S.No. Permit No. Description Contractor Issued Date Valid Date Starting time End Time Location Remarks
1 0310 Hot Work Permit Hxagon 1/Oct/2020 1/Oct/2020 07;00 AM 05;30 PM Camp Area
2 0311 Hot Work Permit Hxagon 1/Oct/2020 1/Oct/2020 07;00 AM 05;30 PM STP Area
3 0313 Hot Work Permit Hxagon 1/Oct/2020 1/Oct/2020 07;00 AM 05;30 PM Camp Area
4 0314 Hot Work Permit Shade 1/Oct/2020 1/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
5 0316 Hot Work Permit Advanced Elemets 1/Oct/2020 1/Oct/2020 07;00 AM 05;30 PM Camp&RO Area
6 0317 Hot Work Permit Advanced Elemets 1/Oct/2020 1/Oct/2020 07;00 AM 05;30 PM Camp Phase-1Area
7 0318 Hot Work Permit Veolia 1/Oct/2020 1/Oct/2020 07;00 AM 05;30 PM RO Area
8 0319 Hot Work Permit Veolia 1/Oct/2020 1/Oct/2020 07;00 AM 05;30 PM STP Area
9 0323 Hot Work Permit Project Lines 1/Oct/2020 1/Oct/2020 07;00 AM 05;30 PM Office Area
10 0324 Hot Work Permit Al-Rashed 1/Oct/2020 1/Oct/2020 07;00 AM 05;30 PM Camp Area
11 0325 Hot Work Permit Advanced Elemets 1/Oct/2020 1/Oct/2020 07;00 AM 05;30 PM STP Area
12 0326 Hot Work Permit Advanced Elemets 1/Oct/2020 1/Oct/2020 07;00 AM 05;30 PM RO Area
13 0327 Hot Work Permit Advanced Elemets 1/Oct/2020 1/Oct/2020 07;00 AM 05;30 PM Office Area
14 0328 Hot Work Permit Advanced Elemets 1/Oct/2020 1/Oct/2020 07;00 AM 05;30 PM Camp Area
15 0329 Hot Work Permit Advanced Elemets 1/Oct/2020 1/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
16 0330 Hot Work Permit Advanced Elemets 1/Oct/2020 1/Oct/2020 07;00 AM 05;30 PM Camp Area
17 0331 Hot Work Permit Mezat 1/Oct/2020 1/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
18 0332 Hot Work Permit Temcon 1/Oct/2020 1/Oct/2020 07;00 AM 05;30 PM DT-1&2
19 0375 Cold Work Permit Veolia 26/Sep/2020 1/Oct/2020 7;00 AM 5;30 PM STP Area
20 0376 Cold Work Permit Veolia 26/Sep/2020 1/Oct/2020 7;00 AM 5;30 PM RO Unit
21 0379 Cold Work Permit 3S 26/Sep/2020 1/Oct/2020 7;00 AM 5;30 PM Camp Area
22 0380 Cold Work Permit X-Smart 27/Sep/2020 1/Oct/2020 7;00 AM 5;30 PM Camp&Office Area
23 0381 Cold Work Permit Advanced Elements 28/Sep/2020 1/Oct/2020 7;00 AM 5;30 PM RO&STP Area
1 0320 Hot Work Permit Veolia 3/Oct/2020 3/Oct/2020 07;00 AM 05;30 PM RO Area
2 0321 Hot Work Permit veolia 3/Oct/2020 3/Oct/2020 07;00 AM 05;30 PM STP Area
3 0333 Hot Work Permit Al-Rashed 3/Oct/2020 3/Oct/2020 07;00 AM 05;30 PM Camp Area
4 0334 Hot Work Permit Shade 3/Oct/2020 3/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
5 0335 Hot Work Permit Project Lines 3/Oct/2020 3/Oct/2020 07;00 AM 05;30 PM Office Area
6 0336 Hot Work Permit Advanced Elemets 3/Oct/2020 3/Oct/2020 07;00 AM 05;30 PM Camp&RO Area
7 0337 Hot Work Permit Advanced Elemets 3/Oct/2020 3/Oct/2020 07;00 AM 05;30 PM Camp &phase#1
8 0338 Hot Work Permit Hxagon 3/Oct/2020 3/Oct/2020 07;00 AM 05;30 PM Camp Area
9 0339 Hot Work Permit Hxagon 3/Oct/2020 3/Oct/2020 07;00 AM 05;30 PM STP Area
10 0341 Hot Work Permit Hxagon 3/Oct/2020 3/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
11 0342 Hot Work Permit Hxagon 3/Oct/2020 3/Oct/2020 07;00 AM 05;30 PM Camp Area
12 0343 Hot Work Permit Advanced Elemets 3/Oct/2020 3/Oct/2020 07;00 AM 05;30 PM STP Area
13 0344 Hot Work Permit Advanced Elemets 3/Oct/2020 3/Oct/2020 07;00 AM 05;30 PM Camp Area
14 0345 Hot Work Permit Advanced Elemets 3/Oct/2020 3/Oct/2020 07;00 AM 05;30 PM Camp Area
15 0346 Hot Work Permit Advanced Elemets 3/Oct/2020 3/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
16 0347 Hot Work Permit Advanced Elemets 3/Oct/2020 3/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
17 0348 Hot Work Permit Temcon 3/Oct/2020 3/Oct/2020 07;00 AM 05;30 PM DT-1,2,3,4,5&6
18 0350 Hot Work Permit X-Smart 3/Oct/2020 3/Oct/2020 07;00 AM 05;30 PM RO Area
21 0383 Cold Work Permit Advanced Elemets 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM RO Area
22 0384 Cold Work Permit Veolia 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM RO Area
23 0385 Cold Work Permit Veolia 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM STP Area
24 0386 Cold Work Permit X-Smart 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM Camp Area
1 0351 Hot Work Permit Shade 4/Oct/2020 4/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
2 0352 Hot Work Permit Al-Rashed 4/Oct/2020 4/Oct/2020 07;00 AM 05;30 PM Camp Area
3 0353 Hot Work Permit Advanced Elemets 4/Oct/2020 4/Oct/2020 07;00 AM 05;30 PM Camp&RO Area
4 0354 Hot Work Permit Advanced Elemets 4/Oct/2020 4/Oct/2020 07;00 AM 05;30 PM Camp(Phase-1)Area
5 0356 Hot Work Permit Project Lines 4/Oct/2020 4/Oct/2020 07;00 AM 05;30 PM Office Area
6 0357 Hot Work Permit Advanced Elemets 4/Oct/2020 4/Oct/2020 07;00 AM 05;30 PM Camp Area
7 0358 Hot Work Permit Advanced Elemets 4/Oct/2020 4/Oct/2020 07;00 AM 05;30 PM Camp Area
8 0359 Hot Work Permit Advanced Elemets 4/Oct/2020 4/Oct/2020 07;00 AM 05;30 PM Camp&Office Area
9 0360 Hot Work Permit Advanced Elemets 4/Oct/2020 4/Oct/2020 07;00 AM 05;30 PM Camp Area
10 0361 Hot Work Permit Temcon 4/Oct/2020 4/Oct/2020 07;00 AM 05;30 PM DT- 5 & 6
11 0362 Hot Work Permit Veolia 4/Oct/2020 4/Oct/2020 07;00 AM 05;30 PM STP Area
12 0363 Hot Work Permit Veolia 4/Oct/2020 4/Oct/2020 07;00 AM 05;30 PM RO Area
13 0366 Hot Work Permit Advanced Elemets 4/Oct/2020 4/Oct/2020 07;00 AM 05;30 PM Camp&Office Area
14 0367 Hot Work Permit Hxagon 4/Oct/2020 4/Oct/2020 07;00 AM 05;30 PM Camp Area
15 0369 Hot Work Permit Hxagon 4/Oct/2020 4/Oct/2020 07;00 AM 05;30 PM STP Area
16 0370 Hot Work Permit Hxagon 4/Oct/2020 4/Oct/2020 07;00 AM 05;30 PM Camp&Office Area
17 0372 Hot Work Permit Pacific Ocean 4/Oct/2020 4/Oct/2020 07;00 AM 05;30 PM Camp Area
18 0373 Hot Work Permit Tabreed 4/Oct/2020 4/Oct/2020 12;00 AM 05;30 PM Camp Area
19 0329 Lifting Permit Advanced Elemets 4/Oct/2020 4/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
21 0383 Cold Work Permit Advanced Elemets 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM RO Area
22 0384 Cold Work Permit Veolia 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM RO Area
23 0385 Cold Work Permit Veolia 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM STP Area
24 0386 Cold Work Permit X-Smart 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM Camp Area
1 0364 Hot Work Permit Veolia 5/Oct/2020 5/Oct/2020 07;00 AM 05;30 PM STP Area
