Langkah-langkah perhitungan
Sebaran hujan jam-jaman dipakai model mononobe, dengan rumus :
Rt = R24 x ( t )2/3
t T
dimana :
Rt = intensitas hujan rata-rata dalam T jam
R24 = Curah Hujan efektif dalam satu hari
t = Waktu mulai hujan
T = Waktu konsentrasi hujan
untuk daerah di Indonesia rata-rata t = 6 jam, maka :
T = 1 jam R1 = R24/6 x (6/1)2/3 = 0.5503 x R24
T = 2 jam R2 = R24/6 x (6/2)2/3 = 0.3467 x R24
T = 3 jam R3 = R24/6 x (6/3)2/3 = 0.2646 x R24
T = 4 jam R4 = R24/6 x (6/4)2/3 = 0.2184 x R24
T = 5 jam R5 = R24/6 x (6/5)2/3 = 0.1882 x R24
T = 6 jam R6 = R24/6 x (6/6)2/3 = 0.1667 x R24 0.8
Curah Hujan jam-jaman
Rumus Rt = (t x Rt) - ((t-1)(Rt-1))
dengan Rt = prosentase intensitas
1 jam R1 = (1 x 0.5503R24) - ((1-1) x R0)
= 0.5503R24 - 0
= 0.5503 x 100% = 55,0321 %
2 jam R2 = (2 x 0.3467R24) - ((2-1) x 0.5503R24)
= 0.6934R24 - 0.5503R24
= 0.1430 x 100% = 14,304 %
3 jam R3 = (3 x 0.2646R24) - ((3-1) x 0.3467R24)
= 0,7937R24 - 0.6934R24
= 0.1003x 100% = 10,0339 %
4 jam R4 = (4 x 0.2184R24) - ((4-1) x 0.2646R24)
= 0.8736R24 - 0.7937R24
= 0.0799 x 100% = 7,988 %
5 jam R5 = (5 x 0.1882R24) - ((5-1) x 0.2184R24)
= 0.941R24 - 0.8736R24
= 0.0675 x 100% = 6,7456 %
6 jam R6 = (6 x 0.1667R24) - ((6-1) x 0.1882R24)
= R24 - 0.941R24
= 0.059 x 100% = 5,8964 %
Rumus = Nisbah*c*(R24/100) c 0.8
Untuk Tr 25 tahun
curah hujan rancangan 25 th = 102.05 mm/hari
- Koefisien pengaliran = 0,7
curah hujan efektif 81.640 mm/hari
Ro = Vol_UV/A = 1
0
3.5
Err:511
0.8
2.8
2.8
Ordinat Hidrograf Satuan dengan Metode Nakayasu
5.50
5.00
4.50
4.00
3.50
3.00
UH (m3/d
5.00
4.50
4.00
3.50
3.00
2.50
2.00
1.50
1.00
0.50
0.00
0 1 2 3 4
100.0
102.5
102
Waktu Lengkung Hidrograf Nakayasu
Keterangan
1.538
1.153
2.461
3.076
6.118
6.00
UH (m3/dt/mm)
5.50
5.00
4.50
4.00
3.50
3.00
UH (m3/d
5.00
4.50
4.00
3.50
3.00
2.50
2.00
1.50
1.00
0.50
0.00
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
t (jam)
16 17 18 19 20 21 22 23 24
Tr 25 tahun
PMF
1003.194
Qp (m3/detik)
25 50 200 1000 PMF
Debit Maksimum 325.062 374.060 425.250 651.982 1003.194
HIDROGRAF BANJIR RANCANG
1200.000
1000.000
Q BANJIR (m3/detik)
800.000
600.000
400.000
200.000
0.000
0 1 2 3 4 5 6 7 8 9 10 11 12 13
WAKTU t (jam)
RAF BANJIR RANCANGAN METODE NAKAYASU
Q 25 thn
Q 50 thn
Q 200 thn
Q 1000 thn
Q PMF
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
WAKTU t (jam)
HIDROGRAF NAKAYASU
1200
Q BANJIR (m3/detik)
1000
800
600
400
200
0
0 2 4 6 8 10 12t (jam) 14
WAKTU 16 18
YASU
Q 25
thn
Q 50
thn
Q 200
thn
Q 1000
thn
Q PMF
Baseflo
w
4 16 18 20 22 24
Tabel 5.19 Perhitungan Lengkung Kapasitas Waduk
Elevasi
No.
