JOB SAFETY ANALYSIS

JSA NUMBER NO: DOD-MST-INS-004 Revision: 4

Type of Job being analyzed:Installation of Impulse Line, Air Tubing and Pressure Testing
JSA Members: HSE Department, Construction Manager
Department/Section originating JSA
JOB Performers: Supervisor, Electricians, Riggers, Helpers
Normal approvals: Name Signature DATE GENERAL JOB REQUIREMENTS
JSA By: Johan Moller COMMON PPE
3/29/2009
S. Vijayakumar GENERAL JOB REQUIREMENTS
Additional Approvals (Determined by JOB Supervisor in correlation with CTJV EHSS Manager) 1 CTJV EHSS Inducted workforce
Name Signature Date 2 Dodsal HSE Inducted
3 Daily TBT
4 Adequate supervision
Discipline Superintendent (CTJV) 5 Third Party certified, colour coded lifting
EHSS Representative (CTJV) equipments and lifting tools & tackles.
EHSS Representative (Company) 6 Valid Qatari Licenses for drivers & operators
CTJV I.H. 7 Third Party certified, competent operators,
Other (List Below) electricians, riggers.
PPE
NOMEX Coveralls, Safety shoes, Helmets
Notes: EHSS sign when required for hazardous Safety Goggles , Appropriate Hand gloves
Work details as required by CTJV PTW.

APPROVAL REQUIRED FOR HAZARDOUS WORK DETAILED IN THE CTJV WORK PERMIT PROCEDURE
CHANGING CONDITIONS & EMERGENCY PROCEDURStop Work, Switch Off Equipment, Supervisor Directs Personnel to Nearest and Safest
Muster point Considering Wind direction. Supervisor accounts for all Workers.
Missing persons are reported to CTJV EHSS Dept. When all clear is given check with CTJV EHSS before resuming to work.
EMERGENCY TELEPHONE NO: Ras Gas - 473 8999,JOC NO -474 1999
Note: If any of the tasks involves biological, physical or chemical hazards, then CTJV Industrial Hygienist must also approve the work
Use additional sheets as necessary
Details on safety (PPE, Hazards etc) and environmental requirements can be found in CTJV and Ras Gas Safety and Environmental procedure.

DOD MST-INS-004 Page 1 of 6


JOB SAFETY ANALYSIS FOR: Installation of Impulse Line, Air Tubing and Pressure Testing
Doc. #: DOD-MST-INS-004

SEQUENCE OF BASIC
SAFETY ANALYSIS SAFETY ANALYSIS CONTROL RESPONSIBLE PARTY
ACTIVITY STEPS

Method statement to be explained to all employees and it must be


made available at the site during the activities.
Hazard assessment and safety
Obtain Method Statement and Job specific JHA to be made available at the site & control measures
precautions are not identified Civil Engineer,
1.0 HSE Documents & Job specific 1.1 1.1.1 to be communicated to all personnel involved in the job by using
Assessed and required control Site Supervisor
Tool Box Talk (S.T.A.R.T Card) START Card.
measures not communicated
START Card to be filled up prior to the commencement of work and
to be kept in the site.

Obtain PTW for Hot work/Cold work prior to the commencement of


the work and to be made available at the work site during all the
activities.
Necessary information not Site Mandatory PPE to be used by all employees.
Civil Engineer,
2.0 Obtain PTW. 2.1 communicated to the Area 2.1.1 Ensure civil workers and concrete spraying pump operators are using
Site Supervisor
authority well respiratory protection while working with cement.
All access shall be maintained tidy and debris free.
Ensure the MSDS of all chemicals are available and attached with the
permit or Method Statement.

Working with Welding Ensure welding /drilling machines inspected and approved, grounded.
machine/Drilling machine Use fire blanket to cotrol sparks.
Electricity Ensure trained and experienced operators are assigned to the job
Welding operation/ Drilling Damaged/ uninsulated power Keep loose material away from rotating parts.
3.0 3.1 3.1.1 Site supervisor
operation cables Ensure machines are checked for their good working condition prior
Rotating Parts. to the start of the job by operators
Fire, electrocution Provide fire extinguisher, fire watch, deadman switch for electric
Hand injury, thermal burn drill, use leather gloves

DOD-MST-INS-004 INSTALLATION OF IMPULSE LINE, AIR TUBING AND PRESSURE TESTING (REV-4) "NO WATER NO WORK" Page 2 of 6
Doc. #: DOD-MST-INS-004

SEQUENCE OF BASIC
SAFETY ANALYSIS SAFETY ANALYSIS CONTROL RESPONSIBLE PARTY
ACTIVITY STEPS

Working with hand tools Ensure all hand tools are inspected and approved
(steel/plastic lead hammer, Ensure trained and experienced operators are assigned to the job
4.0 Tools and Equipment 4.1 4.1.1 Site supervisor
pliers, screw drivers, tools for Ensure all hand tools are checked for their good working condition
hand excavation) prior to the start of the job by operators

Ensure area is barricaded and no unwanted personnel movement.


Unwanted
Ensure the compressor is inspected and approved by CTJV.
disturbance/personnel
Ensure the pressure compressor is placed in a safe location.
movement in the work area
Whip arrestors should be implemented on compressor.
Working at height/unsecured
5.0 Area Preparation & Barricading 5.1 5.1.1 Place fire extinguishers near the compressor. Site supervisor
tools kept at height
Ensure use black and orange warning tape for pressure testing and
No toe boards.
posted sign board(DO NOT ENTER)Pressure testing is on going.
Bad housekeeping
Area proper access / egress
Poor stacking
Provide sign indicating responsible person and contect number.