2 0365 Hot Work Permit Veolia 5/Oct/2020 5/Oct/2020 07;00 AM 05;30 PM RO Area
3 0374 Hot Work Permit Shade 5/Oct/2020 5/Oct/2020 07;00 AM 06;00 PM Camp&Office Area
4 0375 Hot Work Permit Hxagon 5/Oct/2020 5/Oct/2020 07;00 AM 05;30 PM Camp Area
5 0376 Hot Work Permit Hxagon 5/Oct/2020 5/Oct/2020 07;00 AM 05;30 PM STP Area
6 0377 Hot Work Permit Advanced Elemets 5/Oct/2020 5/Oct/2020 07;00 AM 05;30 PM Camp&RO Area
7 0378 Hot Work Permit Advanced Elemets 5/Oct/2020 5/Oct/2020 07;00 AM 05;30 PM Camp Area ph#1
8 0380 Hot Work Permit Al-Rashed 5/Oct/2020 5/Oct/2020 07;00 AM 05;30 PM Camp Area
9 0381 Hot Work Permit Project Lines 5/Oct/2020 5/Oct/2020 07;00 AM 05;30 PM Office Area
10 0382 Hot Work Permit Advanced Elemets 5/Oct/2020 5/Oct/2020 07;00 AM 05;30 PM Camp Area
11 0383 Hot Work Permit Advanced Elemets 5/Oct/2020 5/Oct/2020 07;00 AM 05;30 PM Camp Area
12 0384 Hot Work Permit Advanced Elemets 5/Oct/2020 5/Oct/2020 07;00 AM 05;30 PM STP Area
13 0385 Hot Work Permit Advanced Elemets 5/Oct/2020 5/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
14 0386 Hot Work Permit Advanced Elemets 5/Oct/2020 5/Oct/2020 07;00 AM 05;30 PM Camp Area
15 0387 Hot Work Permit Pacific Ocean 5/Oct/2020 5/Oct/2020 07;00 AM 05;30 PM Camp Area
16 0389 Hot Work Permit Advanced Elemets 5/Oct/2020 5/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
17 0390 Hot Work Permit Advanced Elemets 5/Oct/2020 5/Oct/2020 07;00 AM 05;30 PM RO Area
18 0330 Lifting Permit Advanced Elemets 5/Oct/2020 5/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
20 0383 Cold Work Permit Advanced Elemets 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM RO Area
21 0384 Cold Work Permit Veolia 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM RO Area
22 0385 Cold Work Permit Veolia 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM STP Area
23 0386 Cold Work Permit X-Smart 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM Camp Area
24 0388 Cold Work Permit Hxagon 5/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM Camp&Office Area
1 0393 Hot Work Permit Al-Rashed 6/Oct/2020 6/Oct/2020 07;00 AM 05;30 PM Camp Area
2 0394 Hot Work Permit Project Lines 6/Oct/2020 6/Oct/2020 07;00 AM 05;30 PM OfficeArea
3 0395 Hot Work Permit Advanced Elemets 6/Oct/2020 6/Oct/2020 07;00 AM 05;30 PM Camp Area
4 0396 Hot Work Permit Advanced Elemets 6/Oct/2020 6/Oct/2020 07;00 AM 05;30 PM Camp Area
5 0397 Hot Work Permit Advanced Elemets 6/Oct/2020 6/Oct/2020 07;00 AM 05;30 PM Camp & Office Area
6 0398 Hot Work Permit Advanced Elemets 6/Oct/2020 6/Oct/2020 07;00 AM 05;30 PM Camp Area
7 0399 Hot Work Permit Advanced Elemets 6/Oct/2020 6/Oct/2020 07;00 AM 05;30 PM STP Area
8 0400 Hot Work Permit Advanced Elemets 6/Oct/2020 6/Oct/2020 07;00 AM 05;30 PM RO Area
9 0401 Hot Work Permit Veolia 6/Oct/2020 6/Oct/2020 07;00 AM 05;30 PM STP Area
10 0402 Hot Work Permit Veolia 6/Oct/2020 6/Oct/2020 07;00 AM 05;30 PM RO Area
11 0405 Hot Work Permit Pacific Ocean 6/Oct/2020 6/Oct/2020 07;00 AM 05;30 PM Camp Area
12 0406 Hot Work Permit Advanced Elemets 6/Oct/2020 6/Oct/2020 07;00 AM 05;30 PM Camp Area(RO)
13 0407 Hot Work Permit Advanced Elemets 6/Oct/2020 6/Oct/2020 07;00 AM 05;30 PM Camp Area ph#1
14 0409 Hot Work Permit Hxagon 6/Oct/2020 6/Oct/2020 07;00 AM 05;30 PM Camp Area
15 0410 Hot Work Permit Hxagon 6/Oct/2020 6/Oct/2020 07;00 AM 05;30 PM STP Area
16 0411 Hot Work Permit Advanced Elemets 6/Oct/2020 6/Oct/2020 07;00 AM 05;30 PM Camp Area
17 0102 Confined Space Advanced Elemets 6/Oct/2020 6/Oct/2020 07;00 AM 05;30 PM RO Area
18 0331 Lifting Permit Advanced Elemets 6/Oct/2020 6/Oct/2020 07;00 AM 05;30 PM Camp Area
20 0383 Cold Work Permit Advanced Elemets 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM RO Area
21 0384 Cold Work Permit Veolia 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM RO Area
22 0385 Cold Work Permit Veolia 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM STP Area
23 0386 Cold Work Permit X-Smart 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM Camp Area
24 0388 Cold Work Permit Hxagon 5/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM Camp&Office Area
1 0412 Hot Work Permit Al-Rashed 7/Oct/2020 7/Oct/2020 07;00 AM 05;00 PM Camp & Office Area
2 0413 Hot Work Permit Project Lines 7/Oct/2020 7/Oct/2020 07;00 AM 05;30 PM OfficeArea
3 0414 Hot Work Permit Advanced Elements 7/Oct/2020 7/Oct/2020 07;00 AM 05;30 PM Camp Area
4 0415 Hot Work Permit Advanced Elements 7/Oct/2020 7/Oct/2020 07;00 AM 05;30 PM Camp Area
5 0416 Hot Work Permit Advanced Elements 7/Oct/2020 7/Oct/2020 07;00 AM 05;30 PM Camp & Office Area
6 0417 Hot Work Permit Advanced Elements 7/Oct/2020 7/Oct/2020 07;00 AM 05;30 PM Camp Area
7 0403 Hot Work Permit Veolia 7/Oct/2020 7/Oct/2020 07;00 AM 05;30 PM STP Area(Mech)
8 0404 Hot Work Permit Veolia 7/Oct/2020 7/Oct/2020 07;00 AM 05;30 PM STP Area(Elect)
9 0418 Hot Work Permit Veolia 7/Oct/2020 7/Oct/2020 07;00 AM 05;30 PM RO Area(Mech)
10 0419 Hot Work Permit Veolia 7/Oct/2020 7/Oct/2020 07;00 AM 05;30 PM RO Area(Elect)
11 0420 Hot Work Permit Pacific Ocean 7/Oct/2020 7/Oct/2020 07;00 AM 05;30 PM Camp Area
12 0422 Hot Work Permit Advanced Elements 7/Oct/2020 7/Oct/2020 07;00 AM 05;30 PM Camp Area (RO)
13 0423 Hot Work Permit Advanced Elements 7/Oct/2020 7/Oct/2020 07;00 AM 05;30 PM Camp Area#1&Kitchen
14 0424 Hot Work Permit Advanced Elements 7/Oct/2020 7/Oct/2020 07;00 AM 05;30 PM RO Area
15 0426 Hot Work Permit Advanced Elements 7/Oct/2020 7/Oct/2020 07;00 AM 05;30 PM Camp Area
16 0428 Hot Work Permit Hxagon 7/Oct/2020 7/Oct/2020 07;00 AM 05;30 PM Camp Area ph#1&2
17 0429 Hot Work Permit Hxagon 7/Oct/2020 7/Oct/2020 07;00 AM 05;30 PM Helipad Area
18 0430 Hot Work Permit Hxagon 7/Oct/2020 7/Oct/2020 07;00 AM 05;30 PM STP Area
19 0431 Hot Work Permit Hxagon 7/Oct/2020 7/Oct/2020 07;00 AM 05;30 PM Camp Area (RO)
20 0103 Confined Space Advanced Elements 7/Oct/2020 7/Oct/2020 07;00 AM 05;30 PM RO Area
21 0332 Lifting Permit Advanced Elements 7/Oct/2020 7/Oct/2020 07;00 AM 05;30 PM Camp Area
23 0383 Cold Work Permit Advanced Elemets 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM RO Area
24 0384 Cold Work Permit Veolia 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM RO Area
25 0385 Cold Work Permit Veolia 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM STP Area
