Professional Documents
Culture Documents
Adhie W Saputra
2017
PROJECT SUMMARY
Location Petasia District, TiuVillage
North Morowali Regency,
Central Sulawesi,
Indonesia
Size of Area 5,482 Ha
License Type Clean & Clear License
Ownership PT. Cahaya Murni Sejahtera
Exp. & Resources 660 Ha (already has been explore and drill with spatial 400 m
Exploration Result :
Ore 19.962.229 Ton
OB 27 Million Ton
Ni 1.82% (Average)
Fe 16%
Stripping Ratio 1.36
Makassar - Sorowako
12 Hours by Land or 1 Hours by Plane
Sorowako Sorowako - Tiu
3-4 Hours by Land
SITE LOCATION
N
From Kolonodale to PT CMS location
about 30 minutes (20 km)
PT CMS
LOCATION
NUHA
VILLAGE
Cross the Matano lake to Nuha
village, about 45 minutes
SOROWAKO
DRILL MAP
DRILL SECTION
PROSPECT AREA
Prospect 1
Prospect 2
SITE PLAN – BASE DESIGN
Boundary 5,482 Ha
Prospect 1
Infrastructure is cover :
• Site Office
• Mess for Staff Employee
• Lab Analysis
• Bath Room, Toilet, Etc
Supporting infrastructure for mining, such as Road and Jetty will be maintained. Jetty
that will be used is owned by PT Itamatra or PT SPS.
Of course we will intersect also with some community land, then it takes a separate
budget for land acquisition.
Office supplies, such as; Desk-Chairs, Laptops, PCs, Printers, stationery, etc. Should be
prepared for work to work well and smoothly.
PRODUCTION COST
The first activity is Land Clearing, covering Tree Cutting & Stripping.
With the condition of the original location, this must be done, because the Ore is in the
subterranean layer cover (OB). In addition, this stripping is done to maintain the quality
of Ore so as not to mix with OB material.
Stripping process will also be supervised by Geologist / Grade Controller.
Production of Ore, is the main work in the Nickel ore mining process.
Supervised by Geologist / Grade Controller and Supervisor Operation, to be mutually
coordinated in determining good and quality mining method.
Loading Barge, proses pemuatan ore ke tongkang, diawasi langsung oleh Master Loading
(Jetty).
ROYALTY & OTHER COST - SUMMARY
COST ANALYSIS - YEARLY
PARAMETERS
INITIAL CAPITAL
PRODUCTION COST SUMMARY
CASH FLOW – YEARLY ( 5 YEARS)