(m)
(1) (2)
1 38
2 39
3 40
4 41
5 42
6 43
7 44
8 45
9 46
10 47
11 48
12 49
Hasil Perhitungan
No Material Urugan 1
1 Berat Jenis Tanah Kering, (γdry) = 1606.06 kg/m3
2 Berat Jenis Tanah Basah, (γwet) = 1881.82 kg/m3 2
3 Berat Jenis Tanah Jenuh, (γsat) = 2000 kg/m3
4 Berat Jenis Tanah Batu, (γstone) = 2100 kg/m3 3
5 Koefisien Kohesi Tanah, '(C) = 2500 kg/m2 4
6 Sudut Geser Dalam (Ф) = 23 derajat 4
7 Spesific Gravity (Gs) = 2.65
8 Derajat Kejenuhan, Sr = 0.7
9 Angka Pori, e = 0.65
10 k = 0.14
Data
No Material Urugan
4 Berat Jenis Tanah Kering, (γstone) = 2100 kg/m3
5 Koefisien Kohesi Tanah, '(C) = 2500 kg/m3
6 Sudut Geser Dalam (Ф) = 23 derajat
7 Spesific Gravity (Gs) = 2.65
8 Derajat Kejenuhan, Sr = 0.7
9 Angka Pori, e = 0.65
10 k = 0.14 asumsi
Perhitungan
w = (e*Sr)/Gs
= 0.171698
γw = 1 ton/m3
1000 kg/m3
Berat Jenis Tanah Kering, (γdry) = (1+w)*Gs*γw/1+e
Berat Jenis Tanah Basah, (γwet) = Gs*γw/1+e
Berat Jenis Tanah Jenuh, (γsat) = γw(Gs+e)/1+e
kn/m2 pa kpa
1 1000 1
70 70000 70
d hvc Qc P d A r Qn Qn
D D D5/ 2 D3 D D2 D D g 1/ 2
8/3
d g 1/ 2
8/3
Qn
d g 1/ 2
8/3
Perhitungan Potongan Melintang Sungai Bagian Hulu Untuk Perencanaan Pengelak
Data Teknis Saluran Pengelak :
Bentuk Saluran Lingkaran
Panjang Saluran (m) 11.410
Elevasi Dasar Sungai 38.000
Elevasi Hulu 39.000
Elevasi Hilir 38.000
Slope (Δh/ L) 0.088
Debit Rencana Q25 th 325.062
Angka Kekasaran (Beton) 0.014
Data Teknis Perencanaan Saluran Pengelak :
Bentuk Saluran : Lingkaran
Diameter Saluran : 3.0 m
R : 1.5 m
Panjang Saluran : 11.41 m
Elevasi Hulu : 39 DPL 1
Elevasi Hilir : 38 DPL
Slope (Δh/ L) : 0.09 m/m
Debit Rencana Q25 th : 325.062 m3/detik
Angka Kekasaran (Beton) : 0.014
Aliran Tekan : 3.6
El. MA Tinggi MA θ A P R
2*$E$4*SIN(RADIANS(D18)))
48.1896851
0.087419
B v Q QC F
vc Qc
(m/detik) (m3/detik)
(14) (15)
0.0000 0.0000
1.8083 1.3986
2.5573 5.2711
3.1321 11.0641
3.6166 16.8047
4.0435 24.7822
4.4294 31.3099
4.7843 #NUM!
5.1147 #NUM!
5.4249 #NUM!
5.7184 #NUM!