26 0388 Cold Work Permit Hxagon 5/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM Camp&Office Area
27 0387 Cold Work Permit Sawaed Al Bandar 4/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM STP Area
28 0388 Cold Work Permit Hxagon 5/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM Camp&Office Area
1 0432 Hot Work Permit Advanced Elements 8/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM Camp&Office Area
2 0433 Hot Work Permit Advanced Elements 8/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM Camp Area(kitchen)
3 0436 Hot Work Permit Hxagon 8/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM Camp Area
4 0437 Hot Work Permit Hxagon 8/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM STP Area
5 0438 Hot Work Permit Hxagon 8/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM Helipad Area
6 0439 Hot Work Permit Project Lines 8/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM OfficeArea
7 0440 Hot Work Permit Pacific Ocean 8/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM Camp Area
8 0441 Hot Work Permit Temcon 8/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM DT#1,2,3,4&5
9 0443 Hot Work Permit Al-Rashed 8/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM Camp&Office Area
10 0445 Hot Work Permit Advanced Elements 8/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM Camp Area
11 0447 Hot Work Permit Advanced Elements 8/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM Camp&Office Area
12 0449 Hot Work Permit Veolia 8/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM RO Area
13 0450 Hot Work Permit Veolia 8/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM RO Area
14 0452 Hot Work Permit Veolia 8/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM STP Area
16 0383 Cold Work Permit Advanced Elements 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM RO Area
17 0384 Cold Work Permit Veolia 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM RO Area
18 0385 Cold Work Permit Veolia 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM STP Area
19 0386 Cold Work Permit X-Smart 3/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM Camp Area
20 0388 Cold Work Permit Hxagon 5/Oct/2020 8/Oct/2020 07;00 AM 05;30 PM Camp&Office Area
1 0451 Hot Work Permit Al-Rashed 10/Oct/2020 10/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
2 0454 Hot Work Permit Hxagon 10/Oct/2020 10/Oct/2020 07;00 AM 05;30 PM Camp Area
3 0455 Hot Work Permit Hxagon 10/Oct/2020 10/Oct/2020 07;00 AM 05;30 PM STP Area
4 0456 Hot Work Permit Hxagon 10/Oct/2020 10/Oct/2020 07;00 AM 05;30 PM Helipad Area
5 0458 Hot Work Permit Advanced Elements 10/Oct/2020 10/Oct/2020 07;00 AM 05;30 PM Camp Area
6 0459 Hot Work Permit Advanced Elements 10/Oct/2020 10/Oct/2020 07;00 AM 05;30 PM Camp Area
7 0460 Hot Work Permit Veolia 10/Oct/2020 10/Oct/2020 07;00 AM 05;30 PM RO Area(Elect)
8 0461 Hot Work Permit Veolia 10/Oct/2020 10/Oct/2020 07;00 AM 05;30 PM STP Area(Elect)
9 0462 Hot Work Permit Veolia 10/Oct/2020 10/Oct/2020 07;00 AM 05;30 PM RO Area(Mech)
10 0463 Hot Work Permit Project Lines 10/Oct/2020 10/Oct/2020 07;00 AM 05;30 PM OfficeArea
11 0464 Hot Work Permit Pacific Ocean 10/Oct/2020 10/Oct/2020 07;00 AM 05;30 PM Camp Area
12 0465 Hot Work Permit Advanced Elements 10/Oct/2020 10/Oct/2020 07;00 AM 05;30 PM Camp Area
13 0466 Hot Work Permit Advanced Elements 10/Oct/2020 10/Oct/2020 07;00 AM 05;30 PM Camp Area
14 0467 Hot Work Permit Advanced Elements 10/Oct/2020 10/Oct/2020 07;00 AM 05;30 PM Camp Area
15 0468 Hot Work Permit Advanced Elements 10/Oct/2020 10/Oct/2020 07;00 AM 05;30 PM Camp Area
16 0469 Hot Work Permit Advanced Elements 10/Oct/2020 10/Oct/2020 07;00 AM 05;30 PM Road#1
17 0470 Hot Work Permit Sawaed Al Bandar 10/Oct/2020 10/Oct/2020 07;00 AM 05;30 PM Camp Area
18 0471 Hot Work Permit Advanced Elements 10/Oct/2020 10/Oct/2020 07;00 AM 05;30 PM Camp Area(RO)
19 0472 Hot Work Permit Temcon 10/Oct/2020 10/Oct/2020 07;00 AM 05;30 PM DT#1,2,3&4
20 0334 Lifting Permit Hxagon 10/Oct/2020 10/Oct/2020 07;00 AM 05;30 PM Camp Area
21 0389 Cold Work Permit Veolia 10/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM STP Area
22 0390 Cold Work Permit Veolia 10/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM RO Area
1 0474 Hot Work Permit Veolia 11/Oct/2020 11/Oct/2020 07;00 AM 05;30 PM RO Area(Elect)
2 0475 Hot Work Permit Veolia 11/Oct/2020 11/Oct/2020 07;00 AM 05;30 PM RO Area(Mech)
3 0476 Hot Work Permit Veolia 11/Oct/2020 11/Oct/2020 07;00 AM 05;30 PM STP Area(Elect)
4 0477 Hot Work Permit Al-Rashed 11/Oct/2020 11/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
5 0479 Hot Work Permit Hexagon 11/Oct/2020 11/Oct/2020 07;00 AM 05;30 PM Camp Area(RO)
6 0480 Hot Work Permit Hexagon 11/Oct/2020 11/Oct/2020 07;00 AM 05;30 PM STP Area
7 0481 Hot Work Permit Hexagon 11/Oct/2020 11/Oct/2020 07;00 AM 05;30 PM Camp Area
8 0482 Hot Work Permit Hexagon 11/Oct/2020 11/Oct/2020 07;00 AM 05;30 PM Camp Area
9 0483 Hot Work Permit Advanced Elements 11/Oct/2020 11/Oct/2020 07;00 AM 05;30 PM Camp Area
10 0484 Hot Work Permit Advanced Elements 11/Oct/2020 11/Oct/2020 07;00 AM 05;30 PM Camp Area
11 0485 Hot Work Permit Project Lines 11/Oct/2020 11/Oct/2020 07;00 AM 05;30 PM OfficeArea
12 0486 Hot Work Permit Pacific Ocean 11/Oct/2020 11/Oct/2020 07;00 AM 05;30 PM Camp Area
13 0487 Hot Work Permit Advanced Elements 11/Oct/2020 11/Oct/2020 07;00 AM 05;30 PM Camp Area PH#1
14 0488 Hot Work Permit Advanced Elements 11/Oct/2020 11/Oct/2020 07;00 AM 05;30 PM Camp Area RD#17
15 0489 Hot Work Permit Advanced Elements 11/Oct/2020 11/Oct/2020 07;00 AM 05;30 PM Camp Area
16 0490 Hot Work Permit Advanced Elements 11/Oct/2020 11/Oct/2020 07;00 AM 05;30 PM Camp Area
17 0491 Hot Work Permit Advanced Elements 11/Oct/2020 11/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
18 0492 Hot Work Permit Advanced Elements 11/Oct/2020 11/Oct/2020 07;00 AM 05;30 PM Road#1
19 0493 Hot Work Permit Temcon 11/Oct/2020 11/Oct/2020 07;00 AM 05;30 PM DT#3,4&5
20 0389 Cold Work Permit Veolia 10/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM STP Area
21 0390 Cold Work Permit Veolia 10/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM RO Area
1 0494 Hot Work Permit Veolia 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM STP Area(Elect)
2 0495 Hot Work Permit Veolia 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM RO Area(Elect)
