HORIZON INDONESIA TERMINALS PTE LTD

ENGINEERING, PROCUREMENT AND CONSTRUCTION OF OIL TERMINAL


FACILITIES AT MERAK, INDONESIA
Document No : HITPL/146/08/D 15

SPECIFICATIONS FOR FIRE PROTECTION SYSTEM

CONTENTS

Section Description

1.0 Introduction

2.0 Fire Protection System General

3.0 Fire Water Hydrant System

4.0 Fire Water Pumps

5.0 Water Sprinkler or Deluge System

6.0 Foam System

7.0 Fire Hose Reel System

8.0 Portable Extinguishers

9.0 Mobile Foam Extinguishers

10.0 Mobile Foam Water Monitors

11.0 Fixed Foam/Water Monitors

12.0 Jetty Fire Fighting Requirements

13.0 Eyewash & Safety Shower

14.0 Piping Specification

15.0 Testing and Commissioning

16.0 Data Sheets

Fire Protection Philosophy Page 1 of 16


HORIZON INDONESIA TERMINALS PTE LTD

ENGINEERING, PROCUREMENT AND CONSTRUCTION OF OIL TERMINAL


FACILITIES AT MERAK, INDONESIA
SPECIFICATION FOR FIRE PROTECTION SYSTEM

1.0 Introduction
Fire protection system shall consist of pressurized Fire water hydrant
system, foam system, water sprinkler system, hose reels, portable fire
extinguishers, fire alarm system etc. The system shall be installed to fully
meet NFPA (latest edition) requirements.
2.0 Fire Protection System General
2.1 The fire protection system for the terminal and associated facilities
shall be designed and constructed to meet Class 2/3 petroleum
products storage for tankfarm 1 and Class 1 petroleum products
storage for tankfarm 2
2.2 The facilities to be provided with fire protection shall include
petroleum product tanks / tankfarm, ship loading pump / manifold,
switch gear and transformer installations, Truck loading bay, truck
loading pump house, fire pump house, office building, inner / outer
jetty area etc.
2.3 The fire water system shall be a pressurized system and includes 3
nos. Fire water main pumps of which 1no electric motor driven and
the other 2 nos diesel engine driven.
2.4 One no. electric driven jockey pump (meeting NFPA) shall be
installed to pressurize the system
2.5 Firewater system shall be designed for Potable water service.
2.6 The fire fighting system shall be fed via pumps drawing water from
the new Fire Water Tank. The water inlet to the tank shall be from the
local authority system and the Tie in shall be finalized by the
Contractor
2.7 A New Fire water storage tank sized to store 4 hrs of maximum
credible fire fighting scenario. The credible fire fighting scenario shall
be considered based on the recommendation from Risk Assessment.

Fire Protection Philosophy Page 2 of 16


2.8 Portable fire fighting equipment as specified and recommended by
NFPA shall be provided for the facilities
2.9 All equipment utilised for fire fighting shall be suitable for Potable
water application.
2.10 Fire Water Pumps, Foam skids and foam proportioning units shall be
housed under a shed.
2.11 Fire klaxons or equivalent with 1 kilometer range to be provided
which shall operate on activation of fire alarm.
3.0 Fire Water Hydrant System
3.1 The fire water main shall be maintained at a positive pressure in
accordance to NFPA recommendation.
3.2 Fire water hydrant ring main shall be provided around the tank farm
and hydrant post with double outlet shall be provided
3.3 Any additional connections required as per the local authority
requirements shall also be provided.
3.4 The hydrants shall be provided with hose cabinet to house 2 nos fire
hoses and impact nozzles.
3.5 The fire main shall be laid such that hydrant take off points are
located to the side of the road away from the bunds.
3.6 Hydrant posts shall be located at every 45 Mts on the fire ring main
around tankfarm. The hydrants shall be placed at least 12 Mts away
from the Tanks.
3.7 Fire Hose Cabinets near each fire hydrant shall house 2 nos. 2½”
dia., 15 Mts long fire hoses and 2 nos impact nozzles.
3.8 Sectional Isolation valves shall be provided on the Fire water ring
main at every 300 metres for maintenance purpose
3.9 Hydrants shall be provided to cover the truck loading area and Jetty
in addition to the tank farm.
4.0 Fire Water Pumps
4.1 The capacity design basis for fire water shall be furnished by two
diesel engine driven pumps. In addition, standby capacity equal to at
least 50% of the capacity design basis shall be provided by one
electric motor driven pump.
4.2 The start of the main fire pumps and subsequent operation shall be
automated whereby additional pumps shall cut in as pressure
reduces due to water flow demands. Shut down of the Pumps shall
be manual.
4.3 Pump requirements and control philosophy shall be in accordance
with NFPA 20.