5.9975 42.3723
6.2642 44.2565
Rating Curve
12
10
0
0 50 100 150
Debit (m3/detik) 200 250 300
300
Hubungan Debit yang Lewat Terowongan (D=3m) dengan Elevasi Muka Air Waduk
Tinggi Garis
H Tinggi MA A
Energi El. Muka Air Waduk
(m) (m) (m) (m2)
(7) (8) (1) (2) (3)
9.308 374.308 365 1 2.267
17.073 383.073 366 2 5.680
16.011 384.011 369 3 9.621
20.132 389.132 370 6 9.621
24.229 394.229 371 7 9.621
28.296 399.296 372 8 9.621
32.330 404.330 373 9 9.621
36.327 409.327 374 10 9.621
40.281 414.281 375 11 9.621
44.190 419.190 376 12 9.621
48.050 424.050 377 13 9.621
51.857 428.857 378 14 9.621
55.609 433.609 379 15 9.621
59.304 438.304 380 16 9.621
62.937 442.937 381 17 9.621
66.508 447.508 382 18 9.621
70.014 452.014 383 19 9.621
73.455 456.455 384 20 9.621
76.828 460.828 385 21 9.621
80.132 465.132 386 22 9.621
83.367 469.367 387 23 9.621
86.533 473.533 388 24 9.621
89.628 477.628 389 25 9.621
92.654 481.654 390 26 9.621
95.609 485.609 391 27 9.621
98.495 489.495 392 28 9.621
101.312 493.312 393 29 9.621
104.061 497.061 394 30 9.621
106.742 500.742 395 31 9.621
109.357 504.357 396 32 9.621
111.907 507.907 397 33 9.621
114.393 511.393 398 34 9.621
116.816 514.816 399 35 9.621
119.178 518.178 400 36 9.621
121.480 521.480 401 37 9.621
123.725 524.725 402 38 9.621
125.912 527.912 403 39 9.621
128.046 531.046 404 40 9.621
130.126 534.126 405 41 9.621
132.155 537.155 406 42 9.621
134.134 540.134 407 43 9.621
136.066 543.066 408 44 9.621
137.951 545.951
1. Data 3. Data
2. Data 4. Data
3. Data 5. (4)/(3)
ng Lewat Terowongan (D=3,5m) dengan Elevasi Muka Air Waduk Tabel 4.12 Hubungan De
Sumber : Perhitungan
6. (1.1*(5)^2)/2g
7. (2)+(6)
8. (7)+(1)
Tabel 4.12 Hubungan Debit yang Lewat Terowongan (D=4m) dengan Elevasi Muka Air Waduk
Tinggi Garis vc
Tinggi MA A Q
Energi El. Muka Air Waduk
(m) (m) (m2) (m3/detik)(m/detik)
(8) (1) (2) (3) (4) (5)
52.528 365 1 2.793 35.766 12.807
53.680 366 2 7.330 137.692 18.785
64.854 367 3 12.295 274.573 22.332
#NUM! 371 7 19.635 384.227 19.569
104.665 372 8 19.635 411.195 20.942
109.519 373 9 19.635 436.195 22.215
114.374 374 10 19.635 459.515 23.403
119.228 375 11 19.635 481.374 24.516
124.083 376 12 19.635 501.937 25.563
128.937 377 13 19.635 521.335 26.551
100.460 378 14 19.635 539.674 27.485
105.277 379 15 19.635 557.042 28.370
439.035 380 16 19.635 573.512 29.209
443.731 381 17 19.635 589.146 30.005
448.363 382 18 19.635 603.998 30.761
452.929 383 19 19.635 618.115 31.480
457.427 384 20 19.635 631.541 32.164
461.856 385 21 19.635 644.311 32.814
466.215 386 22 19.635 656.460 33.433
470.504 387 23 19.635 668.020 34.022
474.720 388 24 19.635 679.019 34.582
478.866 389 25 19.635 689.483 35.115
