PHASE II CONSTRUCTION SEQUENCE:

A. PERFORM ROAD GRADING / PAD GRADING / STORM


DRAINAGE INSTALLATION.
B. INSTALL UTILITIES.
C. INSTALL TEMPORARY / PERMANENT GRASSING.
D. CONSTRUCT BUILDINGS
E. INSTALL ASPHALT.
B1
F. PERMANENT GRASS SHALL BE INSTALLED FOR ALL
AREAS AT FINAL GRADE.
G. MAINTAIN ALL SEDIMENT CONTROL MEASURES UNTIL
ALL DISTURBED AREAS HAVE STABILIZED.
H. AFTER COMPLETION OF CONSTRUCTION AND THE SITE
B2
IS STABILIZED, AND APPROVED BY CHEROKEE
COUNTY, REMOVE ALL ACCUMULATED SEDIMENT FROM
SEDIMENT TRAPPING MEASURES AND REMOVE ALL
TEMPORARY SEDIMENT CONTROL DEVICES. CLEAN
ANY ACCUMULATED SEDIMENT FROM POND.
I. AS BUILT PLANS WILL BE REQUIRED BY ENGINEER.

BLDG. 2

BLDG. 1

B3

B4

Stonecrest Apartments

Cherokee County, SC
Expansion
BLDG. 3

CLUB
HOUSE B8

B7

STORMWATER SCHEDULE NOTES:


1. ALL 10" PIPE TO BE ADS N-12 HDPE. POOL
2. ALL LARGER PIPE TO BE RCP UNLESS OTHERWISE NOTED.
3. ALL PIPE OUTFALLS TO HAVE FLARED END SECTION. B6

B5 B9