You are on page 1of 6

Company : PT.

Thermax International Indonesia


Project : Loading Boiler ARA HP60BB
Work Title : Loading Boiler ARA HP60BB
Date of Erection : 27 January 2021

PLAN AND CHEKLIST FOR LIFTING WORK

NO DESCRIPTION MAIN CRANE MAIN CRANE


I. CRANE TYPE AND MODEL ZOOMLION QY55V ZOOMLION QY55V
II. ERECTION LOAD
1, Erection Weight 31,0 ton
2, Weight of Shackle, Sling, 1,0 ton
3, Weight of Hook Block 3,0 ton
4, Weight of Lifting Beam ton
Total Load 35,0
III. CRANE DATA'S
1, Crane Capacity 50,0 ton
2, Crane Condition 90,0 %
3, Existing Boom Length 13,5 m
4, Load Line Reeving 2x3 line
545,0 kg
5, Hook Block Capacity
5,0 m
6, Working Radius
41,0 ton
7, Lifting Capacity

IV. SAFETY FACTOR


Lifting Capacity x Crane Condition 1,05
Total Load

V. LIFTING DEVICE
1. Wire Sling ( Dia x Length ) 2" x 6 m 2 pc minimum size 1,5''
2. Max Breaking Force of Sling 1700,0 Kg
3, Sling Quantity to be Used 2,0 pc
4, Sling Wire Arrangement ( see attached ) -
5, Sling Wire SWL 11,0 ton
17,0 ton
6, Shackle SWL
- ton
7, Spreader / Lifting Beam SWL
- ton
8. Chain Block / Lever Block SWL
VI. GROUND CONDITION
VII. Overhead or Underground Obstruction
VIII. Setting Elevation of Equipment
31 t
1t
3t
35 t

50 t
90%
13,5 m
545 kg
5m
41 ton

1,05

13500

1,5”x6m, 2pcs

SWL 17t, 2pcs

ZOOMLION QY55V LOAD 31T


CAP 50T

ADAM