482.939 390 26 19.635 699.437 35.622
486.941 391 27 19.635 708.905 36.104
490.872 392 28 19.635 717.909 36.563
494.732 393 29 19.635 726.468 36.999
498.522 394 30 19.635 734.604 37.413
502.243 395 31 19.635 742.335 37.807
505.896 396 32 19.635 749.679 38.181
509.483 397 33 19.635 756.652 38.536
513.004 398 34 19.635 763.272 38.873
516.461 399 35 19.635 769.554 39.193
519.855 400 36 19.635 775.514 39.497
523.188 401 37 19.635 781.166 39.784
526.462 402 38 19.635 786.523 40.057
529.678 403 39 19.635 791.600 40.316
532.838 404 40 19.635 796.409 40.561
535.944 405 41 19.635 800.963 40.793
538.997 406 42 19.635 805.274 41.012
542.000 407 43 19.635 809.353 41.220
544.953 408 44 19.635 813.212 41.417
547.860
ongan (D=5m) dengan Elevasi Muka Air Waduk Hubungan Debit yang Lewat Terow
Q/2
Elevasi H S (tampungan) S/Δt Q
(6)/2
(5)-(7)
(5)+(7)
ψ1 φ2 Outflow h Elevasi
(Q)
Inflow
250
200
150
100
50
0
0 5 10 15 20 25
Waktu (jam)
nggi Elevasi Cover Dam = Err:511
Err:511
Terowongan
Outflow Q 25 Tahun
Inflow
20 25 30
PENENTUAN TINGGI DAN LEBAR BENDUNGAN UTAMA
Tinggi (H) = Err:511 m
40 cm
Maka, 800
Lebar (B) = 3,6 . H1/3 – 3 0.05
= Err:511 ###
tertinggi 55
PENENTUAN TINGGI DAN LEBAR COFFERDAM terendah 38
Elevasi Q25 = Err:511 beda 17
Elevasi Dasar Sungai = 38
Freeboard = 2 pnjng as 519
(Elevasi saat Q25th - Elevasi
Tinggi Cofferdam (H) = Dasar Sungai)+ freeboard dlm gmbr 51.9
= Err:511
Maka,
Lebar (B) = 3,6 . H1/3 – 3
= Err:511
asumsi
k = 0.14
g' = 2.00 (berat efektif tanah)
Kemiringan lereng bagian hulu
m - k γ'
FS hulu =
1 + k*γ' m
m - 0.14 2.00
FS hulu =
1 + 0.28 m
m - 0.28
1.1 =
1 + 0.28 m
m - 0.28
1.311 =
1 + 0.28 m
1.311 + 0.367 m = m -
1.591 = 0.633 m
Kemiringan hulu m = 2.5136
= 2.5
Maka,
L = Err:511
0.14
Dalam Gambar H L Dalam Gambar
0 0 0.000 0.000
0.25135545543 0.251355 1 1.777 0.178 0.178
0.50271091086 0.2513555 2 3.554 0.355 0.178
0.75406636629 Hulu 0.2513555 3 5.331 0.533 0.178
Hilir
1.00542182172 0.2513555 4 7.108 0.711 0.178
1.25677727715 0.2513555 5 8.885 0.889 0.178
1.50813273258 0.2513555 6 10.662 1.066 0.178
1.75948818801 0.2513555 7 12.440 1.244 0.178
2.01084364344 0.2513555 8 14.217 1.422 0.178
2.26219909886 0.2513555 9 15.994 1.599 0.178
Maka,
Lebar (B) = 3,6 . H1/3 – 3
= -15.6122330173922
asumsi
k = 0.14
g' = 2.00 (berat efektif tanah)
Kemiringan lereng bagian hulu
m - k γ'
FS hulu =
1 + k*γ' m
m - 0.14 2.00
FS hulu =
1 + 0.28 m
m - 0.28
1.1 =
1 + 0.28 m
m - 0.28
1.311 =
1 + 0.28 m
1.311 + 0.367 m = m -
1.591 = 0.633 m
Kemiringan hulu m = 2.5136
= 2.5
Maka,
L = 43
0.14
Dalam Gambar H L Dalam Gambar
0 0 0.000 0.000
0.25135545543 0.251355 1 1.777 0.178 0.178
0.50271091086 0.2513555 2 3.554 0.355 0.178
