With reference to his letter No. 1691/ 1-W Dated: With reference to his letter No. 1691 / 1-W Dated:
22-12-2014 has the honor to return duly sanctioned 22-12-2014 has the honor to return duly sanctioned
The revised estimate of the probable cost for The revised estimate of the probable cost for
Applying Khanki Mixture/Epoxy Paint to Hydraulic Applying Khanki Mixture/Epoxy Paint to Hydraulic
Gates in Goraya Sub Division, Daska Gates in Goraya Sub Division, Daska
(Rupees: One lac sixty seven thousand Six Hundred (Rupees: One lac sixty seven thousand Six Hundred
Chargeable to head: A13401 Main Canal. Chargeable to head: A13401 Main Canal.
DA Executive Engineer,
DA Executive Engineer, As above Pasrur Link Division,
As above Pasrur Link Division, Sialkot
Sialkot
PUBLIC WORKS DEPARTMENT PUBLIC WORKS DEPARTMENT
IRRIGATION BRANCH IRRIGATION BRANCH
From From
To To
With reference to his letter No. 1668 / 1-W Dated: With reference to his letter No. 1669 / 1-W Dated:
27-11-2014 has the honor to return duly sanctioned 27-11-2014 has the honor to return duly sanctioned
The estimate of the probable cost for The estimate of the probable cost for
OILING GREASING TO GATES AND GEARINGS IN OILING GREASING TO GATES AND GEARINGS IN
GORAYA SUB DIVISION DASKA. GORAYA SUB DIVISION DASKA.
(Rupees: Thirty Three thousand Three Hundred & (Rupees: Thirty Three thousand Three Hundred &
Chargeable to head: A13401 Main Canal. Chargeable to head: A13401 Main Canal.
DA Executive Engineer,
As above Pasrur Link Division, DA Executive Engineer,
Sialkot As above Pasrur Link Division,
Sialkot
PUBLIC WORKS DEPARTMENT PUBLIC WORKS DEPARTMENT
IRRIGATION BRANCH IRRIGATION BRANCH
From From
To To
With reference to his letter No. 336 / 1-W Dated: With reference to his letter No. 336 / 1-W Dated:
31-12-2014 has the honor to return duly sanctioned 31-12-2014 has the honor to return duly sanctioned
The estimate of the probable cost for The estimate of the probable cost for
REPAIRING U/S FLARED OUT WALLS OF SYPHON REPAIRING U/S FLARED OUT WALLS OF SYPHON
R.D 134+500 M.R LINK CANAL. R.D 134+500 M.R LINK CANAL.
Amounting to Rs. 299381/- Amounting to Rs. 299381/-
(Rupees: Two lac Ninety Nine Thousand Three (Rupees: Two lac Ninety Nine Thousand Three
Hundred and Eighty one Only) Hundred and Eighty one Only)
Chargeable to head: A13401 Main Canal. Chargeable to head: A13401 Main Canal.
DA Executive Engineer,
As above Pasrur Link Division, DA Executive Engineer,
Sialkot As above Pasrur Link Division,
Sialkot
PUBLIC WORKS DEPARTMENT PUBLIC WORKS DEPARTMENT
IRRIGATION BRANCH IRRIGATION BRANCH
From From
To To
With reference to his letter No. 1671 / 1-W Dated: With reference to his letter No. 1671 / 1-W Dated:
27-11-2014 has the honor to return duly sanctioned 27-11-2014 has the honor to return duly sanctioned
The estimate of the probable cost for The estimate of the probable cost for
REPAIRING DAMAGED LEFT SIDE FLARED OUT WALL REPAIRING DAMAGED LEFT SIDE FLARED OUT WALL
OF FALL RD.91+400 OF BRBD LINK CANAL. OF FALL RD.91+400 OF BRBD LINK CANAL.
(Rupees: One Lac Ninety Six thousand One Hundred (Rupees: One Lac Ninety Six thousand One Hundred
Chargeable to head: A13401 Main Canal. Chargeable to head: A13401 Main Canal.
