You are on page 1of 12

Category ADO Issue Issue Description

Fallas que afectan FPY (relacionado a


FPY Correo Roland MEM_INFO_ERR
problemas de DIMM)

FA for 3 M.2 was sent to Hynix.


Vendor : HYNIX,,
SSD,M.2,NVME,960GB,HYNIX,HFS960GD0FEI
FPY 206272 DISK_NVME_QTY_ERR A430A
Vendor PN: HFS960GD0FEI-A430A
Arrow Case ID: 440000001652
Hynix RMA: 51129866 (3 pieces) .
Part Number: M1143858-001
Tracking Number: 772130200525 --> Material
arrived 11/27
FPY 218425 FAN_QTY_ERR
Hacer visible el proveedor del FAN en API

Failure seen after PWR CAP Improvement.


FPY 408772 RM_CHL_SRV_LOG_ERR Need to provide BIOS version

After consult with MTE about Power Capping


ERR, Ingrasys propose to change the criteria
to "Target Work Load" in the column "D" of
the spread sheet for the blades not using 50%
FPY 201927 RACK_PWR_CAP_ERR for all and make sure we could make sure the
whole power consumption of the rack should
be restrained under 17.2KW during the stress
testing. Already got the approval by MTE and
will phase in as soon as
possible. @judy.yc.cheng please proceed the
code changes and advise the schedule to
PM @Tinker Tsai @damon.yt.hsieh . Thanks.
Citrix switch FW needed to be updated from
9.3 to 12.1 but update could not be
performed directly.

FPY 212716 LB_FT_ERR

FPY 295727 TOR_STS_ERR Upon our initial investigation we found out


that Arista switch counter needed to be
cleared. From the log of one of the units I can
see that Et21/1 the counter was not 0.
OSV NA OSV CPU 1) Descargar software de Intel
2) Set up
OSV NA L1 FA FPGA 1) Crear golden unit/pxie para que guarde los
diagnósticos
DC L1 FA NA FA Coverage
1) Asegurar que

DIMM ADO Commodity


VLRR/PRR Follow Up Preguntar el acceso al Query

https://azurecsi.visualstudio.com/CSCP%20POQ%20Quality/_queries/query/75898e16-8265-4f97-833e-718aa7

NPI https://azurecsi.visualstudio.com/CSCP%20POQ%20Quality/_queries/query/75898e16-8265-4f97-833e-718aa7
NPI ADO Follow Up

Special
Request 1. Test_time_reduce data to1. Test_time_reduce data to Microsoft
Last Update Contacto Owner (Daniel/Arely)

RE MEM_INFO_ERR failures on QT.msg Roland / Matt Lan DL

Preliminary FA Received. Juan y Domingo Seguimiento DL

Validate recent change made by IT and PE Sergio Ramirez Seguimiento DL


(Sergio Ramirez)

Judy / Richard / Matt


Lan Seguimiento DL

Judy / Richard / Matt


Seguimiento DL
Lan
Judy / Richard / Matt
Seguimiento DL
Lan

Judy / Richard / Matt


DL
Lan

2020-10-06 still pending MSFT feedback


Juan y Domingo Seguimiento Arely

Juan/Gera/Adrian/Fr
Seguimiento Arely
ancisco

Francisco Martell Seguimiento DL

Juan y Domingo Seguimiento DL

Daniel Caballero Seguimiento DL

No debe ser QA quien proporcione esta


información, mas no se ha asignado a nadie Seguimiento Arely
mas que conteste. Revisar con Gerardo. Damon Y.T Hsieh
(Ingrasys)
Owner Sugerido

Juan Ramirez

Raul Mercado

Adrian García

Adrian García
Adrian García

Domingo

(Isai Marquez/Juan Ramirez)

Ing de Calidad de Servicios


*Revisar el rol del Martell como OSV

Domingo

PE
Meeting Day Time FMX Owner New Owner

FMX Quality Scorecard Weekly Rev M 9:30 Liliana Acosta Daniel Leon

FMX Operations Meeting TR 8:00 Liliana Acosta Nahim García

Daniel Leon (Soporte de


FMX/FTJ Quality Weekly Meeting T 6:00 PM Liliana Acosta
SQE)

Liliana Acosta
Commodity Quality Interlock Meet T 7:00 PM (Domingo Rodriguez Se cancela
& Francisco Martell)

Weekly SI Sync Meeting T 10:00 AM Liliana Acosta Daniel Leon

Tiger Team Meeting (Report meeti MW 4:30 PM Liliana Acosta Daniel Leon

Tiger Team Meeting (Working meet TR 4:30 PM Liliana Acosta Daniel Leon+PE+TE
Asignación de Prioridades F 2:30 PM Liliana Acosta Daniel Leon

Liliana Acosta (Daniel


NPI MSFT/Ingrasys Weekly Sync R 7:00 PM Caballero & Enrique Daniel Caballero
Salas)

Adrian Yepez,
Ingeniero de Servicios
Weekly Global Service Review-JRZ R 8:00 AM Francisco Martell,
Gerardo López de Calidad
MSFT Contact /Ingrasys
/ FMX Link

Jesus Mata

https://teams.microsoft.com/l/meetup-join/19%3ameeting_OGZhYmU2MzEtMmM4Mi00ZDUwLTll

Luis Artega / Lauro


Campos

https://teams.microsoft.com/l/meetup-join/19%3ameeting_YzI2ZDVmYjktMzA0Yi00Y2JlLWFmYTQt

Nina Kao

https://teams.microsoft.com/l/meetup-join/19%3ameeting_YTVmYjJkYzItMGYyYy00M2U5LThlMjkt

Sylvia Heish

https://teams.microsoft.com/l/meetup-join/19%3ameeting_NzQwZTZiYTMtYzE4Zi00OTEzLWE3OTM

Tim Edwards

https://teams.microsoft.com/l/meetup-join/19%3ameeting_MWU1OWNjYTAtMTI0Ny00ZjkxLTgxM

Ping (Ingrasys team)

https://teams.microsoft.com/l/meetup-join/19:meeting_ZTUwYmFhZmUtODhmYi00ZjdkLTkzODMt

Damon (Ingrasys team)

https://teams.microsoft.com/l/meetup-join/19:meeting_ZTUwYmFhZmUtODhmYi00ZjdkLTkzODMt
FMX IT

https://teams.microsoft.com/l/meetup-join/19%3ameeting_ODFhYjY3ZTktOGI5NC00OWJmLTlhM2

Allison Hughes

https://teams.microsoft.com/l/meetup-join/19%3ameeting_N2ZhZDE1ZDAtM2FiNC00ZmNkLThhOD

Ignaz Huang

https://teams.microsoft.com/l/meetup-join/19%3ameeting_N2U3OTkxOWYtMzRjZC00MzlhLWI2M
Comments

Revisión de métricos semanales de QA MSFT

Se presentan métricos de QA de MSFT

Revisión de FPY e información básica de VLRR

Revisión status de VLRR (DIMMs / M.2 SSD / CPU)

Junta semanal con calidad global y Hungría. No hay que


presentar nada, solo es sync up

Los lunes se presenta el resultado y acciones de FPY de la


semana anterior.
Los miércoles se presenta como va el FPY dentro de esa
semana.

Junta de trabajo. Solo tener update de issues que esten


abiertos
Asignación de CRs con IT

Junta de NPI status con MSFT

Solo participación de QA

You might also like