PROGRESS PHASE I UPDATE 13 DESEMBER 2019 VOPAK - JAKARTA TANK TERMINAL

AREA PAGAR SEGARA


1. FOUNDATION FOAM TANK :
FINISH AREA PIPE SLEEPER
2. PEDESTAL TAMBAHAN : 1. PIPE SLEEPER 4 EA : FINISH
FINISH

AREA PIPE SUPPORT


1. PIPE SUPPORT 4 EA : FINISH
AREA PIPE SUPPORT 2. PIG LAUNCHER : FINISH
1. PIPE SUUPORT 6 EA :
FINISH
2, PIG LAUNCHER 2 EA : FINISH

AREA DIGUL
AREA New DG 9102 1. PIPE SLEEPER: FINISH
1. DG, SHELTER : FINISH 2. PBG 2003 N 2004 : FINISH
,2. SLAB, CABLE DAK: FINISH . 3. PIG LAUNCHER 2 EA : FINISH
AREA New DG 9101 SIKU MATERIAL BELUM 4.SLAB DRAINAGE AKSES SALURAN :
DG, SHELTER, SLAB, CABLE DAK:
FINISH
SIKU MATERIAL BELUM TERSEDIA

AREA PIPE SLEPER ADDICTIVE TANK


1. 10 EA FINISH
AREA New TLB
1. FONDATION TLB FINISH
2.ACCES PLATFORM N SLAB TLB ; FINISH
3. SLAB PAVEMENT TLB : FINISH
4. PIG LAUNCHER : FINISH
5. ACCES PLATFORM N PIPE SUUPORT : FINISH
6. PIT TLB : FINISH

AREA New PRK 2001


1. PBG 2001 : FINISH

PONDASI TANK 02D : FINISH