Fire Protection Philosophy Page 3 of 16


4.4 Fire pumps and drivers shall be dedicated and purpose built for fire
protection service complying with NFPA 20 requirements. However,
UL listing is not mandatory for the main fire pumps.
4.5 The pumps shall have discharge pressure sufficient to maintain the
desired fire protection system pressure and shall furnish not less
than 150 percent of rated capacity at not less than 65 percent of total
rated head. The shutoff head shall not exceed 140 percent of rated
head for any type pump.
4.6 Fire pump set controllers shall be UL listed.
4.7 Compliance to NFPA 20 shall be certified by a Third Party approved
by the Owner
4.8 Diesel day tanks as per NFPA shall be provided. Diesel supply for
the diesel engine day tanks shall be using mobile bulk tanker.
Provisions shall be available for diesel filling on the day tanks.
4.9 The on / off indication of all fire water pumps / jockey pumps shall be
provided in the control room
5.0 Water Sprinkler or Deluge System
5.1 Fire water requirement for worst case fire fighting scenario shall be
based on the Heat radiation analysis and as recommended by NFPA
5.2 A preliminary study indicates cooling water requirement of 1134 Cu
M/hr which need to be verified by contractor.
5.3 The proposed tank roofs being aluminum geodesic, no cooling rings
are required for tank roof. However, the shell portion shall be covered
by the water sprinkler application.
5.4 Deluge water application at 4 lpm / m2 of shell area shall be provided
for the storage tanks. The design shall add 20% contingency for the
Fire Water requirements.
5.5 Design and installation of water sprinkler system shall meet NFPA 13
and NFPA 15 requirements.
5.6 Sprinkler nozzles shall be suitable for deluge water application,
selected for a spray density. Nozzle selection shall be based on the
spray pattern arrangement of the selected nozzle. Contractor shall be
responsible for ensuring adequate area coverage and spray density.
Overlapping of spray area by 10% shall be considered to ensure
complete wetness of the Tank surface.
5.7 The manual control valve of the sprinkler ring line to the tank shall be
located outside the Tank Bundwall.
5.8 The sprinkler ring on the tanks shall be in three segments.
5.9 Automatic activation of the deluge ring with a parallel auxiliary ring
having thermal sensitive bulbs is NOT required.

Fire Protection Philosophy Page 4 of 16


5.10 Operation of control Valve shall be manual / local.
5.11 Contractor shall carryout hydraulic calculations and establish the
pressure required based on the following parameters
i Spray nozzle selected.
ii Worst case fire water application (including sprinkler system and
2 nos hydrants operation together) and foam/water application
scenario.
5.12 Fire sprinkler system shall be performance tested at the actual
operating conditions using water.
6.0 Foam System
6.1 The proposed tanks in Tankfarm 2 shall have foam pourers on shell
as per NFPA 11. The selection of the foam pourers shall be based on
full surface application. The number of foam pourers on the tank shall
meet NFPA requirement as a minimum.
6.2 The foam pourer shall be located on the tank shell. Foam pourers
shall be accessible for maintenance and suitable provisions shall be
provided on the tank for the same. (In case locating of foam pourers
on the tank shell results in not achieving the intended storage
capacity (gross/net) of the tanks, then the foam pourers shall be
located on the roof of the tanks.)
6.3 Foam solution ring main shall be provided around the tank farm along
side the Fire water main line. Foam 1½”dia risers with isolation
valves shall also be provided near each intermediate bundwall, pump
areas etc. by the side of the fire water riser location.
6.4 Type of Foam shall be Fluoro Protein and UL listed for application on
Hydrocarbon fires. (to be proposed for Employers approval).
6.5 Foam tank shall be sized to provide for a nominal period of 55
minutes operation for a full surface tank fire in the largest tank plus
10% contingency
6.6 The foam concentrate and foam proportioning system shall be
designed in accordance with NFPA 11. The foam tank and
proportioning system shall be installed to provide a guaranteed
uniform foam water solution, in accordance with NFPA.
6.7 Foam skid unit consisting of atmospheric Foam tank filled with foam
concentrate, foam pump with necessary control valves, balancing
valves, pipe work, fittings, etc as per NFPA 11 requirement shall be
provided.
6.8 The Foam Skid shall include the following but not limited to:
i Foam Storage Tank filled with foam.
ii Foam concentrate pump
iii In line pressure balance valve

