Professional Documents
Culture Documents
14
10. Service Air supplies & Cooling water supply at required pressure
12. Permanent lighting in working order at all working levels and operating station
15. Continuous Electric power supplies at specified ratings for drives & instruments
To ensure that:-
a. All guards and safety barriers must be fixed in position before starting any
machinery
b. All stairs, galleries, handrails and grid ways must be firmly fixed in position.
c. All obstructions must be removed from galleries and boiler surrounding
d. Fire Hydrant system & fire extinguisher are installed
Major boiler auxiliaries provided for reliable and efficient operation includes.
o 2 x 100% Boiler feed pumps (1W+1S)
o 2 x 100% Primary air fan (PA)
o 2 x 50% Forced draft fan (FD)
o 2 x 50% Induced draft fan (ID)
o 1 x 100% HP dosing system
o 1 x 100% LP dosing system
o Electrostatic precipitator (ESP)
o Flue Gas Desulfurization (FGD) – Supplied by EPC
o 2 Nos. of Booster fans - Supplied by EPC
o Fuel feeding System
6