Casing, liner and tubing are designed on the well completion canvas.
Casing is set from the wellhead, or from the well top, reaching the required
depth. A liner is similar to a casing but does not extend to the wellhead.
Instead it hangs on the innermost casing. Tubing is used to reduce the flow
cross-sectional area and is set inside the casing. Packers are used to isolate
the annulus (space between the wellbore and casing or between casing and
tubing) from the production conduit. Three well tests allow the properties
of the well to be adjusted given measured input data.
Some wells are equipped with flow control items and artificial lift
equipment to enhance flow performance. These items include chokes,
inflow valves, gas lift valves and pumps.
1
3D Geological Modeling Chapter 27 – Well Completion
2
3D Geological Modeling Chapter 27 – Well Completion
3
3D Geological Modeling Chapter 27 – Well Completion
4
3D Geological Modeling Chapter 27 – Well Completion
5
3D Geological Modeling Chapter 27 – Well Completion
6
3D Geological Modeling Chapter 27 – Well Completion