Fire Protection Philosophy Page 5 of 16


iv Safety relief valves, strainer, pressure gauges, check valve,
isolation valves, couplings, pipes and fittings etc., as required.
6.9 The various components of the Foam proportioning unit shall be
assembled on a structural frame and installed on concrete
foundations
6.10 The Foam solution and Foam concentrate application rate shall be as
per NFPA.
6.11 The Foam Pump shall be Pelton wheel type, which shall be driven by
the Fire Water Pressure.
6.12 The Foam Proportioning Unit shall be calibrated venturi type, which
ensures the foam proportioning to the desired ratio.
6.13 An adjustable mechanism for the foam concentrate proportioning
shall be available to facilitate fine-tuning the proportioning ratio during
commissioning.
6.14 The foam proportioner shall be calibrated to 3% proportioning rate.
The pressure drop across the proportioner shall be kept to minimum.
6.15 Proportioners (Ratio Flow Controllers) shall be designed to meter the
correct amount of foam concentrate into the water stream. The body
and inlet of nozzle shall be cast in brass with flanged ends. The
Controller body shall have clear marking with flow direction arrow and
label to identify the type of foam concentrate and percentage ratio.
6.16 Foam pump and Proportioner shall be UL listed.
6.17 Diaphragm type pressure balanced valve shall be provided for the
foam proportioner in order to perform accurately over a range of
flows and pressures, if found necessary based on the system
performance. This shall be achieved by balancing the supply
pressure of the foam concentrate entering the proportioner with that
of the fire water at the inlet.
6.18 In order to provide visual confirmation about the pressure balance
achieved, a duplex pressure gauge shall be provided on the pressure
balanced valve. One connection of the gauge shall be connected to
the foam concentrate side of the pressure balanced valve and the
other connection shall be connected to the fire water side of the
pressure balanced valve. An isolation valve shall be provided on
each of the connections of the duplex pressure gauge.
6.19 The foam system including foam proportioner, foam pourers, foam
pump etc. shall be individually tested prior to the installed system
performance test.
6.20 The above are the minimum requirements and Contractor shall
supply all other accessories for the performance of the unit for the
intended purpose.

Fire Protection Philosophy Page 6 of 16


6.21 Foam Storage Tank
i The tank shall be constructed in GRP, designed as per good
engineering practice suitable for maximum operating pressure.
ii The tank assembly shall be vertical or horizontal and supported
on properly designed saddles / lugs with anchoring provisions.
iii The tank shall be coated with paint suitable for foam
concentrate and the local conditions.
iv Tank shall be supplied with full bore ball valves with SS 304 trim
and Teflon seats and permanently mounted on to the tank. All
valves shall be labeled showing normal working position.
v The foam tank shall have necessary drain, Level indicator,
manhole, access ladder, top platform, foam re-fill connections,
lifting lug etc.
vi The tank shall have all fittings and instruments as per NFPA.
vii The tank shall be designed and manufactured for 10%
oversized to allow for any thermal expansion of the foam
concentrate.
viii The tank supplied shall be with a label, identifying type of foam
concentrate, system design conditions, percentage ratio and
tank size.
7.0 Fire Hose Reel System
7.1 Two Hose reel system as per NFPA 30 shall be provided. The
system shall consist of 1” dia, 30 Mts long hard rubber hose with jet /
spray nozzle. The jet / spray nozzle shall be of metallic or durable
plastic construction. Hose reel system shall be designed to flow a
minimum of 115 lpm at a nozzle pressure of at least 3 Bar g.
7.2 The complete assembly shall be wall / post mounted, swing type. An
isolation valve (quarter turn ball valve) shall be installed upstream of
the hose reel to isolate the water supply.
8.0 Portable Extinguishers
8.1 The Contractor shall supply the following:
• Fifteen (15) nos. 9 kg DCP dry powder extinguishers.
• Ten (10) nos. 3 kg CO2 extinguishers
8.2 The extinguishers shall be suitable for type A, B, C fire. Operation of
the extinguishers shall be by means of a lever-operated valve
provided with a safety pin. There shall be a pressure indicator on the
extinguishers to indicate the pressure in the cylinder container.
8.3 The extinguishers shall be in accordance with BS 5423. Mounting
brackets shall be supplied and installed as per NFPA 10. Instructions
on the extinguishers shall be both in English and French.