0.75406636629 Hulu 0.2513555 3 5.331 0.533 0.178
Hilir
1.00542182172 0.2513555 4 7.108 0.711 0.178
1.25677727715 0.2513555 5 8.885 0.889 0.178
1.50813273258 0.2513555 6 10.662 1.066 0.178
1.75948818801 0.2513555 7 12.440 1.244 0.178
2.01084364344 0.2513555 8 14.217 1.422 0.178
2.26219909886 0.2513555 9 15.994 1.599 0.178
DEFORMASI R3
Name of Material γsat γwet γdry
(kN/m³) (kN/m³) (kN/m³)
tanah pondasi 21.58 21.09 19.61
core material 17.46 16.48 12.36
fine filter material 20.10 17.65 16.67
coarse filter material 20.59 18.14 17.16
random material 20.40 18.14 16.97
random rock material 20.59 18.14 17.65
rip-rap material 22.56 20.59 18.63
pondasi grouting 21.58 21.09 19.61
pondasi alluvial 21.09 20.59 17.16
pondasi kollovial 21.09 20.59 17.16
WATER CONTENT
0.1 100 20
0.1 100 20
0.1 100 20
0.1 100 20
0.1 100 20
0.1 100 20
BILITY Kondisi Kosong Tegangan Total Kondisi Muka Air Tegangan Efektif
γdry K Cuu Φuu C'cu
2
(ton/m³) (cm/sec) (ton/m ) (o) (ton/m2)
2.00 1.00E-04 15.00 35.00 15.00
1.26 1.00E-05 2.60 15.00 2.40
1.70 1.00E-03 0.00 29.00 0.00
1.75 5.00E-03 0.00 32.00 0.00
1.73 1.00E-04 2.00 30.00 0.80
1.80 1.00 0.50 37.00 0.50
1.90 1.00 0.00 40.00 0.00
2.00 1.00E-05 15.00 35.00 15.00
1.75 5.00E-04 0.50 30.00 0.50
1.75 1.00E-04 1.00 29.00 1.00
1.65 1.00E-01 0.00 30.00 0.00
BILITY Kondisi Kosong Tegangan Total Kondisi Muka Air Tegangan Efektif
γdry K Cuu Φuu C'cu
(kN/m³) (m/sec) (kPa) (o) (kPa)
19.61 1.00E-06 147.11 35.00 147.11
12.36 1.00E-07 25.50 15.00 23.54
16.67 1.00E-05 0.00 29.00 0.00
17.16 5.00E-05 0.00 32.00 0.00
16.97 1.00E-06 19.61 30.00 7.85
17.65 1.00 4.90 37.00 4.90
18.63 1.00 0.00 40.00 0.00
19.61 1.00E-07 147.11 35.00 147.11
17.16 5.00E-06 4.90 30.00 4.90
17.16 1.00E-06 9.81 29.00 9.81
16.18 1.00E-03 0.00 30.00 0.00
500
2.14E-04 2.14E-01
2.03873598369011
E-Modulus Poissons
(kPa) Ratio
1000000 0.30
20000 0.40
75000 0.35
100000 0.35
60000 0.37
125000 0.35
150000 0.33
1000000 0.30
100000 0.35
80000 0.35
0 0.2
1 0.5
0.6
0.4
0.2
0
0 0.2 0.4 0.6 0.8 1
0 0.001
1 0.1
0.15
0.1
0.05
0
0 0.2 0.4 0.6 0.8 1 1.2
1.2
H = 16.75 m tg a = 0.55
l1 = 5.024 m 16.618 a = 29.00 C = 0.8823 (dari grafik)
l2 = 11.5939 m cos a = 0.87 α= 29
0,3.l1 = 1.507 m 0.60288 sin a = 0.48
d = 13.101 6.55055 5.24044 a = 7.66
Y0 = 8.16 3.264625 4.080781 a + Da = 65.09
2y0 = 16.32 1.632313 Da = 57.43 m
Y02 = 66.611
0.5.Y0 = 4.081
Y = (2yox + yo^2)^0.5 Formasi Garis Depresi Cofferdam
X = (y^2 - yo^2 )/2yo untuk zone inti
25
Garis Depresi h2 6142041.079
No X Y h22 ###
1 -4.081 0.000 27.088 2.h2 12284082.157 20
2 -4.020 1.000 27.149 y= (2,520.x + 1,587)1/2
3 -3.943 1.500 27.226
Y (m)
4 -3.836 2.000 27.333 x y
5 -3.698 2.500 27.471 -3071020.539329 0 15
