JOB HAZARD ANALYSIS FORM

JHA NUMBER NO: DOD-MST-EI-010B Revision: A

Type of Job being analyzed: Cathodic Protection for Re-locating existing facilities
JHA Members: HSE, QC Manager, Cont Manager
Department/Section originating JHA
JOB Performers: Supervisor, Welders, Helpers
Normal approvals: Name Signature DATE GENERAL JOB REQUIREMENTS
JHA By: G K Thomas 10/10/2006 COMMON PPE
N C Soni
G Ramesh Babu GENERAL JOB REQUIREMENTS
Additional Approvals (Determined by JOB Supervisor in correlation with CTJV EHSS Manager) 1 CTJV EHSS Inducted workforce
Name Signature Date 2 Dodsal HSE Inducted
3 Daily TBT
4 Adequate supervision
Discipline Superintendent (CTJV) 5 Third Party certified, colour coded lifting
EHSS Representative (CTJV) equipments and lifting tools & tackles.
EHSS Representative (Company) 6 Valid Qatari License for drivers & operators
CTJV I.H.

Other (List Below)

PPE
NOMEX Coveralls, Safety shoes, Helmets
Notes: EHSS sign when required for hazardous Welding sheild, Safety Goggles , Apron,
Work details as required by CTJV PTW. Hand gloves, spats
APPROVAL REQUIRED FOR HAZARDOUS WORK DETAILED IN THE CTJV WORK PERMIT PROCEDURE
CHANGING CONDITIONS & EMERGENCY PROCEDURStop Work, Switch Off Equipment, Supervisor Directs Personnel to Nearest and Safest
Muster point Considering Wind direction. Supervisor accounts for all Workers.
Missing persons are reported to CTJV EHSS Dept. When all clear is given check with CTJV EHSS before resuming to work.
EMERGENCY TELEPHONE NO: Ras Gas - 473 8999
Note: If any of the tasks involves biological, physical or chemical hazards, then CTJV Industrial Hygienist must also approve the work
Use additional sheets as necessary
Details on safety (PPE, Hazards etc) and environmental requirements can be found in CTJV and Ras Gas Safety and Environmental procedure.

Page 1 of 2
JOB HAZARD ANALYSIS FOR: CATHODIC PROTECTION FOR RE-LOCATIONING EXISTING FACILITIES
Doc. #: DOD-MST-EI-010B REV: B
SEQUENCE OF BASIC POTENTIAL HAZARDS HAZARDS CONTROL RESPONSIBLE PARTY
ACTIVITY STEPS

Safety Administration
1.1.1 Supervisor
No work to proceed until confirmation from RasGas operations of
isolation, local confirmation of isolation and permit issuance.
1.0 Safety Documentation 1.1 Failure of service Cold Work PTW to be completed prior to any digging takes place.
Ensure crane and lifting tackle certification is current and
equipment colour coded

C.P. Dismantling & Installation


Toolbox talk to be given to workers, ensure all understand
2.0 Disconnection of cable 2.1 Shock 2.1.1 procedure prior to work Supervisor
Ensure that all cables have been isolated

Establish position of cables by hand digging trail pits(<1.2M


Excavation of trial pits 2.2 Break/cut C.P. cable 2.2.1 Supervisor
deep).

Lifting and Placing Junction Box's

Barricade the radius off of the lifting area (yellow/black tape)


Relocation of C.P. cables and Personnel injury and damage to Only certified operator with competent riggers to execute the
3.0 3.1 3.1.1 Operator / Rigger
Junction boxes equipment job.
No unauthorised persons allowed in the working area

4.0 Connecting and Energising 4.1 Shock 4.1.1 Competent electrical personnel to energise C.P. cable Supervisor

CTJV HSE (M) 581 5039


EMERGENCY (M) # All
DODSAL HSE (M) 588 2734

Page 2 of 2