Solve For Headwater Elevation

Input Data

Discharge 0.855000 m³/s


Crest Elevation 84.3400 m
Tailwater Elevation 84.14 m
Weir Coefficient 1.84 SI
Crest Length 5.0000 m
Number Of Contractions 0

Results
Headwater Elevation 84.55 m
Headwater Height Above Crest 0.21 m
Tailwater Height Above Crest -0.20 m
Flow Area 1.03 m²
Velocity 0.83 m/s
Wetted Perimeter 5.41 m
Top Width 5.00 m

Bentley Systems, Inc. Haestad Methods Solution


Bentley Center
FlowMaster V8i (SELECTseries 1) [08.11.01.03]
9/11/2017 12:40:12 p. m. 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1