Fire Protection Philosophy Page 7 of 16


8.4 Where the extinguishers are installed outdoor, a suitable metallic
enclosure shall be provided with door.
8.5 The extinguishers shall be UL listed and FM approved.

9.0 Mobile Foam Extinguisher


A 33 kg mobile foam extinguisher, wheeled type to be provided at the
truck loading pump house area.
10.0 Mobile Foam Water Monitors
Mobile foam water monitors of 1800 litres capacity suitable to operate with
both foam and water with a foam tank of 400 gallons. The monitor shall
have a throw to reach the farthest tallest tank roof. The mobile foam water
monitor shall be wheel mounted type fitted to a trailer which can be towed
by pickup.
Contractor shall supply two numbers of Mobile Foam Water Monitors. One
will be kept at truck loading bay and another one at the terminal.
11.0 Fixed Foam / Water Monitors
Fixed foam / water monitors to be provided at pup houses and truck
loading area as per scope / drawings.
12.0 Jetty Fire Fighting Requirements
Jetty fire fighting requirements shall be as described in the scope /
drawings.
13.0 Eyewash & Safety Shower
Four nos. of Eye wash and Safety showers shall be provided with
connection from the fresh water with adequate pressure reduction
(preferably at the pump houses, truck loading gantry area, Jetty etc)
14.0 Piping Specification
All pipelines shall be of carbon steel construction. All underground piping
system shall be wrapped and coated and shall be protected with cathodic
protection (sacrificial anode type). Refer to the piping specification.
Refer Piping specification for foam concentrate and foam solution.
15.0 Testing & Commissioning
The Contractor shall supply and install all the equipment with performance
test certificates and also conduct performance tests for each type of
equipment supplied at site, for the selected item.
The entire fire water and foam system shall be performance tested
meeting NFPA standards and requirements. The consumables and spares
for the performance test shall be supplied by the Contractor. In addition,
before handing-over, the contractor shall ensure that the entire fire water

Fire Protection Philosophy Page 8 of 16


system, foam system and equipment is fit for operation and fire fighting
with all consumables charged in the system.
16.0 Data Sheets
The datasheets of the following are attached.
i Hydrant Valve
ii Foam / Water monitor
iii Fire Hose Cabinet
iv Sprinkler Nozzle
v Fire Pump

Fire Protection Philosophy Page 9 of 16


DATA
HYDRANT VALVE PAGE 1 OF 1
SHEET

SPECIFICATIONS

Tag No.
Type Hydrant Valve.
Size 2 ½” NB
Construction Dual seated globe pattern with Bib nose.
Inlet Flanged to ANSI B 16.5, 150 lbs.
Outlet Female quick coupling to BS 336 with blank cap and chain.
Rated Discharge 250 USGPM
Gun metal to BS 1400-LG 2 or equivalent. (Aluminum bronze if
Material
sea water service)
Service Potable Water
Certification Manufacturer shall be approved by the Owner.
Plug and chain shall be provided
General Hand wheel operated
Direction of rotation shall be inscribed on the hand wheel

Fire Protection Philosophy Page 10 of 16


DATA FIRE WATER / FOAM MONITOR PAGE 1 OF 1
SHEET

GENERAL SPECIFICATIONS
Type Fixed Fire Water cum Foam Monitors.
Operation Manual
Tag No.

DESIGN PARAMETERS
Service Potable Water
Maximum System 14 bar g or as per design
Pressure
Min. / Max. 0 deg / 80 deg C
Temperature
Nominal Flow 500 USGPM or 1000 USGM as the case may be.
Sweep angle 360 o rotation – continuous with lever / handle operation.
Vertical travel 70 o above horizontal.
Throw 45 meters @ 45 o elevation and 10 o spray angle

MECHANICAL DATA
The monitor shall be low maintenance type with low friction joints for
Construction easy elevation and horizontal movements. It shall have rotation lock
handle to lock monitor manually in any position required.

Inlet Connection Inlet From Bottom, Flanged to ANSI B 16.5, 150 #

MATERIALS
Body Gunmetal. (Aluminum bronze if sea water service)
Nozzle Gunmetal. (Aluminum bronze if sea water service)
Seal Nitrile rubber
Monitor Gear Worm Gear with grease fittings for lubrication
Housing
Fasteners A193 Gr.B7 / A194 Gr. 2H (Galvanized).
Finish Red epoxy paint.