6 -3.529 3.000 27.639 0 6142041.07866
7 -3.330 3.500 27.838 1 6142042.07866
8 -3.101 4.000 28.068 Colum 2 6142043.07866
-2.840 4.500 nD
9 28.329 Lereng
3 6142044.07866 10
10 -2.549 5.000 28.620 Inti 4 6142045.07866
Air
11 -2.228 5.500 28.941 5 6142046.07866
inti
12 -1.875 6.000 29.293 kedap 6 6142047.07865
13 -1.492 6.500 29.676 7 6142048.07865 5
14 -1.079 7.000 30.090 8 6142049.07865
15 -0.635 7.500 30.534 9 6142050.07865
16 -0.160 8.000 31.009 10 6142051.07865
17 0.345 8.500 31.514 11 6142052.07865 0
18 0.882 9.000 32.050 120.0 100.0
12 80.0
6142053.07865 60.0 40.0 20.0 0.0
X (m)
19 1.448 9.500 32.617 13 6142054.07864
20 2.045 10.000 33.214 14 6142055.07864
21 2.673 10.500 33.842 15 6142056.07864
22 3.332 11.000 34.501
23 4.021 11.500 35.190 9.25
24 4.741 12.000 35.910
25 5.492 12.500 36.660 H2 = (K1/K2)/yo
26 6.273 13.000 37.441 K2 = 20k1
27 7.084 13.500 38.253 K1=1
L= 101.29 Skala 1:1000 0.4
Lereng Bendungan No X Y
X Y Air 1 28.235 0.000
0.000 0.000 X Y dari gambar 2 28.238 0.200
(dari grafik) 37.800 21.000 101.290 16.75 3 28.245 0.400
44.800 21.000 44.270 16.75 4 28.257 0.600
101.290 0.000 18 6142059 5 28.274 0.800
inti kedap 6142060 6 28.296 1.000
X Y 7 28.323 1.200
31.169 32.316 0.000 8 28.355 1.400
38.466 20.500 9 28.392 1.600
43.144 20.500 10 28.434 1.800
49.294 0.000 11 32.316 2.500
0.3 12 32.616 3.000
Debit Rembesan Riprap Debit Rembesan zona inti kedap & filter 0.6 13 32.916 3.500
Nd = 6 Nd = 6 0.9 14 33.216 4.000
Nf = 6 Nf = 8 1.2 15 33.516 4.500
k = 0.0000001 m/det k = 1E-05 m/det 1.5 16 33.816 5.000
H = 16.75 m H = 16.75 m 1.8 17 34.116 5.500
L = m L = 55.25 m 2.1 18 34.416 6.000
q = 0.000002 m^3/det q = 2.23E-04 m^3/det 2.4 19 34.716 6.500
Q = 0.000000 m^3/det Q = 0.012337 m^3/det 2.7 20 35.016 7.000
= 0.000 lt/det = 12.337 lt/det 3 21 35.316 7.500
Q total = 12.337 lt/det 3.3 22 35.616 8.000
0 19 3.6 23 35.916 8.500
50.2298 4339854.72 3.9 24 36.216 9.000
Keamanan terhadap Piping 4.2 25 36.516 9.500
h = 8.585 m 4.5 26 36.816 10.000
l = 6.55055 m 4.8 27 37.116 10.500
e = 0.850 m 217.5 5.1 28 37.416 11.000
Gs = 2.65 m 5.4 29 37.716 11.500
i = 1.311 5.7 30 38.016 12.000
ic = 11.000 149 6 31 38.316 12.500
karena i < ic maka bendungan aman terhadap piping aman 74.5 6.3 32 38.616 13.000
v rembesan = 1.31E-07 Vs 1.93E-07 6.6 33 38.916 13.500
d = 0.001 6.9 34 39.216 14.000
W = 8.64E-07 grm 7.2 35 39.516 14.500
F = 7.85E-07 cm2 7.5 36 39.816 15.000
vc = 0.1038797381591 gr 7.8 37 40.116 15.500
= 7.853981634E-07 8.1 38 40.416 16.000
karena v < vc maka bendungan aman terhadap
36.020935371112 cmpiping
/ dt 8.4 39 40.716 16.500
3.6020935371112 m / dt 8.7 40 41.016 16.747
9 41 41.316 #REF!
b 16.98 m 9.3 42 41.616 #REF!