You are on page 1of 6

50MW INDUS WIND ENERGY LIMITED

PROJECT WEEKLY HSE REPORT


Reported By: Engr Sarfraz Panhwar Date: 19-Feb-2021
S. No# Item Status PTD Remarks
1 Total Man Hours worked 50030
2 First Aid Case/ Injury Cases 00
3 Near Miss 00
4 Accident 00 -

Progress

Items No. Achievement Descriptions Achievement Time

1 Completed Barricading Of WTG 9 & 10. 1 Day

2 Housekeeping Carried out at Accommodation building. Two hours


3 Conduct Safety Training on Welding, cutting and grinding. 20 minutes
4 Removed raw material from Accommodation building. Daily
5 Update Daily and weekly checklist at site Daily
6 Conduct TBT and maintain record on daily basis. Daily
7 Housekeeping Carried out at Substation building. Two Hours
8 Checked temperature of all employee on daily basis and maintained record. Daily
9 Housekeeping Carried out at batching plant. two hours
10 Inspected Power Tools Two Hours
Main works 11 Maintained all documents daily checklist like housekeeping, permit to work. Daily
achieved this 12 Hard Barricaded boundary wall at Substation. Two Hours
week
13 Safe offloading of WTG Material from camp WTG, 15.16. 2 hours
14 Overall Housekeeping was done at New Chinese & Pakistani Camp. Daily
15 Thirty (30) Goggle Plants Relocated at WTG 10. 1 Day
16 Overall Housekeeping was done at New Chinese & Pakistani Camp. 1 Hour
17 Six Goggle Plants Relocated at WTG 18. 1 Hour
Inspected Welding machine, Compactors, bending, rolling, cutting 1 Hour
18
machine.
19 Inspection of FE was conducted at batching plant, campand office area. Two Hours
20 Housekeeping Carried out at Auxiliary building. 1 Hour
21 Monthly inspection of hygiene was carried out. 1 Hour
List of 1 Orientation, Induction, medical and COVID-19 record maintained Daily
Documents / 2 Short Awareness training conducted on weekly basis and maintained record. Weekly
inspection 3 Conduct TBT daily basis and update checklists 20 minutes
reports / 4 Arranged MSDS of hazardous chemicals 1 days
training / 5 Maintained Temperature Record on daily basis 15 minutes
other reports Issued two work permits for Concrete Pouring of plinth beam at control 30 minutes
completed 7
building.
this week
8 Issued two work permits for lifting of new batching plant shallow. 15 minutes
50MW INDUS WIND ENERGY LIMITED

9 Maintained Housekeeping. 10 minutes


Maintained and Submitted work permits of Lifting, concrete pouring 15 minutes
10
activities.
Maintained weekly checklist of equipment’s (loader, excavator, crane, Weekly
11
Generator, welding machine.
1 Conduct training about Welding, cutting, grinding.
2 Overall Housekeeping inside and outside New camp of indus.
3 Hard Barrication Of Substation wall.
4 Erected waste yard beside new camp of Indus site.
Compliance 5 Completed Barricading Of WTG 9,10
to client 6 Pasted safety Signs and posters at New Chinese & Pakistani Camp.
7 Erected Resting shelter for workers at Substation and WTG.
9 Overall Housekeeping was done at New Chinese & Pakistani Camp.
10 Thirty (30) Goggle Plants Relocated at WTG 10.
11 Six (06) Goggle Plants Relocated at WTG 18.
Unfinished Work Descriptions
1 Waste management handling disposal method and contract.
2 Hard barrication of remaining WTG.
3 To Past Safety Sings and posters at Remaining Areas.
4 To arrange Fire Extinguishers for required locations.
5 To Arrange Segregation Drums for waste material.
6 Relocate goggle plants from 13, 14 WTG.
7 To Install Signs and posters at Pakistani camp.
8 To conduct Training of Operators and drivers.
9 To Arrange Segregation Drums for waste material.
11 Waste segregation and removing of garbage.
HSE Observations / Issues
1 Housekeeping & Material stacking.
2 Incomplete working platforms.
3 Water sprinkling required on daily basis.
4 Noncompliance of PPE’s
5 Poor cable management.
Next Week Work Plan

1 To Conduct Job Specific Safety Training.

2 Relocate goggle plants from 9, 10 WTG.

Main Works 3 To Conduct TBT, And two weekly trainings.

4 To Conduct TBT on daily basis and maintain temperature record.

5 To Arrange Segregation Drums for waste material.


50MW INDUS WIND ENERGY LIMITED

6 To Arrange short Awareness session on behavioral based safety.

To arrange housekeeping campaign with Site workers as well management staff at batching
7
plant area.
8 To remove boulders from edges of all WTG’s.

9 To arrange housekeeping of WTG’s.

10 To submit a report of relocated Google plants from WTG’s.

11 To Relocate google plants from WTG 13 & 14.

1 Conduct TBT and daily record.


2 Maintain housekeeping
Routine Work
3 Hard barrication at every WTG
4 Labor Advising
5 Rectify all observation highlighted by client
6 Hand Tools & Power Tools inspection will be conducted on daily basis.

SITE HSE PICTURE:


50MW INDUS WIND ENERGY LIMITED

TBT and Daily Temperture checking evidance Conducting Daily TBT

Smoking Area at Pakistan Provided clean water for site.

Inspected Compactors Removing heavy boulders From Walk way.


50MW INDUS WIND ENERGY LIMITED

Housekeeping around control building Barrication Of Auxiliary Building

Underground the Cable which was scattered in walkway Removing Scraped Iron bars into scrape Area.
50MW INDUS WIND ENERGY LIMITED

Relocated 30 goggle plants at WTG 10 and Relocated 06 goggle plants at WTG 18


Barricaded plants with Stone marking in order to avoid Damage.

You might also like