3 0496 Hot Work Permit Veolia 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM RO Area(Mech)
4 0497 Hot Work Permit Al-Rashed 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
5 0498 Hot Work Permit Pacific Ocean 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM Camp Area
6 0499 Hot Work Permit Project Lines 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM Office Area
7 0500 Hot Work Permit Temcon 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM DT# 5 & 6
8 0501 Hot Work Permit Advanced Elements 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM Camp Area
9 0502 Hot Work Permit Advanced Elements 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM Camp Area
10 0503 Hot Work Permit Advanced Elements 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM Camp Area
11 0505 Hot Work Permit Advanced Elements 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
12 0506 Hot Work Permit Advanced Elements 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
13 0507 Hot Work Permit Advanced Elements 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM Camp Area (RO)
14 0508 Hot Work Permit Advanced Elements 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM Camp Area
15 0509 Hot Work Permit Advanced Elements 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM Camp Area
16 0511 Hot Work Permit Hexagon 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM Camp Area
17 0512 Hot Work Permit Hexagon 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM Camp Area
18 0513 Hot Work Permit Hexagon 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM STP Area
19 0514 Hot Work Permit Advanced Elements 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM Road#1
20 0515 Hot Work Permit Hexagon 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM Camp Area
21 0519 Hot Work Permit Shade 12/Oct/2020 12/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
22 0389 Cold Work Permit Veolia 10/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM STP Area
23 0390 Cold Work Permit Veolia 10/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM RO Area
1 0516 Hot Work Permit Veolia 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM RO Area(Mech)
2 0517 Hot Work Permit Veolia 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM RO Area(Elect)
3 0518 Hot Work Permit Veolia 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM STP Area(Elect)
4 0520 Hot Work Permit Al-Rashed 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
5 0521 Hot Work Permit Pacific Ocean 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM Camp Area
6 0522 Hot Work Permit Shade 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
7 0523 Hot Work Permit Project Lines 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM Office Area
8 0524 Hot Work Permit Advanced Elements 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM Camp Area
9 0525 Hot Work Permit Advanced Elements 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM Camp Area
10 0526 Hot Work Permit Advanced Elements 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM Road#1,4&5
11 0527 Hot Work Permit Advanced Elements 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
12 0528 Hot Work Permit Advanced Elements 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM Camp Area
13 0529 Hot Work Permit Advanced Elements 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM Camp Area (RO)
14 0530 Hot Work Permit Advanced Elements 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM Camp Area
15 0531 Hot Work Permit Al-Aswad 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM Office Area
16 0532 Hot Work Permit Hexagon 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM Camp Area
17 0534 Hot Work Permit Hexagon 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM Camp Area
18 0535 Hot Work Permit Hexagon 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM STP Area
19 0536 Hot Work Permit Hexagon 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM Camp Area
20 0538 Hot Work Permit Temcon 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM DT#1,2,3,4&5
21 0539 Hot Work Permit Advanced Elements 13/Oct/2020 13/Oct/2020 07;00 AM 05;30 PM STP Area
22 0389 Cold Work Permit Veolia 10/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM STP Area
23 0390 Cold Work Permit Veolia 10/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM RO Area
1 0540 Hot Work Permit Shade 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
2 0541 Hot Work Permit Pacific Ocean 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM Camp Area(Rd#8)
3 0542 Hot Work Permit Al-Rashed 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
4 0543 Hot Work Permit Temcon 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM DT#1,2,3,4&5
5 0544 Hot Work Permit Advanced Elements 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM Camp Area
6 0545 Hot Work Permit Advanced Elements 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM Camp Area
7 0546 Hot Work Permit Project Lines 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
8 0548 Hot Work Permit Advanced Elements 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM STP Area
9 0549 Hot Work Permit Advanced Elements 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM Road#1,4&5
10 0550 Hot Work Permit Advanced Elements 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM Camp Area
11 0551 Hot Work Permit Advanced Elements 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM Camp Area
12 0552 Hot Work Permit Advanced Elements 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM Camp Area
13 0553 Hot Work Permit Hexagon 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM Camp Area
14 0554 Hot Work Permit Hexagon 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM Camp Area
15 0555 Hot Work Permit Hexagon 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM STP Area
16 0556 Hot Work Permit Hexagon 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM Camp Area
17 0557 Hot Work Permit Advanced Elements 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
18 0558 Hot Work Permit Veolia 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM RO Area(Mech)
19 0559 Hot Work Permit Veolia 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM RO Area(Elect)
