FORM TECH-5 : TEAM COMPOSITION AND TASK ASSIGNMENTS

2.1 TEAM ORGANIZATION


The Project Team has been formed and organized in such a way as to enable the Consultant to provide the
optimum combination of resources and experience to assure the successful completion of the Project. The main
responsibility of the, Consultancy Services to be provided will lie with the Team Leader of the project. He will be
mobilizing all the resources available with the Firm so that the project works are carried out smoothly. He will
also identify, based upon the reports and feedback they will receive from the Project Team Members, and
decide about the type of backstopping support required at any time, and will mobilize the same. He will develop
appropriate linkage with the Client, Head Office and Consultant's Project Personnel and brief them regularly as
per the established lines of communication.
Back-up support from the Head Office will be made to the Consultant's Project Teams during the whole period
of services for carrying out their duties to a successful completion of the Project in consummate workman-like
manner. The Team Leader relevant advisors and support staffs will always be alert to the needs of Project
Teams and will promptly respond with required information, supplies and other resources.

2.2 STAFFING SCHEDULE


The Consultant has put a lot of efforts in understanding the nature, size, scope and the importance of the
proposed services, which have been reflected in above section of this Proposal. Similarly, a careful
consideration has also been made while selecting the proposed team members for the Project. The Consultant
fully understands that despite the experience and a sound establishment of the firms, the success of the Project
will depend in large measure on the composition of the Project Team. The team must represent a combination
of inter-disciplinary skills, including a high degree of technical expertise in a number of disciplines, and
successful professional experience in similar type of projects, with cross-cultural skills enabling them to work
collaboratively and aptly with Client's officials, other agencies and personnel related to the proposed Project.
Manning (Staffing) Schedule is presented and Task assignment of expert is presented in table below.
Table:- Team Composition and Task Assignments [Experts]
Name Proposed Position Task / Responsibilities
Raj Narayan Gupta Senior Sanitary Carry out all required activities as described in and/or that
Engineer/Team follows from the activities described in the scope of the study.
Leader Supervise and ensure the overall management of the team
for successful execution of this assignment.
Proactively plan and lead to achieve the objectives which
may entail carrying out additional tasks/activities not
mentioned in the scope of the study.
Co-ordinate with SDMS, WSSDO, WUA, public
representatives, and other important stakeholders for
effectively carrying out the required activities.
Deploy, in a timely manner, adequate number of survey and
design personnel as per the agreed terms.
Ensure achievement of agreed periodic targets of physical
progress by preparing detailed work schedule and monitoring
of compliance with schedule.
Review the available data, reports and identify need and then
plan and execute all necessary surveys, studies and
investigations to prepare feasibility report.
Perform all the duties render in proposal and ToR
Rajiv Kumar Singh Sewerage Network Carry out activities described in and/or that follows from the
and Treatment activities described in the scope of the study related to
Design Specialist sewerage those assigned by Team Leader.
Carry out all necessary surveys, studies, and investigations
as detailed out in the scope of the study.
Review available data/reports and also that obtained from
surveys, studies, and investigations related with sewerage.
Carry out all activities as detailed out in the scope of the
study, approach and procedures etc.
Prepare Preliminary design, socio-economic report, Cost
estimates etc. for Sewerage network and treatment as
detailed out in scope of the study.
Anticipate the likely environmental impact of carrying out
various subprojects and proactively plan to take necessary

2-1
FORM TECH-5 : TEAM COMPOSITION AND TASK ASSIGNMENTS

Name Proposed Position Task / Responsibilities


action so that implementation is not delayed.
Proactively anticipate and carry out any other activity as per
the scope of the study.
Perform all the duties render in proposal and ToR
Roshan Subedi Sociologist/GESI Carry out activities described in and/or that follows from the
Specialist activities described in the scope of the study/Approach and
procedures as far as relevant to social study and those
assigned by Team Leader.
Prepare socio-economic profile of the project including social
maps using appropriate techniques and give results
regarding social, economic, health and sanitation status of
the community, especially focusing on the likely improvement
in health status of the citizens; likely impact of health and
hygiene education program to be implemented during the
project; willingness to pay for sewerage service; ability to pay
for sewerage service;
Based on the different socio-economic strata, prepare, for the
project, possible structures for differential contribution in
capital investment, O&M and tariff etc for consideration of
project authorities
Develop social inclusion program for specially benefiting the
poor and weaker sections of the project on priority and with
additional assistance, support and efforts.
Proactively make a effective program with WUA and
implement for the purpose of substantially increase the
households' tap connection including socially and
economically backward groups.
Proactively anticipate and carry out any other activity as per
the scope of the study.
Perform all the duties render in proposal and ToR
Prakash Raj Structural Engineer Carry out activities described in and/or that follows from the
Shiwakoti activities described in the scope of work related to structural
engineering; and those assigned by Team Leader.
Formulate structural Design Criteria for various civil
structures related to all components of identified projects.
Collect and review available/field data, study reports and
make reconnaissance survey related to structural
engineering.
Work with Team Leader and Design Engineers to carry out
surveys, field tests & investigations necessary for structural
design.
Carry out structural designs of all required components using
the latest available software in the best techno-economic
manner.
Proactively anticipate and carry out any other activity as per
the scope of work.

