(822)/141,7/2020-21/957
Vigyan
56/EE (E)VBED/2020-21
Agreement No.: No. 000290952012,
vide NEFT Payment vide
by you
submitted your
the above work.
Ref. -
1. Performance guarantee for amounting to Rs. 67,256/- for
15.10.2020
INDBO000006 dated 5 4 ( 8 2 2 ) / f d . 4 a H . / 2 0 2 0 - 2 1 / 1 9 1 2
Acceptance No.
2. This office letter Intent/
of
H: 13.10.2020
HC-Schedule of Work
203
uplink po
4 Pair Networking LAN cable
Suppiying and iaying of CAT 6/6A, etc. as
channelconduit in following way complete
n the existing
read 500 Mtr 82 00 41 000 00
82Run sizes of CAT6, 4 pair LAN
Supplying and fixing of followingmolded RJ 45 connectors at
cabie patch cord having factoryetc. as
both ends of the catbie complete reqd
6 Each 278 00 166800
231ee Each 30800 1848 00
p10 teet Gross Total 1434.020.00
Executive Engineer
VBED, CPwD, V Asnene
New Deih1001
Date: 29-01 2020
Rie No Ref/witi/111/220
Celebrations
TO WHOM IT MAY CONCERN
This is to certify that M/S Aparna Infotech Systems, C-149 Sec 10 Noida has completed the following
workSatisfactory
S.N Name of Work Supply Installation of Cisco Wifí
access point, Computer
Networking Systerm, Cable laying &
EPABX System (AMC) etc,
Pro
AATICONS
VEN
Scanned bv Tan.Scanner