20 0560 Hot Work Permit Veolia 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM STP Area(Elect)
21 0561 Hot Work Permit Al-Aswad 14/Oct/2020 14/Oct/2020 07;00 AM 05;30 PM Camp Area
22 0393 Cold Work Permit Advanced Elements 14/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
23 0389 Cold Work Permit Veolia 10/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM STP Area
24 0390 Cold Work Permit Veolia 10/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM RO Area
1 0562 Hot Work Permit Shade 15/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM Camp Area
2 0563 Hot Work Permit Al-Rashed 15/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM Camp Area
3 0564 Hot Work Permit Pacific Ocean 15/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM Camp Area(Rd#8)
4 0565 Hot Work Permit Veolia 15/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM RO Area(Mech)
5 0566 Hot Work Permit Veolia 15/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM RO Area(Elect)
6 0567 Hot Work Permit Veolia 15/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM STP Area(Elect)
7 0569 Hot Work Permit Advanced Elements 15/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM Camp Area
8 0570 Hot Work Permit Advanced Elements 15/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM Camp Area
9 0572 Hot Work Permit Advanced Elements 15/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM Road#1,4&5
10 0573 Hot Work Permit Temcon 15/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM DT#1,2,3,4&5
11 0574 Hot Work Permit Advanced Elements 15/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM Camp Area
12 0575 Hot Work Permit Advanced Elements 15/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
13 0576 Hot Work Permit Advanced Elements 15/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM STP Area
14 0601 Hot Work Permit Hexagon 15/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM Camp Area
15 0602 Hot Work Permit Hexagon 15/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM STP Area
16 0603 Hot Work Permit Hexagon 15/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM Camp Area
17 0604 Hot Work Permit Hexagon 15/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM Camp Area
18 0605 Hot Work Permit Advanced Elements 15/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM Camp Area
19 0606 Hot Work Permit Advanced Elements 15/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM Camp Area
20 0393 Cold Work Permit Advanced Elements 14/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
21 0389 Cold Work Permit Veolia 10/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM STP Area
22 0390 Cold Work Permit Veolia 10/Oct/2020 15/Oct/2020 07;00 AM 05;30 PM RO Area
1 0588 Hot Work Permit Shade 16/Oct/2020 16/Oct/2020 07;00 AM 05;30 PM Road#1
1 0568 Hot Work Permit Project Lines 17/Oct/2020 17/Oct/2020 07;00 AM 05;30 PM Office Area
2 0577 Hot Work Permit Veolia 17/Oct/2020 17/Oct/2020 07;00 AM 05;30 PM STP Area(Elect)
3 0578 Hot Work Permit Veolia 17/Oct/2020 17/Oct/2020 07;00 AM 05;30 PM RO Area(Mech)
4 0579 Hot Work Permit Veolia 17/Oct/2020 17/Oct/2020 07;00 AM 05;30 PM RO Area(Elect)
5 0580 Hot Work Permit Al-Rashed 17/Oct/2020 17/Oct/2020 07;00 AM 05;30 PM Camp Area
6 0581 Hot Work Permit Advanced Elements 17/Oct/2020 17/Oct/2020 07;00 AM 05;30 PM Camp Area
7 0582 Hot Work Permit Advanced Elements 17/Oct/2020 17/Oct/2020 07;00 AM 05;30 PM STP Area
8 0583 Hot Work Permit Advanced Elements 17/Oct/2020 17/Oct/2020 07;00 AM 05;30 PM Office Area
9 0584 Hot Work Permit Advanced Elements 17/Oct/2020 17/Oct/2020 07;00 AM 05;30 PM Road#1,4&5
10 0585 Hot Work Permit Advanced Elements 17/Oct/2020 17/Oct/2020 07;00 AM 05;30 PM Camp Area
11 0586 Hot Work Permit Advanced Elements 17/Oct/2020 17/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
12 0589 Hot Work Permit Shade 17/Oct/2020 17/Oct/2020 07;00 AM 05;30 PM Road#1
13 0607 Hot Work Permit Advanced Elements 17/Oct/2020 17/Oct/2020 07;00 AM 05;30 PM Camp Area
14 0608 Hot Work Permit Advanced Elements 17/Oct/2020 17/Oct/2020 07;00 AM 05;30 PM Camp Area
15 0609 Hot Work Permit Hexagon 17/Oct/2020 17/Oct/2020 07;00 AM 05;30 PM Camp Area
16 0610 Hot Work Permit Hexagon 17/Oct/2020 17/Oct/2020 07;00 AM 05;30 PM Camp Area
17 0611 Hot Work Permit Hexagon 17/Oct/2020 17/Oct/2020 07;00 AM 05;30 PM STP Area
18 0612 Hot Work Permit Hexagon 17/Oct/2020 17/Oct/2020 07;00 AM 05;30 PM Camp&RO Area
19 0395 Cold Work Permit Veolia 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM STP Area
20 0396 Cold Work Permit Veolia 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM RO Area
22 0398 Cold Work Permit Advanced Elements 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
23 0399 Cold Work Permit Advanced Elements 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM RO Area
1 0587 Hot Work Permit Project Lines 18/Oct/2020 18/Oct/2020 07;00 AM 05;30 PM Office Area
2 0590 Hot Work Permit Veolia 18/Oct/2020 18/Oct/2020 07;00 AM 05;30 PM STP Area
3 0591 Hot Work Permit Veolia 18/Oct/2020 18/Oct/2020 07;00 AM 05;30 PM RO Area
4 0592 Hot Work Permit Advanced Elements 18/Oct/2020 18/Oct/2020 07;00 AM 05;30 PM Camp Area
5 0593 Hot Work Permit Advanced Elements 18/Oct/2020 18/Oct/2020 07;00 AM 05;30 PM STP Area
6 0594 Hot Work Permit Advanced Elements 18/Oct/2020 18/Oct/2020 07;00 AM 05;30 PM Office Area
7 0595 Hot Work Permit Advanced Elements 18/Oct/2020 18/Oct/2020 07;00 AM 05;30 PM Camp Area
8 0596 Hot Work Permit Advanced Elements 18/Oct/2020 18/Oct/2020 07;00 AM 05;30 PM Road#1,4&5
9 0597 Hot Work Permit Advanced Elements 18/Oct/2020 18/Oct/2020 07;00 AM 05;30 PM Camp Area
10 0598 Hot Work Permit Advanced Elements 18/Oct/2020 18/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
11 0599 Hot Work Permit Shade 18/Oct/2020 18/Oct/2020 06;00 AM 06;00 PM Office Area
12 0600 Hot Work Permit Al-Rashed 18/Oct/2020 18/Oct/2020 07;00 AM 05;30 PM Camp Area
13 0615 Hot Work Permit Hexagon 18/Oct/2020 18/Oct/2020 07;00 AM 05;30 PM STP Area
14 0616 Hot Work Permit Hexagon 18/Oct/2020 18/Oct/2020 07;00 AM 05;30 PM Camp Area
15 0617 Hot Work Permit Hexagon 18/Oct/2020 18/Oct/2020 07;00 AM 05;30 PM Camp&RO Area
16 0618 Hot Work Permit Hexagon 18/Oct/2020 18/Oct/2020 07;00 AM 05;30 PM Camp Area