DA Executive Engineer,
As above Pasrur Link Division, DA Executive Engineer,
Sialkot As above Pasrur Link Division,
Sialkot
PUBLIC WORKS DEPARTMENT PUBLIC WORKS DEPARTMENT
IRRIGATION BRANCH IRRIGATION BRANCH
From From
To To
With reference to his letter No. 81 / 3-W Dated: With reference to his letter No. 81 / 3-W Dated:
20-09-2014 has the honor to return duly sanctioned 20-09-2014 has the honor to return duly sanctioned
The estimate of the probable cost for The estimate of the probable cost for
Dak Running Charges from Divisional office Sialkot Dak Running Charges from Divisional office Sialkot
to Lahore and Sub Divisions for period from to Lahore and Sub Divisions for period from
1.07.2014 to 30.06.2015 1.07.2014 to 30.06.2015
(Rupees: Two Lac Seventeen thousand and two (Rupees: Two Lac Seventeen thousand and two
DA Executive Engineer,
As above Pasrur Link Division, DA Executive Engineer,
Sialkot As above Pasrur Link Division,
Sialkot
PUBLIC WORKS DEPARTMENT PUBLIC WORKS DEPARTMENT
IRRIGATION BRANCH IRRIGATION BRANCH
From From
To To
With reference to his letter No.__________ / 1-W With reference to his letter No.__________ / 1-W
return duly sanctioned and registered in this office. return duly sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
OILING & GEARING TO GATES AND GEARING OILING & GEARING TO GATES AND GEARING
SYSTEM ON M.R.LINK CANAL. SYSTEM ON M.R.LINK CANAL.
(Rupees: Two Lac Four thousand One hundred & (Rupees: Two Lac Four thousand One hundred &
From From
To To
With reference to his letter No. 192 / 3 W With reference to his letter No. 192 / 3 W
Dated: 08 / 03 / 2014 has the honor to return duly Dated: 08 / 03 / 2014 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
REPAIRING OUTLETS IN DASKA SECTION (REV) OF REPAIRING OUTLETS IN DASKA SECTION (REV) OF
(Rupees: Two lac seventy eight thousand four (Rupees: Two lac seventy eight thousand four
hundred & thirty two only) hundred & thirty two only)
From From
To To
With reference to his letter No. 193 / 3-W With reference to his letter No. 193 / 3-W
Dated: 08/03/2014 has the honor to return duly Dated: 08/03/2014 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
RESTORING APRON D/S NULLAH OF AIK RESTORING APRON D/S NULLAH OF AIK
SUPERPASSAGE AT R.D 90+190 M.R LINK CANAL. SUPERPASSAGE AT R.D 90+190 M.R LINK CANAL.
From From
To To
With reference to his letter No. 57 / 1-W With reference to his letter No. 57 / 1-W
Dated: 07/03/2014 has the honor to return duly Dated: 07/03/2014 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
REPAIRING WING WALLS OF FALL RD 249+850 OF REPAIRING WING WALLS OF FALL RD 249+850 OF
From From
To To
With reference to his letter No. 191 / 3-W With reference to his letter No. 191 / 3-W
Dated: 08/03/2014 has the honor to return duly Dated: 08/03/2014 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
REPAIRING TEMPERED AND DEFECTIVE OUTLETS IN REPAIRING TEMPERED AND DEFECTIVE OUTLETS IN
(Rupees: Two lac ninety eight thousand five hundred (Rupees: Two lac ninety eight thousand five
From From
To To
With reference to his letter No. 67 / 1-W With reference to his letter No. 67 / 1-W
Dated: 14/03/2014 has the honor to return duly Dated: 14/03/2014 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
RESECTIONING OF TALWANDI DISTY R.D 0+000 TO RESECTIONING OF TALWANDI DISTY R.D 0+000 TO
6+000 6+000
(Rupees: Two lac twelve thousand eight hundred & (Rupees: Two lac twelve thousand eight hundred &
From From
To To
With reference to his letter No. 349 / 3-W With reference to his letter No. 349 / 3-W
Dated: 04/05/2012 has the honor to return duly Dated: 04/05/2012 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
RAWAL LINK SUB DIVISION, SIALKOT. RAWAL LINK SUB DIVISION, SIALKOT.
