Professional Documents
Culture Documents
Page 1
Subject: Expansion Tank And Air Separators For B003
Received Date : 10/27/2009 Issued Date: 10/31/2009
Contractor: SBG/RPD
Project Title: KSU Endowment Towers
Project No.: RY-0843-B003, B004, B005, B006
Attachments: Data sheet and catalogue.
Trans. Number: MAT-M-018-RO Date : 10/25/2009
Design drawings, specification, and site requirements have been used in the review
with the following conducted remarks:-
Item No. Comments Recommended
Code
F-CS09/A
Design drawings, specification, and site requirements have been used in the review
with the following conducted remarks:-
Item No. Comments Recommended
Code
F-CS09/A
Design drawings, specification, and site requirements have been used in the review
with the following conducted remarks:-
Item No. Comments Recommended
Code
ii) pressure drop shall not exceed 100 Pa. Contractor shall verify during testing
and commissioning period.
iii) Sound attenuators shall be fabricated as per SMACNA HVAC duct
construction standards.
iv) Each Attenuator shall have a nameplate specifying brand name, model, size,
standards etc..
F-CS09/A