17 0619 Hot Work Permit Advanced Elements 18/Oct/2020 18/Oct/2020 07;00 AM 05;30 PM Camp Area
18 0620 Hot Work Permit Advanced Elements 18/Oct/2020 18/Oct/2020 07;00 AM 05;30 PM Camp Area
19 0109 Confined Space Veolia 18/Oct/2020 18/Oct/2020 07;00 AM 05;30 PM STP Area
20 0395 Cold Work Permit Veolia 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM STP Area
21 0396 Cold Work Permit Veolia 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM RO Area
23 0398 Cold Work Permit Advanced Elements 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
24 0399 Cold Work Permit Advanced Elements 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM RO Area
1 0651 Hot Work Permit Shade 19/Oct/2020 19/Oct/2020 06;00 AM 06;00 PM Office Area
2 0652 Hot Work Permit Al-Rashed 19/Oct/2020 19/Oct/2020 07;00 AM 05;30 PM Camp Area
3 0653 Hot Work Permit Project Lines 19/Oct/2020 19/Oct/2020 07;00 AM 05;30 PM Office Area
4 0654 Hot Work Permit Advanced Elements 19/Oct/2020 19/Oct/2020 07;00 AM 05;30 PM STP Area
5 0655 Hot Work Permit Advanced Elements 19/Oct/2020 19/Oct/2020 07;00 AM 05;30 PM Camp Area
6 0656 Hot Work Permit Advanced Elements 19/Oct/2020 19/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
7 0657 Hot Work Permit Advanced Elements 19/Oct/2020 19/Oct/2020 07;00 AM 05;30 PM Road#1,4&5
8 0658 Hot Work Permit Advanced Elements 19/Oct/2020 19/Oct/2020 07;00 AM 05;30 PM Camp Area
9 0659 Hot Work Permit Veolia 19/Oct/2020 19/Oct/2020 07;00 AM 05;30 PM RO Area
10 0660 Hot Work Permit Veolia 19/Oct/2020 19/Oct/2020 07;00 AM 05;30 PM STP Area
11 0661 Hot Work Permit Advanced Elements 19/Oct/2020 19/Oct/2020 07;00 AM 05;30 PM RO Area
12 0621 Hot Work Permit Hexagon 19/Oct/2020 19/Oct/2020 07;00 AM 05;30 PM Camp Area
13 0622 Hot Work Permit Hexagon 19/Oct/2020 19/Oct/2020 07;00 AM 05;30 PM Camp&RO Area
14 0623 Hot Work Permit Hexagon 19/Oct/2020 19/Oct/2020 07;00 AM 05;30 PM STP Area
15 0624 Hot Work Permit Hexagon 19/Oct/2020 19/Oct/2020 07;00 AM 05;30 PM Camp&RO Area
16 0625 Hot Work Permit Hexagon 19/Oct/2020 19/Oct/2020 07;00 AM 05;30 PM Camp Area
17 0626 Hot Work Permit Advanced Elements 19/Oct/2020 19/Oct/2020 07;00 AM 05;30 PM Camp Area
18 0627 Hot Work Permit Advanced Elements 19/Oct/2020 19/Oct/2020 07;00 AM 05;30 PM Camp&RO Area
19 0110 Confined Space Veolia 19/Oct/2020 19/Oct/2020 07;00 AM 05;30 PM STP Area
20 0111 Confined Space Advanced Elements 19/Oct/2020 19/Oct/2020 07;00 AM 05;30 PM RO Area
21 0338 Lifting Permit Hexagon 19/Oct/2020 19/Oct/2020 07;00 AM 05;30 PM Camp Area
22 0395 Cold Work Permit Veolia 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM STP Area
23 0396 Cold Work Permit Veolia 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM RO Area
25 0399 Cold Work Permit Advanced Elements 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM RO Area
1 0662 Hot Work Permit Shade 20/Oct/2020 20/Oct/2020 06;00 AM 05;30 PM Office&Helipad Area
2 0663 Hot Work Permit Al-Rashed 20/Oct/2020 20/Oct/2020 07;00 AM 05;30 PM Camp Area
3 0664 Hot Work Permit Project Lines 20/Oct/2020 20/Oct/2020 07;00 AM 05;30 PM Office Area
4 0665 Hot Work Permit Advanced Elements 20/Oct/2020 20/Oct/2020 07;00 AM 05;30 PM Camp Area
5 0666 Hot Work Permit Advanced Elements 20/Oct/2020 20/Oct/2020 07;00 AM 05;30 PM STP Area
6 0668 Hot Work Permit Advanced Elements 20/Oct/2020 20/Oct/2020 07;00 AM 05;30 PM Road#1,4&5
7 0669 Hot Work Permit Veolia 20/Oct/2020 20/Oct/2020 07;00 AM 05;30 PM RO Area
8 0670 Hot Work Permit Veolia 20/Oct/2020 20/Oct/2020 07;00 AM 05;30 PM STP Area
9 0671 Hot Work Permit Advanced Elements 20/Oct/2020 20/Oct/2020 07;00 AM 05;30 PM Camp Area
10 0672 Hot Work Permit Advanced Elements 20/Oct/2020 20/Oct/2020 07;00 AM 05;30 PM Office Area
11 0673 Hot Work Permit Advanced Elements 20/Oct/2020 20/Oct/2020 07;00 AM 05;30 PM Helipad Area
12 0628 Hot Work Permit Advanced Elements 20/Oct/2020 20/Oct/2020 07;00 AM 05;30 PM Camp Area
13 0629 Hot Work Permit Advanced Elements 20/Oct/2020 20/Oct/2020 07;00 AM 05;30 PM Camp Area
14 0630 Hot Work Permit Hexagon 20/Oct/2020 20/Oct/2020 07;00 AM 05;30 PM Camp Area PH#10
15 0631 Hot Work Permit Hexagon 20/Oct/2020 20/Oct/2020 07;00 AM 05;30 PM Camp&RO Area
16 0632 Hot Work Permit Hexagon 20/Oct/2020 20/Oct/2020 07;00 AM 05;30 PM STP Area
17 0633 Hot Work Permit Hexagon 20/Oct/2020 20/Oct/2020 07;00 AM 05;30 PM Camp&RO Area
18 0613 Hot Work Permit Hexagon 20/Oct/2020 20/Oct/2020 07;00 AM 05;30 PM Camp Area
19 0339 Lifting Permit Hexagon 20/Oct/2020 20/Oct/2020 07;00 AM 05;30 PM Camp Area
20 0112 Confined Space Advanced Elements 20/Oct/2020 20/Oct/2020 07;00 AM 05;30 PM Camp Area
21 0113 Confined Space Veolia 20/Oct/2020 20/Oct/2020 07;00 AM 05;30 PM STP Area
22 0395 Cold Work Permit Veolia 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM STP Area
23 0396 Cold Work Permit Veolia 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM RO Area
25 0399 Cold Work Permit Advanced Elements 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM RO Area
26 0400 Cold Work Permit Advanced Elements 20/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
1 0675 Hot Work Permit Al-Rashed 21/Oct/2020 21/Oct/2020 07;00 AM 05;30 PM Camp Area
2 0677 Hot Work Permit Advanced Elements 21/Oct/2020 21/Oct/2020 07;00 AM 05;30 PM Camp Area
3 0680 Hot Work Permit Veolia 21/Oct/2020 21/Oct/2020 07;00 AM 05;30 PM RO Area
4 0681 Hot Work Permit Veolia 21/Oct/2020 21/Oct/2020 07;00 AM 05;30 PM STP Area
5 0682 Hot Work Permit Advanced Elements 21/Oct/2020 21/Oct/2020 07;00 AM 05;30 PM Road#1,4&5
6 0683 Hot Work Permit Advanced Elements 21/Oct/2020 21/Oct/2020 07;00 AM 05;30 PM Camp Area
7 0635 Hot Work Permit Hexagon 21/Oct/2020 21/Oct/2020 07;00 AM 05;30 PM Camp Area
8 0637 Hot Work Permit Hexagon 21/Oct/2020 21/Oct/2020 07;00 AM 05;30 PM Camp Area
9 0638 Hot Work Permit Hexagon 21/Oct/2020 21/Oct/2020 07;00 AM 05;30 PM Camp Area
10 0639 Hot Work Permit Advanced Elements 21/Oct/2020 21/Oct/2020 07;00 AM 05;30 PM Camp Area
11 0640 Hot Work Permit Advanced Elements 21/Oct/2020 21/Oct/2020 07;00 AM 05;30 PM Camp Area
12 0641 Hot Work Permit Advanced Elements 21/Oct/2020 21/Oct/2020 07;00 AM 05;30 PM Camp Area
S.No. Permit No. Description Contractor Issued Date Valid Date Starting time End Time Location Remarks
13 0115 Confined Space Advanced Elements 21/Oct/2020 21/Oct/2020 07;00 AM 05;30 PM Camp Area
