Title : Crystallizer feed tank datasheet
Continental Gold Buritica Mine Water
Project :
Treatment Project
Customer : Continental Gold Inc 4 4‐Jan‐18 Fourth Issue ASK SG SG
Location : Antioquia Buritica, Colombia 3 6‐Jul‐17 Third Issue ASK SG SG
Job # : P‐30066 2 19‐Apr‐17 Second Issue ASK SG SG
Document# : P‐30066‐SP‐BE‐CrystallizerFeedTank‐C 1 31‐Mar‐17 First Issue ASK SG SG
Issue# Date Description Prepared Checked Approved
Revision History
Issue# Comment Remark
1 First Issue
2 Second Issue, Issued For Procurement
3 Third Issue Vendor Drawing Included
4 Fourth Issue Final Vendor Drawing Included
10
11
12
13
CERTIFIED
14
Continental Gold Buritica Mine Water
PROJECT:
Treatment Project
CUSTOMER: Continental Gold Inc 4 4‐Jan‐18 Fourth Issue ASK SG SG
LOCATION: Antioquia Buritica, Colombia 3 6‐Jul‐17 Third Issue ASK SG SG
JOB: P‐30066 2 19‐Apr‐17 Second Issue ASK SG SG
DOC: P‐30066‐SP‐BE‐CrystallizerFeedTank‐C 1 31‐Mar‐17 First Issue ASK SG SG
Issue Date Details By Checked Approved
Tag: 6100‐TK‐180
P & ID Ref: P‐30066‐DW‐AE‐ICD001P5‐H Crystallizer Feed Tank
For AIC Internal use‐
Quantity 1 Sales Order No: 30066
Design Code ASME RTP‐1 Sales Item No: 540
Manufacturer Precision Engineering SAP Matl. No: XICDFRPTK01
Phase Number 777
Tank Bottom Flat Bottom (See sketch on Next page)
Top Head Dome Top
Process Fluid Recovery RO Reject Water
Specific Gravity 1.00
Design Temperature Range Minimum 14°C; Maximum 43.33°C
Operating Temperature Range Minimum 18°C; Maximum 24°C
Design Pressure Atmospheric + Static Head of Water
Operating Pressure Atmospheric + Static Head of Water
Material FRP
Resin Corrosion Liner : Swancor 901‐3 Clear; Structural :Swancor 901‐3 Grey (Note‐4,5,6)
Cure System MEKP ‐ Cobalt
Veil C Glass
Inner Surface shall be a reinforced resin rich lamination. The combined thickness of Inner surface and Interior
Corrosion Resistant Barrier
lamination shall not be less than 0.10 inch.
Surface Hardness Barcol Hardness is 35
Tensile Strength satisfactory for 93 Deg C (200 Deg F) Continuous
Heat Resistance
Tensile Strength satisfactory for 99 Deg C (210 Deg F) Transient
Abrasion resistance Taber Test; 55 mg lost per 1,000 cycles
Live Loads Per P‐30066‐RA‐BE‐NONMETALLICTANKS‐C
Wind Load Per P‐30066‐RA‐BE‐NONMETALLICTANKS‐C
Seismic Zone or Parameters Per P‐30066‐RA‐BE‐NONMETALLICTANKS‐C
Snow Loads Not Applicable
Tank Diameter 1.2192m (4ft)
Tank Straight Shell 2.0574m (6.75ft)
Capacity (Working) 1.5 m3
Nozzles:
Inlet Nozzle N1 2", ANSI Class 150, FF, FRP Plate Gusseted with 6" Projection(Note‐8). (on Side)
Overflow Nozzle (N2) 4", ANSI Class 150, FF, FRP Plate Gusseted with 6" Projection(Note‐8). (on Side)
Drain Nozzle ( N3 ) 2", ANSI Class 150, FF, FRP Plate Gusseted with 6" Projection(Note‐8). (on Side)
Outlet Nozzle (N4) 3", ANSI Class 150, FF, FRP Plate Gusseted with 6" Projection(Note‐8). (on Side)
LIT Nozzle (N5) 2", ANSI Class 300, FF, FRP Plate Gusseted with 6" Projection(Note‐8). (on Side)
Vent, Goose Neck w/ Bird Screen/w Bird
4", ANSI Class 150, FF, FRP Plate Gusseted with 6" Projection(Note‐8). (On Top)
Screen (N6)
Recycle Inlet Nozzle N7 2", ANSI Class 150, FF, FRP Plate Gusseted with 6" Projection(Note‐8). (on Side)
Spare (N8) 2", ANSI Class 150, FF, FRP Plate Gusseted with 6" Projection(Note‐8). W/ Blind Flange (on Side)
Manway (M1) 24", ANSI Class 150, FF, FRP Plate Gusseted with 6" Projection(Note‐8). W/ Blind Flange, Davit (on Side)
Continental Gold Buritica Mine Water
PROJECT:
Treatment Project
CUSTOMER: Continental Gold Inc 4 4‐Jan‐18 Fourth Issue ASK SG SG
LOCATION: Antioquia Buritica, Colombia 3 6‐Jul‐17 Third Issue ASK SG SG
JOB: P‐30066 2 19‐Apr‐17 Second Issue ASK SG SG
DOC: P‐30066‐SP‐BE‐CrystallizerFeedTank‐C 1 31‐Mar‐17 First Issue ASK SG SG
Issue Date Details By Checked Approved
Baffles NA
Tank Support Tie Downs Lug support (Qty to be decided by Vendor)
Pipe Support Clips Required
Installation Location Outdoor
Color Manufactures Standard (Note‐7)
Stairway & Platform NA
Ladder NA
Lifting Lugs By Manufacturer
Hold Down Lugs By Manufacturer
Hardware A193 Gr B7/ ZP Studs w/ A194 Gr. 2H/ZP Nut and Washers
Gaskets EPDM/ Mfg. Std. compatible for Process fluid
Insulation NA
Name plate Required
Notes:
1) Vendor to comply with requirements given in the datasheet and Requisition attachments P‐30066‐RA‐BE‐NONMETALLICTANKS‐C. Any deviations to be immediately
informed to Aquatech.
