3H: WORK SCHEDULE

FOR

Feasibility Study of Waste Water Management Project at Khalanga Bazzar, Jajarkot and Lamahi Bazzar,
Dang
Weeks
S. N. Description of Work

Project Week 1 2 3 4 5 6 7 8 9 10 11 12
1 Management of Team
2 Inception Phase/Desk Study
2.1 Collection and Review of Relevant Information
2.2 Desk Study
Review approach, methodology,
2.3
workplan
Field Visit
2.4 Preparation of Inception Report
3 Field Appraisal Phase
3.1 Field Survey and Investigation
3.2 Field Assessment
4 Feasibility Study Phase
4.1 Data interpretation and analysis
Conceptual design of sewerage layout
4.2
plan
4.3 financial and economical analysis
4.4 Preparation of drawings, estimate
4.5 Submission of Draft Report
Comments and suggestions on Draft
5
Report
6 Submission of Final Report

Field
Office