14 0395 Cold Work Permit Veolia 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM STP Area
15 0396 Cold Work Permit Veolia 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM RO Area
17 0399 Cold Work Permit Advanced Elements 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM RO Area
18 0400 Cold Work Permit Advanced Elements 20/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
1 0684 Hot Work Permit Al-Rashed 22/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM Camp Area
2 0689 Hot Work Permit Veolia 22/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM STP Area
3 0690 Hot Work Permit Veolia 22/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM RO Area
4 0697 Hot Work Permit Advanced Elements 22/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM Camp/RO Area
5 0395 Cold Work Permit Veolia 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM STP Area
6 0396 Cold Work Permit Veolia 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM RO Area
8 0398 Cold Work Permit Advanced Elements 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
9 0399 Cold Work Permit Advanced Elements 17/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM RO Area
10 0400 Cold Work Permit Advanced Elements 20/Oct/2020 22/Oct/2020 07;00 AM 05;30 PM Camp&OfficeArea
1 0698 Hot Work Permit Advanced Elements 24/Oct/2020 24/Oct/2020 07;00 AM 05;30 PM Camp Area
2 0701 Hot Work Permit Al-Rashed 24/Oct/2020 24/Oct/2020 07;00 AM 05;30 PM Camp Area
3 0702 Hot Work Permit Shade 24/Oct/2020 24/Oct/2020 07;00 AM 05;30 PM Helipad&Office Area
4 0694 Hot Work Permit Veolia 24/Oct/2020 24/Oct/2020 07;00 AM 05;30 PM RO Area
5 0695 Hot Work Permit Veolia 24/Oct/2020 24/Oct/2020 07;00 AM 05;30 PM STP Area
6 0403 Cold Work Permit Veolia 24/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM RO Area
1 0699 Hot Work Permit Advanced Elements 25/Oct/2020 25/Oct/2020 07;00 AM 05;30 PM Camp Area
2 0704 Hot Work Permit Veolia 25/Oct/2020 25/Oct/2020 07;00 AM 05;30 PM STP Area
3 0705 Hot Work Permit Veolia 25/Oct/2020 25/Oct/2020 07;00 AM 05;30 PM RO Area
4 0706 Hot Work Permit Shade 25/Oct/2020 25/Oct/2020 06;00 AM 05;30 PM Office Area
5 0707 Hot Work Permit Al-Rashed 25/Oct/2020 25/Oct/2020 07;00 AM 05;30 PM Camp Area
6 0403 Cold Work Permit Veolia 25/Oct/2020 25/Oct/2020 07;00 AM 05;30 PM RO Area
1 0710 Hot Work Permit Al-Rashed 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM Camp Area
2 0711 Hot Work Permit Veolia 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM STP Area
3 0712 Hot Work Permit Veolia 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM RO Area
4 0713 Hot Work Permit Shade 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM Office Area
5 0714 Hot Work Permit Sawaed Al Bandar 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM Camp Area
6 0685 Hot Work Permit Advanced Elements 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM Camp Area
7 0686 Hot Work Permit Advanced Elements 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM STP Area
8 0687 Hot Work Permit Advanced Elements 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM Office Area
9 0688 Hot Work Permit Advanced Elements 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM Helipad Area
10 0691 Hot Work Permit Advanced Elements 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM Road#1,4&5
11 0692 Hot Work Permit Advanced Elements 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM RO Area
12 0703 Hot Work Permit Advanced Elements 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM Camp Area
13 0708 Hot Work Permit Advanced Elements 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM Camp Area
14 0709 Hot Work Permit Advanced Elements 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM Office Area
15 0648 Hot Work Permit Hexagon 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM Camp Area
16 0751 Hot Work Permit Hexagon 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM STP Area
17 0752 Hot Work Permit Hexagon 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM Camp Area
18 0753 Hot Work Permit Hexagon 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM Camp Area
19 0754 Hot Work Permit Hexagon 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM Office Area
20 0755 Hot Work Permit Advanced Elements 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM Office Area
21 0756 Hot Work Permit Advanced Elements 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM Camp/RO Area
22 0757 Hot Work Permit Al-Aswad 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM RO Area
23 0341 Lifting Permit Hexagon 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM Camp Area
24 0120 Confined Space Advanced Elements 26/Oct/2020 26/Oct/2020 07;00 AM 05;30 PM Camp/RO Area
25 0403 Cold Work Permit Veolia 25/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM RO Area
1 0716 Hot Work Permit Al-Rashed 27/Oct/2020 27/Oct/2020 07;00 AM 05;30 PM Camp Area
2 0718 Hot Work Permit Veolia 27/Oct/2020 27/Oct/2020 07;00 AM 05;30 PM RO Area
3 0727 Hot Work Permit Veolia 27/Oct/2020 27/Oct/2020 07;00 AM 05;30 PM STP Area
4 0723 Hot Work Permit X-Smart 27/Oct/2020 27/Oct/2020 07;00 AM 05;30 PM STP Area
5 0724 Hot Work Permit Project Lines 27/Oct/2020 27/Oct/2020 07;00 AM 05;30 PM Camp Area
6 0725 Hot Work Permit Sawaed Al Bandar 27/Oct/2020 27/Oct/2020 07;00 AM 05;30 PM Camp Area
7 0726 Hot Work Permit Sawaed Al Bandar 27/Oct/2020 27/Oct/2020 07;00 AM 05;30 PM Helipad Area
8 0719 Hot Work Permit Advanced Elements 27/Oct/2020 27/Oct/2020 07;00 AM 05;30 PM Camp Area
9 0720 Hot Work Permit Advanced Elements 27/Oct/2020 27/Oct/2020 07;00 AM 05;30 PM Office Area
10 0721 Hot Work Permit Advanced Elements 27/Oct/2020 27/Oct/2020 07;00 AM 05;30 PM RO Area
11 0728 Hot Work Permit Advanced Elements 27/Oct/2020 27/Oct/2020 07;00 AM 05;30 PM Road #1,3,4&5
12 0729 Hot Work Permit Advanced Elements 27/Oct/2020 27/Oct/2020 07;00 AM 05;30 PM Camp Area
13 0730 Hot Work Permit Advanced Elements 27/Oct/2020 27/Oct/2020 07;00 AM 05;30 PM Office Area
14 0732 Hot Work Permit Shade 27/Oct/2020 27/Oct/2020 07;00 AM 05;30 PM Office/Camp Area
15 0758 Hot Work Permit Advanced Elements 27/Oct/2020 27/Oct/2020 07;00 AM 05;30 PM Camp / RO Area
16 0759 Hot Work Permit Advanced Elements 27/Oct/2020 27/Oct/2020 07;00 AM 05;30 PM Office Area