Rajib Thapa Electrical Engineer Carry out activities described in and/or that follows from the
activities described in the scope of work related to Electrical /
Mechanical Engineering; and those assigned by Team
Leader.
Collect & review available data, study reports and make
reconnaissance survey of all electro mechanical components
of the project.
Prepare Design Criteria for water supply system related to
electro mechanical components of subprojects in each.
Work with the concerned experts of team in preparing the
designs, drawings, cost estimates, standard specifications
related to electro mechanical components of project.
Proactively anticipate and carry out any other activity as per
the scope of work.

2-2
FORM TECH-5 : TEAM COMPOSITION AND TASK ASSIGNMENTS

Name Proposed Position Task / Responsibilities

Naba Raj Neupane Hydro Carry out activities described in and/or that follows from the
Geologist/Hydrologis activities described in the scope of work related to geo-
t hydrology/hydrology; and those assigned by Team Leader.
Carry out hydrological/geo-hydrological surveys to identify
the best locations of possible bore-wells; calculate potential
discharge; and design the assembly, structure, all other
components of the bore-wells in subprojects ,where required.
Lead required soil tests, resistivity test, sounding test etc. as
deemed necessary to recommend appropriate location for
boreholes, overhead tank etc.
Proactively anticipate and carry out any other activity as per
the scope of work.
Bimal Pd. Financial Specialist Carry out activities described in and/or that follows from the
Pradhananga activities described in the scope of work related to the
Financial Management; and those assigned by Team Leader.
Compute the Economic Internal Rate of Return (EIRR) and
other economic indicators to assess the economic viability of
various alternatives of each identified subproject in each
sector.
Carry out sensitivity analysis for EIRR with respect to
important parameters such as project risks, revenues, capital
investments, O&M costs etc.
Recommend water tariff based on the operation and
maintenance cost, minor repairs, cost recovery (30%
minimum) & system development extension of service area.
Proactively anticipate and carry out any other activity as per
the scope of work.

Iman Maharjan Auto Cad Expert Carry out activities described in and/or that follows from the
activities described in the scope of work related to the field of
consultant and those assigned by Team Leader.
Prepare dimensional drawings, installation drawings and
more complex drawings as demanded by the scope of the
work
Revise and update existing drawings reflecting design
changes, in collaboration with design engineers
Establish filing guidelines for drawings to maintain up-to-date
drawings
Proactively anticipate and carry out any other activity as per
the scope of work.

Tri Ratna Maharjan Surveyor Carry out activities described in and/or that follows from the
activities described in the scope of work related to the field of
consultant and those assigned by Team Leader.
Collect and review all available surveys and investigations.
Responsible for assessing the need for survey and
investigation and shall plan the survey in such a manner that
all necessary survey data are available to key experts for
designing.
Responsible for supervising, monitoring and quality of the
survey work.
Assist in finalizing the mobilization schedule of key experts
according to the survey need and expected completion time
of surveys.
Proactively anticipate and carry out any other activity as per
the scope of work.
Perform all the duties render in proposal and ToR
The Study team composed of Expert with Field Team and support staffs CV of experts are produced in FORM
TECH-6
Table: Team Composition and Task Assignments [Support Staff]
2-3
FORM TECH-5 : TEAM COMPOSITION AND TASK ASSIGNMENTS

Proposed Position Task / Responsibilities


TBN Sub Engineer / Responsible for Topographic Survey
Quantity Surveyor / Assist the Project Team
Surveyor Do all the job assigned by the team leader
Perform all the duties render in proposal and ToR
TBN Auto Cad/Computer Responsible for Preparation of CAD Drawings
operator Assist the Expert
TBN Social Mobilizer Responsible for Data Collection Work
Assist the Expert Team
TBN Support staff Assist the Expert Team

2-4