REMARKS
(1). Monitor shall be supplied with nozzle.
(2). Each nozzle shall be single gallonage, constant flow device in any discharge pattern.
They shall be with grease fittings for lubrication.
(3). Monitor shall be supplied with Pressure Gauge.
(4). Monitor shall be UL listed and FM approved.
(5). Fire Water Monitors shall have shut off valve and nozzle spray pattern adjustment facility.
(6). Painting as per Project Specifications suitable for marine environment.
(7). Vendor shall submit design details, specifications and drawings along with the bid for
evaluation.

Fire Protection Philosophy Page 11 of 16


DATA
SHEET
FIRE HOSE CABINET PAGE 1 OF 1

SPECIFICATIONS
Tag No.
Fire hose cabinet with 2 Nos. Fire Fighting Hoses and 2 Nos. Fire
Type
Hose Nozzles.
Service Potable Water
CABINET DETAILS
With necessary hinges, door fasteners and supporting legs. The
doors shall be fitted with neoprene or similar seal to minimize ingress
Construction of dust, sand and moisture. Air vents with fine mesh screens shall be
provided to prevent build up of condensation. Cabinets shall be of
self supporting type with provision for bolting to the grade.
Size Suitable for 2 sets of 2½” NB x 15 m long fire hoses and 2 Nozzles.
Material GRP
Red. The cabinets shall be marked in white lettering of 150 mm high
Finish to read: “FIRE HOSES AND NOZZLES”. The wording shall be in
English and local language
HOSE DETAILS
Non-collapsible, oil proof, rubber hose with instantaneous couplings,
Type
suitable for fire fighting.
Hose – Rubber Hose Duraline or equivalent.
Material
Coupling – Gunmetal. (Aluminum bronze if sea water service)
Size 21/2” dia
Length 15 metres each.
2 ½” NB instantaneous coupling to BS 336 (One end Male and other
End Connections end Female) suitable for connecting to Hydrant valve outlet and
Nozzle inlet).
Weight of hose / meter Vendor to specify.
Maximum Operating
As per design
Pressure.
Test Pressure As per design
Certification UL listed approved.
NOZZLE DETAILS
Adjustable type for jet / fog / shut off with 2½” NB instantaneous male
Construction
connection to suit fire hose.
Rated Flow 250 US GPM.
Material Gunmetal to BS 1400 LG2 or (Aluminum bronze if sea water service)
Maximum Operating
As per design
Pressure.
Test Pressure As per design
Certification UL listed approved.

Fire Protection Philosophy Page 12 of 16


DATA
SPRINKLER NOZZLE PAGE 1 OF 1
SHEET

SPECIFICATIONS

Type Fire Water Spray and Deluge Nozzles.


Vendor to select based on the flow rate and profile, however
Sprinkler Head Size
shall be of minimum 9.5-mm dia. to avoid clogging of nozzles.
Material Aluminum bronze.
Max. Nozzle pressure As per design
Vendor to Specify based on the area and total flow rate for
Rated Discharge following flow conditions.
Application rate, Water 4 lpm / m2 of shell area
Service Potable Water
Certification UL listed and FM approved.
i. Vendor shall submit details of design, specifications, exit
pressure, spray pattern, size etc. along with the bid for
evaluation.
ii. Nozzles to be installed on the horizontal piping shall be
Remarks suitable for up-right position to avoid clogging of nozzle
openings.
iii. Strainers for each individual nozzle shall be avoided in
order to avoid clogging of these strainers with dirt.
Accordingly, nozzle openings shall be sized adequately.

Fire Protection Philosophy Page 13 of 16


DATA SHEET MAIN FIRE WATER PUMP SETS Page 1 of 3

Project: P.O. No.:


Applicable to : ⊗ Proposal Ο Purchase
Drive: Electric Motor / Diesel Engine Driven
Ο As-built
Site : Indonesia Engine Item No. :
Type of pump: Centrifugal Engine supplied by: Pump Manufacturer
Pump Item No. : Engine mounted by: Pump Manufacturer
Service : Main Fire Water Pumps No of turbines reqd. : --
No. of pumps reqd. : 3 nos. Turbine Item No. : --
Pump mfr. : : * Turbine provided by : --
Pump size & model: : * Turbine mounted by : --
No of stages : Single Remarks : --
1. Information to be completed by: O Purchaser ⊗ Manufacturer
2. Pumps shall be designed to NFPA-20 requirements
OPERATING CONDITIONS
Liquid : Potable Water NPSH available: * M
Suction Pipelines Loss: * Kg/cm2 Normal : *
Pumping Normal : Ambient Capacity @ PT Rated : 567 Cu.M./Hr*
Temperature Maximum : 600C Minimum : *
Sp. Gravity @ PT : 1 (Max) Discharge pressure : 102 meters *
Maximum : -- Bar G
Vapor press @ PT : 0.074 Kg/cm2A Suction Pressure
Rated : (Min): Bar G
Viscosity @ PT : 1 Cst @ 400C (Max) Differential pressure : * Bar G
Maximum : * 0C
Site temperature Differential head : *
Minimum : * 0C
Unusual condition: SALINE ATMOSPHERE Hydraulic kW : *
Corrosion / Erosion caused by : service fluid
and atmosphere Location O Indoor O Heated O With roof
Remarks : * means “To be completed / ⊗ Outdoor O Unheated ⊗ Without roof
reconfirmed by the Contractor”
PERFORMANCE (TO BE COMPLETED BY MANUFACTURER)
Minimum Thermal M3/Hr
Proposal curve No:
Continuous flow Stable M3/Hr
Rotation (viewed CW CCW
Speed RPM: Max *
From coupling end)
NPSH reqd. (water) M : Suction sp. Speed:
Rated BHP KW : Efficiency : %
Maximum BHP with
Rated Impeller KW Remarks : MANUFACTURER TO SPECIFY
Maximum head with RUNOUT CONDITIONS
Rated impeller M

Fire Protection Philosophy Page 14 of 16


DATA SHEET FIRE WATER PUMP SETS Page 2 of 3

CONSTRUCTION (TO BE COMPLETED BY MANUFACTURER)


Centerline Near centerline Nozzles Size Rating Facing Location
Casing Foot Vertical In line Suction
Mount Bracket Vertical barrel
Discharge
Sump pump
Casing split Axial Radial Miscellaneous connections
Casing Volute Single Staggered Nozzles Drain Vent Pressure gauge
type* Diffuser Double Suction
Maximum Kg/cm2 G @ 150C Discharge
allowable Bearings
pressure Kg/cm2 G @ 150 PT Radial Thrust
(Type / No)
Hydrostatic Ring Oil Oil mist
Kg/cm2 G
test pr. Press
Lubrication Type
Rated Flood Flinger
Impeller dia
Maximum Manufacturer
(mm)
Minimum Coupling Type
Impeller
Between bearing Overhung Model
mount
Impeller Closed Semi-open
⊗ Pump manufacturer
type Open Driver half coupling
Manufacturer manufacturer by O Driver manufacturer
Type O Purchaser
Packing
Size / No. of rings Gland plate taps O Quench O Flush
⊗ Single O Double O Tandem required O Drain O Vent
Manufacturer Remarks :
Model
Manufacturer code
Mechanical
seal API class code
Gland type / Material
AUXILIARY PIPING (TO BE COMPLETED BY MANUFACTURER)

Fire Protection Philosophy Page 15 of 16


DATA SHEET FIRE WATER PUMP SETS Page 3 of 3

MATERIALS (TO BE COMPLETED BY MANUFACTURER)


O Table E-1 class Base plate (material / type)
Barrel / case API 610 standard base plate.
Impeller Remarks:
Case / impeller wear rings
Shaft
INSPECTION AND TESTS
Test Non-witnessed Witnessed Observed √ Inspection required for nozzle welds
Performance O √ O √ Magnetic particle √ Dye penetrant
Hydrostatic √ O O √ Inspection required for castings
NPSH O √ O √ Radiographic √ Ultrasonic
√ Shop inspection √ Material certification O Inspection required for
O Dismantle and inspect after test √ Magnetic particle √ Dye penetrant
√ Casting repair procedure approval √ Radiographic √ Ultrasonic
Remarks :
Material of construction to suit the service requirements.

ENGINE DRIVER (TO BE COMPLETED BY MANUFACTURER)

WEIGHTS (TO BE COMPLETED BY MANUFACTURER)


Weight of pump & base plate Kg: Remarks :
Weight of Engine Kg:
Weight of turbine Kg:
PACKING AND SHIPPING
Packing type O Domestic ⊗ Export
Packing specs. ⊗ Mfrs. Standard O Purchaser's specs.
Packed weight Kg
Packing size LXBxHmm
Shipping by Rail Road Ocean

Fire Protection Philosophy Page 16 of 16