(Rupees: Fifty Four Thousand Six Hundred & Ninety (Rupees: Fifty Four Thousand Six Hundred & Ninety
From From
To To
With reference to his letter No. 03 / 1-W With reference to his letter No. 03 / 1-W
Dated: 10/01/2012 has the honor to return duly Dated: 10/01/2012 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
FOR CAMP AT JASTIWALA FLOOD PROTECTION FOR CAMP AT JASTIWALA FLOOD PROTECTION
(Rupees: Ninety Nine Thousand Nine Hundred & (Rupees: Ninety Nine Thousand Nine Hundred &
From From
To To
With reference to his letter No. 21 / 1-W With reference to his letter No. 21 / 1-W
Dated: 18/02/2012 has the honor to return duly Dated: 18/02/2012 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
REPAIRING WEAK / DEPRESSION SITE BETWEEN REPAIRING WEAK / DEPRESSION SITE BETWEEN
RD 0+0000 TO 15+000 RIGHT ON DEG NALLAH RD 0+0000 TO 15+000 RIGHT ON DEG NALLAH
FLOOD PROTECTION BUND (FROM DHIR PIR FLOOD PROTECTION BUND (FROM DHIR PIR
(Rupees: Ninety Nine Thousand Eight Hundred & (Rupees: Ninety Nine Thousand Eight Hundred &
From From
To To
With reference to his letter No. 20 / 1-W With reference to his letter No. 20 / 1-W
Dated: 18/02/2012 has the honor to return duly Dated: 18/02/2012 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
REPAIRING WEAK SITE / DEPRESSION ON DEG REPAIRING WEAK SITE / DEPRESSION ON DEG
NALLAH FLOOD PROTECTION BUND FROM DHIR PIR NALLAH FLOOD PROTECTION BUND FROM DHIR PIR
MUHAMMAD TO CHAK RAJA LEFT IN TEHSIL MUHAMMAD TO CHAK RAJA LEFT IN TEHSIL
(Rupees: Eighty Six Thousand & Thirty Five Only) (Rupees: Eighty Six Thousand & Thirty Five Only)
From From
To To
With reference to his letter No. 106 / 1-W With reference to his letter No. 106 / 1-W
Dated: 02/05/2012 has the honor to return duly Dated: 02/05/2012 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
PROVIDING RD MARKS ON MR LINK CANAL IN TAIL PROVIDING RD MARKS ON MR LINK CANAL IN TAIL
(Rupees: Thirty Thousand Seven Hundred & Seven (Rupees: Thirty Thousand Seven Hundred & Seven
Only) Only)
From From
To To
With reference to his letter No. 09 / 1-W With reference to his letter No. 09 / 1-W
Dated: 25/01/2012 has the honor to return duly Dated: 25/01/2012 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
PAINTING AND WRITING GAUGES OF STRUCTURES PAINTING AND WRITING GAUGES OF STRUCTURES
(Rupees: Ninety Six Thousand Six Hundred & Ninety (Rupees: Ninety Six Thousand Six Hundred & Ninety
Seven) Seven)
From From
To To
With reference to his letter No. 109 / 1-W With reference to his letter No. 109 / 1-W
Dated: 11/05/2012 has the honor to return duly Dated: 11/05/2012 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
REPAIRING DAMAGED STONE PITCHING OF RIGHT REPAIRING DAMAGED STONE PITCHING OF RIGHT
FLOOD PROTECTION BUND ALONG DEG NALLAH FLOOD PROTECTION BUND ALONG DEG NALLAH
FROM DIR PIR MUHAMMAD TO CHAK RAJA RD FROM DIR PIR MUHAMMAD TO CHAK RAJA RD
8500-10500/RIGHT. 8500-10500/RIGHT.
