Problem 1
Design dynamic compaction to densify 12 m thick loose soil with a low bearing capacity which
consists of poorly-graded sand & silt. The total site area is about 25 m * 60 m. The geotechnical
engineer determined that ground improvement for a 20 m * 40 m zone is required to prevent
liquefaction under the design earthquake peak ground acceleration. The weight and diameter of the
tamper are 20 Mg and 5 m respectively. Design specifications include (i) Height of drop, (ii) No of
passes for certain energy requirements and (iii) sketches of phase design & energy.