Activity ID

Signals
Phase 1A
Phase 1B
Phase 2A
Phase 2B
Phase 2C
Phase 2D
F12.2D.010
F12.2D.050
F12.2D.040
F12.2D.030
F12.2D.020
F12.2D.060
F12.2D.070
F12.2D.080
Phase 3A
F13.3A.010
Phase 3B
F14.3B.010
F14.3B.020
Phase 3C
F15.3C.010
F15.3C.020
F15.3C.030
F15.3C.040
F15.3C.050
F15.3C.060
Phase 4A
F16.4A.020
F16.4A.010
F16.4A.030
F16.4A.040
F16.4A.050
F16.4A.060
Phase 4B
F17.4B.010
Phase 4C
I2.4C.010
F18.4C.010
F18.4C.020
F18.4C.030
F18.4C.040
F18.4C.050
F18.4C.060
F18.4C.070
F18.4C.080
F18.4C.090
F18.4C.100
F18.4C.110
Phase 5
F19.05.005
F19.05.010
Phase 6
F20.06.010
F20.06.020
F20.06.030
F20.06.040
F20.06.050
Activity Name At Complet

769
28
172
1
1
2
60
Install 577/578 Bungalow at Spur 3 (Mi 57.93) [actual dates] 2
Relocate Power Service [name corrected; actual dates] 1
Install SCC and Cable for Turnouts at Spurs 2 and 3 (Mi 57.86, 57.93) [actual dates] 2
Install, Tag, Terminate Signal Cables at Cantilever Signal (PCN 43) [actual start] 18
Install Cantilever #1 Signals 577N, 578N, 577S, 578S (PCN 43) 5
Phase 2D: Complete SAT Testing 5
Phase 2D: Testing and Commissioning 5
Phase 2D: Remove and Dispose of Redundant Equipment 5
5
Remove and Return SCC (Mi 56.97) 5
9
Remove and Return SCC (Mi 56.65) 4
Relocate and Test Existing Cantilever #3 for Future South Track 5
29
Install Progress Ave Bungalow (Mi 56.72) 5
Relocate, Test Exist Cantilever #2 and Gate #1 for Future North Track 5
Install, Tag, Terminate Signal Cables at Progress Ave Bungalow (Mi 56.72) 5
Install SCC for Turnout (Mi 56.92) 5
Phase 3C: Complete Testing and Commissioning 5
Phase 3C: Remove and Dispose of Redundant Equipment 4
396
Install Marilyn Ave Bungalow (Mi 55.44) [actual dates] 2
Install and Test SCC for South Track Turnouts (Mi 56.13A, 55.99B) 5
Relocate, Test Existing Gate #1 at Marilyn Ave for Future North Track 5
Install, Tag, Terminate Signal Cables at Marilyn Ave Bungalow (Mi 55.44) 5
Phase 4A: Complete Testing and Commissioning 4
Phase 4A: Remove and Dispose of Redundant Equipment 5
5
Install and Test SCC for North Track Turnouts (Mi 56.13B, 55.99A) 5
453
Install Gas Line within rail corridor (to Crossover Turnouts) 10
Install Highland Bungalows (Mi 56.20, 55.90, for Crossovers) 5
Install Wayside Controlled Signals (562S, 562N, 559S, 559N, for Crossovers) 5
Install and Test Switch Machines (4 count for Crossover Turnouts) 5
Install and Test Snow Blowers (4 count for Crossover Turnouts) 5
Install Antenna System incl Radio Tower at Highland Interlocking 5
Install, Tag, Test Cables at Highland Interlocking 5
Supply and Install Power Service to Highland Bungalows 5
Relocate Exist Signals and Bungalow (from Mi 55.18 to Mi 54.89) 5
Phase 4C: Complete SAT Testing 5
Phase 4C: Complete Testing and Commissioning 4
Phase 4C: Remove and Dispose of Redundant Equipment 5
5
Phase 5: Complete SAT Testing 5
Test and Commission: place new North Track into Service (Mi 59.20 to 55.90) 5
7
Install Signal Heads at Exist Hagerman Interlocking (Mi 50.94) 2
Install Signal Heads at Exist Underwood Interlocking (Mi 52.09) 2
Modify Wiring at Exist Hagerman Interlocking (Mi 50.94) 2
Modify Wiring at Exist Underwood Interlocking (Mi 52.09) 2
Complete Testing and Commissioning of Signals 5
Start Finish Actual start Actual Finish

01-May-19 A 24-May-22
17-May-19 A 26-Jun-19 A
01-May-19 A 7-Jan-20
23-Aug-19 A 23-Aug-19 A
23-Aug-19 A 23-Aug-19 A
09-Sep-19 A 10-Sep-19 A
30-Jul-19 A 24-Oct-19
30-Jul-19 A 31-Jul-19 A
23-Aug-19 A 23-Aug-19 A
06-Sep-19 A 09-Sep-19 A
09-Sep-19 A 2-Oct-19
25-Sep-19 1-Oct-19
3-Oct-19 9-Oct-19
10-Oct-19 17-Oct-19
18-Oct-19 24-Oct-19
19-Mar-20 25-Mar-20
19-Mar-20 25-Mar-20
26-Mar-20 7-Apr-20
26-Mar-20 31-Mar-20
1-Apr-20 7-Apr-20
16-Apr-20 27-May-20
16-Apr-20 22-Apr-20
23-Apr-20 29-Apr-20
30-Apr-20 6-May-20
7-May-20 13-May-20
14-May-20 21-May-20
22-May-20 27-May-20
07-Aug-19 A 4-Mar-21
07-Aug-19 A 08-Aug-19 A
29-Jan-21 4-Feb-21
5-Feb-21 11-Feb-21
12-Feb-21 19-Feb-21
22-Feb-21 25-Feb-21
26-Feb-21 4-Mar-21
28-Jan-22 3-Feb-22
28-Jan-22 3-Feb-22
6-May-20 24-Feb-22
6-May-20 20-May-20
28-Jan-22 3-Feb-22
28-Jan-22 3-Feb-22
28-Jan-22 3-Feb-22
28-Jan-22 3-Feb-22
28-Jan-22 3-Feb-22
28-Jan-22 3-Feb-22
28-Jan-22 3-Feb-22
28-Jan-22 3-Feb-22
4-Feb-22 10-Feb-22
11-Feb-22 16-Feb-22
17-Feb-22 24-Feb-22
13-May-22 19-May-22
13-May-22 19-May-22
13-May-22 19-May-22
13-May-22 24-May-22
13-May-22 16-May-22
13-May-22 16-May-22
13-May-22 16-May-22
13-May-22 16-May-22
17-May-22 24-May-22