(Rupees: Ninety Nine Thousand Four Hundred & (Rupees: Ninety Nine Thousand Four Hundred &
From From
To To
With reference to his letter No. 93 / 1-W With reference to his letter No. 93 / 1-W
Dated: 19/04/2012 has the honor to return duly Dated: 19/04/2012 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
(Rupees: Tow Lac Twenty Two Thousand Nine (Rupees: Tow Lac Twenty Two Thousand Nine
Hundred & Forty Six Only) Hundred & Forty Six Only)
From From
To To
With reference to his letter No. ______ / 1-W With reference to his letter No. ______ / 1-W
Dated: ________________ has the honor to return Dated: ________________ has the honor to return
duly sanctioned and registered in this office. duly sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
REPAIRING WEAK / DEPRESSION SITES BETWEEN REPAIRING WEAK / DEPRESSION SITES BETWEEN
RD 6+000 TO 12+000 RIGHT FLOOD PORTECTION RD 6+000 TO 12+000 RIGHT FLOOD PORTECTION
BUND D/S HANJLI BRIDGE ON DEG NALLAH. BUND D/S HANJLI BRIDGE ON DEG NALLAH.
(Rupees: Ninety Nine Thousand Eight Hundred & (Rupees: Ninety Nine Thousand Eight Hundred &
From From
To To
With reference to his letter No. ______ / 1-W With reference to his letter No. ______ / 1-W
Dated: ________________ has the honor to return Dated: ________________ has the honor to return
duly sanctioned and registered in this office. duly sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
REPAIRING WEAK / DEPRESSION SITES BETWEEN REPAIRING WEAK / DEPRESSION SITES BETWEEN
RD 22+000 TO 27+750 LEFT FLOOD PORTECTION RD 22+000 TO 27+750 LEFT FLOOD PORTECTION
BUND U/S HANJLI BRIDGE ON DEG NALLAH. BUND U/S HANJLI BRIDGE ON DEG NALLAH.
(Rupees: Ninety Nine Thousand Five Hundred & Ten (Rupees: Ninety Nine Thousand Five Hundred & Ten
Only) Only)
From From
To To
With reference to his letter No. ______ / 1-W With reference to his letter No. ______ / 1-W
Dated: ________________ has the honor to return Dated: ________________ has the honor to return
duly sanctioned and registered in this office. duly sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
REPAIRING WEAK / DEPRESSION SITES BETWEEN REPAIRING WEAK / DEPRESSION SITES BETWEEN
RD 25+000 TO 29+600 RIGHT FLOOD PORTECTION RD 25+000 TO 29+600 RIGHT FLOOD PORTECTION
BUND D/S KINGRA BRIDGE ON DEG NALLAH. BUND D/S KINGRA BRIDGE ON DEG NALLAH.
(Rupees: Fifty One Thousand Six Hundred & Eighty (Rupees: Fifty One Thousand Six Hundred & Eighty
From From
To To
With reference to his letter No. 318 / 3-W With reference to his letter No. 318 / 3-W
Dated: 25/04/2012 has the honor to return duly Dated: 25/04/2012 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
REPAIR TO JAMKE REST HOUSE AT RD 114+000 REPAIR TO JAMKE REST HOUSE AT RD 114+000
(Rupees: Thirty Seven Thousand & Sixty Five Only) (Rupees: Thirty Seven Thousand & Sixty Five Only)
From From
To To
With reference to his letter No. 317 / 3-W With reference to his letter No. 317 / 3-W
Dated: 25/04/2012 has the honor to return duly Dated: 25/04/2012 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
UP-KEEPING JAMKE REST HOUSE AT RD 114+000 UP-KEEPING JAMKE REST HOUSE AT RD 114+000
(Rupees: Ninety Eight Thousand Six Hundred & (Rupees: Ninety Eight Thousand Six Hundred &
From From
To To
With reference to his letter No. 130 / 1-W With reference to his letter No. 130 / 1-W
Dated: 11/06/2012 has the honor to return duly Dated: 11/06/2012 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
PROVIDING PLANTS FOR MAINTAINING LAWNS OF PROVIDING PLANTS FOR MAINTAINING LAWNS OF
DEG REST HOUSE RD 220+122 MR LINK CANAL. DEG REST HOUSE RD 220+122 MR LINK CANAL.
