1. Major specification table
NO Item Rating of ACB Remarks
1 Type AH-E
3S 65kA
Mechanical 15000times
17 Life cycle
Electrical 5000times
18 standards IEC60947-2
M2 D2 D2 BX SC1 U0 T Hyx CN
LS ACB production specification
2. Outline drawing
1) Fixed type (ACB, AH-32E3-32A M2D2D2BX SC1U0T Hyx CN )
LS ACB production specification
2. Outline drawing
2) Draw-out type (ACB, AH-32E3-32A M2D2D2BX SC1U0T Hyx CN )
LS ACB production specification
2. Outline drawing
3) Fixed type (ACB, AH-40E3-40A M2D2D2BX SC1U0T Hyx CN )
LS ACB production specification
2. Outline drawing
4) Draw-out type (ACB, AH-40E3-40A M2D2D2BX SC1U0T Hyx CN )
This diagram is based on "CONNECTED" position of a circuit breaker and Opening, Motor charging, Releasing of locking plate should be normal condition.
Common
ZSI Input
ZSI Output
ZCT
OFF
OFF
ON
Reset
183
V1 V2 V3 VN E1 Z3 Z1 485+ R11 R22 513 R2 R1 251 83 /RES(+)
D1 C11 C1 A1 U1 413 423 51 41 31 21 11 53 43 33 23 13 T1 TC1 T2 TC2 341 331 321 311
Temperature Temperature
Axb
Sensor-1 Sensor-2
Axb
Axb
Axb
Axb
Axb
Axa
Axa
Axa
Axa
Axa
CL4
CL3
CL2
CL1
or
3. Wiring diagram
184
E2 Z4 Z2 485- 544 534 524 252 84 /RES(-)
D2 C12 C2 A2 U2 414 424 52 42 32 22 12 54 44 34 24 14 342 344 332 334 322 324 312 314
OFF
ON
LTD
GTD
STD/Inst
Charged
Charged
Main circuit Digital trip relay Electric opertaion Charge Auxiliary switch Thermal module Cell switch
Fault trip Circuit Completion contact
UVT
Secondary
Ready to close trip coil
Auxiliary switch"b" ALARM1 "a" ZSI output LTD Long time delay trip indicator Connector of the control
circuit terminal of drawout type
Charge signal ALARM2 "a" ZCT STD/Inst Short time delay/instantaneous
Charge signal communication Ready to close swtich Voltage Module GTD Ground fault trip indicator <Connector terminal configuration>
4) Option 8) Temperature Sensor and Auxiliary switch(6a6b) can not work together at the same time.
- Ready to close contact, Trip alarm contact, UVT coil, Fully charged contact, secondary trip coil. 9) AL2 and RES can not work together at the same time.
- Cell switch, Thermal Module,Voltage Module,Remote close-open Module, ZCT, ZSI. AUX S/W
10) Ready to close switch and Charge completion contact can not work together at the same time.
5) Please consult us for the use of ZSI (Zone selective Interlocking).
6) Refer to the catalogue for the connection of Trip relay and UVT.