Professional Documents
Culture Documents
PREPARED BY :
NAME : MUHAMMAD AZWAN BIN PAKHALAN
REGISTRATION NUMBER : 08DEP14F1085
DEPARTMENT : DEPARTMENT OF ELECTRICAL ENGINEERING
DURATION OF TRAINING : 28 NOVEMBER 2016 - 14 APRIL 2017
i
LAPORAN AKHIR LATIHAN INDUSTRI
OLEH
DI
NO MATRIK
08DEP14F1085
ii
ACKNOWLEDGEMENT
First and foremost, all praises to Allah SWT for giving me chance to complete this report on time.
I am sincerely want to express my gratitude to my supervisor and co-supervisor, Mr. Desmond Khoo and
Ms. Anapurni who have greatly shared their knowledge with me with patience and diligence in helping
me to meet the necessary works for the completion of my practical training. Their dedication and keen
interest above all and their overwhelming attitude always motivate me and make me confident in
completing my work along the duration of this training. In addition, their scholarly advice and approach
have helped me a lot to a very great extent to accomplish this training successfully.
Besides that, I would like to thank my Industrial Training supervisor Puan Hasni Binti Hashim, a lecturer
from Department of Commerce in Politeknik Sultan Salahuddin Abdul Aziz Shah(PSA), Shah Alam for
her guidance, advice and support besides her willingness to spent her time to meet and visit me at my
workplace for evaluation. I also want to thank my parents for the financial assistance and for their
endless support who always guide and give words of wisdom to inspire me in doing my best in preparing
this report.
Not to forget, it is my pleasure to express my deep sense of thanks to my colleagues who are willing to
give cooperation and spent their time to help me throughout my practical training. I want to thank them
for their willingness to give suggestions and to share information and knowledge with me. I am very
grateful to have the opportunity to work at this company together with the team that I have worked with
which from network and operation department. Without the people mentioned above I am not being able
iii
TABLE OF CONTENTS
Page
ACKNOWLEDGEMENTS iii
TABLE OF CONTENTS iv
LIST OF FIGURES vi
LIST OF TABLES viii
CHAPTER 1: INTRODUCTION
1.1 Background of Industrial Training 1
9
2.5 Senior Management Team
10
2.6 Network & Operations Structural Organization
10
2.7 Background of Company Attached
32
CHAPTER 4 : TECHNICAL REPORT / JOB SCOPE
35
4.1 Task 1 (Site Utility Management)
40
4.2 Task 2 (Apparatus Assignment (AA) Microwave & LTE Application)
47
4.3 Task 3 (Licensing Process)
iv
CHAPTER 6 : SUMMARY
BIBLIOGRAPHY 54
APPENDICES 55
v
List Of Figures Page
20
Figure 3.2.2: Example of Tenancy Agreement
20
Figure 3.2.3: Renewal lisitng
21
Figure 3.2.4: Example of Apparatus Assignment certificates
22
Figure 3.2.5: Example of listing to courier AA certificates
23
Figure 3.2.6 : Electronic Document Management System (EDMS)
24
Figure 3.2.7: Example of listing of 170 sites for payment claiming
25
Figure 3.2.8: Example of listing of professional fees
26
Figure 3.2.9: Example of listing of AA certificates received from MCMC
27
Figure 3.2.10: Cell Tracker (Citrix) Menu
27
Figure 3.2.11: Cell Tracker content
28
Figure 3.2.12:The historical documents in EDMS
29
Figure 3.2.13: EDMS Payment Interface Module
29
Figure 3.2.14: EMDS records for miscellaneous bill 30
Figure 3.2.115: Listing for renewal 31
Figure 3.2.16: Uploading site information into Site Library 39
Figure 4.4.1.1: Example as Built Site 39
Figure 4.4.1.2: The Share point (Site Library) 39
Figure 4.4.1.3: The document had been uploaded in the share point 46
Figure 4.5.2.1: The License Request Form 47
Figure 4.5.3.1: station list were verified using Excel Sheet preprogrammed by
MCMC 47
vi
Figure 4.5.3.2: The list to be verified before uploaded to eSpektrum 48
Figure 4.5.3.3: The verified station were displayed automatically in Google Earth 48
Figure 4.5.3.4: The verified list were compiled into a scanning list 49
vii
List Of Tables PAGE
44
Table 4.5.1.5: List of apparatus under Broadcasting Station
45
Table 4.5.1.6: List of apparatus under Amateur Radio Station
viii