Professional Documents
Culture Documents
500
KEY PLAN
BYPASS LINE 1
500
KEY PLAN
BYPASS LINE 2
A A
LEGENDS :-
FGL - FINISHED GROUND LEVEL
FNL - FOUNDING LEVEL
EGL - EXISTING GROUND LEVEL
TOC - TOP OF CONCRETE
IL - INVERT LEVEL
NOTES :-
1] ALL DIMENSIONS ARE IN MILLIMETERS & LEVELS ARE IN METER
2] GRADE OF CONCRETE
a) PCC = M15
b) RCC = M30
3] GRADE OF REINFORCEMENT = FE500D
4] SBC OF SOIL AS PER SITE INFORMATION
IS 15T/SQM
5] CLEAR COVER TO REINFORCEMENT
a) RAFT.................40mm
b) WALL.................40mm
c) TOP SLAB..............25mm
6] FOR DETAIL `F' PLEASE REFER SEPRATE DRAWING N0.06
UTTAR PRADESH JAL NIGAM - KANPUR
CONSESSIONAL :
KANPUR RIVER MANAGEMENT PVT. LTD.
PROJECT TITLE :
210 MLD UASBR BASED SEWAGE TREATMENT PLANT AT KANPUR, U.P.
DRAWING TITLE :
DIMENSIONAL & REINFORCEMENT DETAILS OF CHAMBER-1 & 4
BYPASS LINE-1 & 2
Drawn by: P.P.K Approved by : U.M.S Scale :1:100 SHEET: A1
Checked by: D.R.S Date : 07/10/2022 Status : FOR APPROVAL
Drawing no: KRMPL/BING-210 MLD/STP/CHAMBER-4/P-A01 Rev: R0 SHEET 01
ALL RIGHT S RESERVED ! This drawing and the information contained their in is the property of SHAPOORJI PALLONJI Mumbai No part of this drawing may be reproduced, store d in a retrieval sy stem,
or tr ansmitted in any f orm, or by any me ans, electronic, mechanical, photocopying, recording or otherwise, without t he prior per mission of t he cop yright holder.