17 0649 Hot Work Permit Hexagon 27/Oct/2020 27/Oct/2020 07;00 AM 05;30 PM Camp Area
18 0403 Cold Work Permit Veolia 24/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM RO Area
19 0404 Cold Work Permit 3S 27/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM Camp&Office Area
20 0406 Cold Work Permit Advanced Elements 27/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM RO Area
1 0733 Hot Work Permit Al-Rashed 28/Oct/2020 28/Oct/2020 07;00 AM 05;30 PM Camp Area
2 0734 Hot Work Permit Shade 28/Oct/2020 28/Oct/2020 07;00 AM 05;30 PM Helipad&Office Area
3 0735 Hot Work Permit Veolia 28/Oct/2020 28/Oct/2020 07;00 AM 05;30 PM STP Area
4 0736 Hot Work Permit Veolia 28/Oct/2020 28/Oct/2020 07;00 AM 05;30 PM RO Area
5 0737 Hot Work Permit Advanced Elements 28/Oct/2020 28/Oct/2020 07;00 AM 05;30 PM Camp Area
6 0738 Hot Work Permit Advanced Elements 28/Oct/2020 28/Oct/2020 07;00 AM 05;30 PM Office Area
7 0739 Hot Work Permit Advanced Elements 28/Oct/2020 28/Oct/2020 07;00 AM 05;30 PM Road #1,3,4&5
8 0740 Hot Work Permit Advanced Elements 28/Oct/2020 28/Oct/2020 07;00 AM 05;30 PM Office Area
9 0741 Hot Work Permit Project Lines 28/Oct/2020 28/Oct/2020 07;00 AM 05;30 PM Camp Area
10 0742 Hot Work Permit Sawaed Al Bandar 28/Oct/2020 28/Oct/2020 07;00 AM 05;30 PM Camp Area
11 0762 Hot Work Permit Hexagon 28/Oct/2020 28/Oct/2020 07;00 AM 05;30 PM Camp Area
12 0763 Hot Work Permit Hexagon 28/Oct/2020 28/Oct/2020 07;00 AM 05;30 PM STP Area
13 0650 Hot Work Permit Hexagon 28/Oct/2020 28/Oct/2020 07;00 AM 05;30 PM Camp Area
14 0760 Hot Work Permit Advanced Elements 28/Oct/2020 28/Oct/2020 07;00 AM 05;30 PM Camp / RO Area
15 0761 Hot Work Permit Advanced Elements 28/Oct/2020 28/Oct/2020 07;00 AM 05;30 PM Office Area
16 0403 Cold Work Permit Veolia 24/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM RO Area
17 0404 Cold Work Permit 3S 27/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM Camp&Office Area
18 0406 Cold Work Permit Advanced Elements 27/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM RO Area
1 0745 Hot Work Permit Advanced Elements 29/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM Road #1,3,4&5
2 0746 Hot Work Permit Advanced Elements 29/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM Office Area
3 0748 Hot Work Permit Project Lines 29/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM Camp Area
4 0749 Hot Work Permit Sawaed Al Bandar 29/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM Camp Area
5 0750 Hot Work Permit Advanced Elements 29/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM RO Area
6 1001 Hot Work Permit Shade 29/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM Office Area
7 1002 Hot Work Permit Al-Rashed 29/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM Camp Area
8 1003 Hot Work Permit Advanced Elements 29/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM STP Area
9 1004 Hot Work Permit Veolia 29/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM RO Area
10 1005 Hot Work Permit Veolia 29/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM STP Area
11 1006 Hot Work Permit X-Smart 29/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM STP Area
12 1007 Hot Work Permit X-Smart 29/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM RO Area
13 1008 Hot Work Permit Hexagon 29/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM STP Area
14 1009 Hot Work Permit Hexagon 29/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM Camp Area
15 1011 Hot Work Permit Advanced Elements 29/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM Laydown Area
16 1012 Hot Work Permit Advanced Elements 29/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM Office Area
17 0766 Hot Work Permit Hexagon 29/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM Camp Area
18 0767 Hot Work Permit Advanced Elements 29/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM Office Area
19 0768 Hot Work Permit Advanced Elements 29/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM Camp Area
20 0122 Confined Space Advanced Elements 29/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM RO Area
21 0403 Cold Work Permit Veolia 24/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM RO Area
22 0404 Cold Work Permit 3S 27/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM Camp&Office Area
23 0406 Cold Work Permit Advanced Elements 27/Oct/2020 29/Oct/2020 07;00 AM 05;30 PM RO Area
1 1013 Hot Work Permit Al-Rashed 31/Oct/2020 31/Oct/2020 07;00 AM 05;30 PM Camp Area
2 1015 Hot Work Permit Veolia 31/Oct/2020 31/Oct/2020 07;00 AM 05;30 PM STP Area
3 1016 Hot Work Permit Veolia 31/Oct/2020 31/Oct/2020 07;00 AM 05;30 PM RO Area
4 1017 Hot Work Permit Shade 31/Oct/2020 31/Oct/2020 07;00 AM 05;30 PM Camp&Office Area
5 1018 Hot Work Permit Advanced Elements 31/Oct/2020 31/Oct/2020 07;00 AM 05;30 PM STP Area
6 1019 Hot Work Permit Advanced Elements 31/Oct/2020 31/Oct/2020 07;00 AM 05;30 PM RO Area
7 1020 Hot Work Permit Advanced Elements 31/Oct/2020 31/Oct/2020 07;00 AM 05;30 PM Road #1,3,4&5
8 1021 Hot Work Permit X-Smart 31/Oct/2020 31/Oct/2020 07;00 AM 05;30 PM STP Area
9 1022 Hot Work Permit X-Smart 31/Oct/2020 31/Oct/2020 07;00 AM 05;30 PM RO Area
10 1023 Hot Work Permit Advanced Elements 31/Oct/2020 31/Oct/2020 07;00 AM 05;30 PM Camp Area
11 1024 Hot Work Permit Advanced Elements 31/Oct/2020 31/Oct/2020 07;00 AM 05;30 PM Office Area
12 1025 Hot Work Permit Project Lines 31/Oct/2020 31/Oct/2020 07;00 AM 05;30 PM Camp Area
13 1026 Hot Work Permit Sawaed Al Bandar 31/Oct/2020 31/Oct/2020 07;00 AM 05;30 PM Camp Area
14 1027 Hot Work Permit Hexagon 31/Oct/2020 31/Oct/2020 07;00 AM 05;30 PM Camp Area
15 1028 Hot Work Permit Hexagon 31/Oct/2020 31/Oct/2020 07;00 AM 05;30 PM STP Area
16 0769 Hot Work Permit Advanced Elements 31/Oct/2020 31/Oct/2020 07;00 AM 05;30 PM Camp Area
17 0770 Hot Work Permit Advanced Elements 31/Oct/2020 31/Oct/2020 07;00 AM 05;30 PM Office Area
18 0771 Hot Work Permit Hexagon 31/Oct/2020 31/Oct/2020 07;00 AM 05;30 PM Camp Area
19 0407 Cold Work Permit 3S 31/Oct/2020 5/Nov/2020 07;00 AM 05;30 PM Camp Area
20 0409 Cold Work Permit Veolia 31/Oct/2020 5/Nov/2020 07;00 AM 05;30 PM RO Area
21 0410 Cold Work Permit Advanced Elements 31/Oct/2020 5/Nov/2020 07;00 AM 05;30 PM RO Area