(Rupees: Twenty Three Thousand Four Hundred (Rupees: Twenty Three Thousand Four Hundred
Only) Only)
From From
To To
With reference to his letter No. 144 / 1-W With reference to his letter No. 144 / 1-W
Dated: 04/10/2011 has the honor to return duly Dated: 04/10/2011 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
EMPLOYING WORK CHARGE BELDAR ON MR LINK EMPLOYING WORK CHARGE BELDAR ON MR LINK
CANAL IN BADDOMALHI LINK SUB DIVISION, DEG CANAL IN BADDOMALHI LINK SUB DIVISION, DEG
(Rupees: Sixty Three Thousand Only) (Rupees: Sixty Three Thousand Only)
From From
To To
With reference to his letter No. ______ / 1-W With reference to his letter No. ______ / 1-W
Dated: ______________ has the honor to return Dated: ______________ has the honor to return
duly sanctioned and registered in this office. duly sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
PREPARING PC1 FOR CONSTRUCTION OF SIDE PREPARING PC1 FOR CONSTRUCTION OF SIDE
DRAIN ALONG MR LINK CANAL RD 296+100 TO DRAIN ALONG MR LINK CANAL RD 296+100 TO
304+600/LEFT. 304+600/LEFT.
(Rupees: Twenty Seven Thousand Four Hundred & (Rupees: Twenty Seven Thousand Four Hundred &
From From
To To
With reference to his letter No. 64 / 1-W With reference to his letter No. 64 / 1-W
Dated: 13/03/2012 has the honor to return duly Dated: 13/03/2012 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
MAINTAINING SERVICE ROAD REACH RD 228-250/R MAINTAINING SERVICE ROAD REACH RD 228-250/R
(Rupees: Ninety Nine Thousand Seven Hundred & (Rupees: Ninety Nine Thousand Seven Hundred &
From From
To To
With reference to his letter No. 97 / 1-W With reference to his letter No. 97 / 1-W
Dated: 25/04/2012 has the honor to return duly Dated: 25/04/2012 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
(Rupees: Eighty Eight Thousand Five Hundred & (Rupees: Eighty Eight Thousand Five Hundred &
From From
To To
With reference to his letter No. 99 / 1-W With reference to his letter No. 99 / 1-W
Dated: 25/04/2012 has the honor to return duly Dated: 25/04/2012 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
REPAIRING WEAK BANKS OF SHAMSA DISTY. REPAIRING WEAK BANKS OF SHAMSA DISTY.
(Rupees: Thirty One Thousand Eight Hundred & (Rupees: Thirty One Thousand Eight Hundred &
From From
To To
With reference to his letter No. 233 / 1-W With reference to his letter No. 233 / 1-W
Dated: 30/04/2012 has the honor to return duly Dated: 30/04/2012 has the honor to return duly
sanctioned and registered in this office. sanctioned and registered in this office.
The estimate of the probable cost for The estimate of the probable cost for
UP-KEEPING OF DEG REST HOUSE AT RD 220+122 UP-KEEPING OF DEG REST HOUSE AT RD 220+122
MR LINK CANAL IN BADDOMALHI SUB DIVISION. MR LINK CANAL IN BADDOMALHI SUB DIVISION.
(Rupees: Eighty Three Thousand Three Hundred & (Rupees: Eighty Three Thousand Three Hundred &