2) '***' Marked data to be furnished by vendor with quote.
3) Refer sketch on Next Page. Nozzle locations shown are indicative. For Construction and Site Installation refer Vendor drawing
4) Water Chemistry(Concentration is indicated in ppm as Ion):
Recover RO Reject Water:‐Calcium=171.28mg/l;Magnesium=69.30mg/l;Sulfate=34,327.78mg/l;Silica total=0mg/l;Nitrate=32.70mg/l as N;Ammonia=0mg/l as N;
Chloride=29,181.08mg/l; Sodium=35,206.26mg/l; Potassium=96.75mg/l; TDS=99,586.54mg/l;Hardness=7,555 mg/L as Ca CO3 ;Barium=0.00mg/l;
Strontium=0mg/l;Fluoride=28.11mg/l;Bromide=0mg/l; pH=8.29
5) Vendor to ensure the Resin & resin structural material used is compatible for the given fluid, temperature and pressure conditions.
6) Resin shall not have an HDT(Heat Distortion Temperature) less than 85°C (185 °F).
7) External surface of the tank to have UV Inhibitors for improved weather resistance.
8) For All Nozzles bolt holes to straddle the principal centerlines. Gusset shall extend from the flange OD to the Tank wall.
9) Tank drain nozzle to be as low as possible on shell. Nozzle should be able to support a load of 25LB at the end of the nozzle.
10) Vendor to furnish number of Anchors, bolt circle and size bolt required.
11) Vendor to support the down comer(if any) adequately to prevent it from movement/vibration.
12) Deleted. Nozzle Loads:‐ All nozzle shall to be capable of withstanding the load of 800N.
13) Vendor to provide the following documents:
a) GA drawing for the Tank (Within 2 weeks of PO Placement)
b) Instruction/Installation Manual
c)The Tank vendor design drawing and documentation shall show complete design data including the following as a minimum:
Overall tank dimensions, Elevation and plan view, Orientation, Center of Gravity, MOC of tank, Wall thicknesses, Laminate sequences of all FRP Layups, Tank capacity, Tank
weight(Empty & Operating), Name plate Details, Testing and Inspection data, Tank restraint and hold down details, Specific Gravity of contents, Design Temperature and
pressure, reference codes and standards, Seismic, Wind and Snow load requirements and applicable tolerances as a minimum.
DESIGN DATA NOZZLE SCHEDULE TH17521-7 D-17521-7 2
N6 N2
N3
N1 N5
303 NANTUCKET BLVD. SCARBOROUGH, ONTARIO ALL NOZZLE PROJECTION IS FROM INSIDE OF TANK
AQUATECH
PURCHASE ORDER EQUIP. NO.
400002174 CRYSTALLIZER FEED TANK 6100-TK-180 BLIND FLANGES & COVERS
DESCRIPTION 4'-0" x 6'-9" STRAIGHT SIDE TANK
VENT DETAIL
WORKG. PRESS. ATMOSPHERIC WORKG. TEMP. AMBIENT
QUALITY CONTROL
N O T E S: N6
CARBON STEEL
TANK REQUIREMENTS
STANDARD TANK HANDLING INSTRUCTIONS
LIFTING LUG DETAIL DETAIL OF SIDE MANWAY
INSIDE ATTACHMENT
54[2 1/8"]
REF
102[4"]
102[4"] N8 N7 N1
N2
76[3"]
50[2"]
ATTACHMENT
tCL
127[5"]
64[2 1/2"]
SLOT M1
tS
64[2 1/2"]
N3 N4
CERTIFIED
127[5"] 270[10 5/8"]
BY:..........................................
DATE: ...................................
tS+tB = 1/2"
- THE TANK IS TO BE ANCHORED TO 4k PSI REINFORCED PAD.
- CHEMICAL EPOXY BONDED STYLE ANCHORS TO BE USED @ MINIMUM DO NOT SCALE THIS DRAWING
USE DIMENSIONS ONLY
PRESSURE IS TO BE PUT ONTO TANK, AS OUTLINED IN THE DESIGN
- TANK MUST BE ANCHORED TO CONCRETE PAD FOR ANY TEST
tB
ELEVATION
TUBE TYPE
KNUCKLE DETAIL
HOLD DOWN LUG DETAIL 400002174 TH17521-7 D-17521-7 2