Placing safety sign board and Unwanted disturbance in the Ensure safety sign board is provided and no unwanted
6.0 controlling vehicular/personnel 6.1 work area 6.1.1 vehicular/personnel movement in the work site Site supervisor
movement if required No access Ensure access and egress are available.

Ensure personnel working at height are using Fall protection


appliances and all are 100% fall protection trained.
Lifting equipment, tools & All lifting plant and lifting tackle shall be certified and colour
tackle not inspected/color coded, all operators of lifting plant shall be certified by Third party.
Lifting and Placing of Equipment,
coded No load shall be lifted over personnel.
7.0 Tray 7.1 7.1.1 Site supervisor
Overhead lifting Signaler must be visible and wear bright colours.
Working at height
Inexperienced banks man All equipment must be isolated before any work commences.
Falling objects If work is required on any piece of equipment that is live, a specific
START talk must be conducted at work site and must be recorded
Secure materials from falling

DOD-MST-INS-004 INSTALLATION OF IMPULSE LINE, AIR TUBING AND PRESSURE TESTING (REV-4) "NO WATER NO WORK" Page 3 of 6
Doc. #: DOD-MST-INS-004

SEQUENCE OF BASIC
SAFETY ANALYSIS SAFETY ANALYSIS CONTROL RESPONSIBLE PARTY
ACTIVITY STEPS

Ensure personnel working at height are using fall protection


equipment
Working with power operated
Ensure welding /drilling machines inspected and approved
equipment
Fitting of tray support to the Ensure trained and experienced operators are assigned to the job
Damaged/ uninsulated power
structure Use fire blankets during welding.
8.0 8.1 cables 8.1.1 Site supervisor
Working at height Have fire extinguisher nearby.
Fire, Electrocution
Welding/drilling & bolting Ensure machines are checked for their good working condition prior
Personnel injury
to the start of the job by operators
Thermal burn
Appoint the Trained fire watchman.
Use leather gloves

Working at height Ensure personnel working at height are using Fall protection
Installation of Cable tray and
9.0 9.1 Loose gears/tools at height 9.1.1 appliances Site supervisor
cover
Falling objects/ personnel 100% tie off during hazards tasks.

Tools need to be inspected including safety harness


Installation of Air /Impulse Permit in place with all safety requirements
Working at height
10.0 tubing along with tubing tray and 10.1 10.1.1 Safe lifting technices (Cable tray) Site supervisor
Falling objects/ personnel
supports Proper storage of material at higher elevation
4
100% tie off required

Linking of cable tray with earth


conductor and bonding tray joints
Ensure personnel are using hand gloves of correct type and size.
with earth bonding wires
11.0 11.1 Hand injury 11.1.1 Ensure JSA for manual excavation is referred Site supervisor
(Cutting cables with cable,
Do all cutting away from body parts.
Cutting tools, Using crimping
tools, Hand excavation)

DOD-MST-INS-004 INSTALLATION OF IMPULSE LINE, AIR TUBING AND PRESSURE TESTING (REV-4) "NO WATER NO WORK" Page 4 of 6
Doc. #: DOD-MST-INS-004

SEQUENCE OF BASIC
SAFETY ANALYSIS SAFETY ANALYSIS CONTROL RESPONSIBLE PARTY
ACTIVITY STEPS

Ensure all tools are inspected and approved before use


Improper hand tools Ensure the area is clear from any under foot obstacles.
12.0 Cutting cables 12.1 12.1.1 All
Personnel injury Use proper hand protection
Clear up all off cuts and tools before leaving the work place

Tripping hazards Remove all the debris from site. All members
13.0 Housekeeping 13.1 13.1.1
Fire hazards. Maintain periodical housekeeping. in the crew

Ensure plenty of cool drinking water is available at site and all


employees are drinking water periodically
Ensure the availability of appropriate rest shelters and employees
Lack of drinking water
are taking periodical rest as per the requirements
14.0 Heat stress Management 14.1 Unavailability of rest shelter 14.1.1 Site Supervisor
Ensure all employees are provided with water flasks and all are having
Heat stress
it during working.
Ensure all employee's water flasks are filled with cool water.
Ensure 'NO WATER - NO WORK'

DOD-MST-INS-004 INSTALLATION OF IMPULSE LINE, AIR TUBING AND PRESSURE TESTING (REV-4) "NO WATER NO WORK" Page 5 of 6
Doc. #: DOD-MST-INS-004

SEQUENCE OF BASIC
SAFETY ANALYSIS SAFETY ANALYSIS CONTROL RESPONSIBLE PARTY
ACTIVITY STEPS

Ensure implementation of PTW system.


Ensure personnel are adequately trained for safe working practices
during night hours
Strong wind/rain Ensure areas are identified where night shift works are to be carried
Type of activities performed out and adequate safety arrangements are made including the lighting
Location of the activity arrangements.
Insufficient light Ensure all equipments are equipped with flickering light reverse alarm
Insufficient work place access etc. (cranes, various plant and mobile equipment).
and egress Ensure no lifting activities are carried out at night.
Poor visibility Ensure all banks men are provided with highly visible jackets/ Electrical Supervisor,
15.0 Night shift work 15.1 15.1.1
Lack of supervision overalls. Civil Supervisor
Lack of Emergency Ensure proper housekeeping is maintained.
preparedness Ensure access/pathways are adequately illuminated.
Human fatigue Ensure effective night shift supervision.
Insects, Animals, Reptiles etc Ensure in the event of adverse climatic condition (high wind, rain,
Bad Climatic condition( cold, dust etc.) the work is stopped.
rain, dust etc ) Ensure personnel are trained to meet any emergency situation and
emergency mock drills may be conducted to evaluate the emergency
preparedness.
Ensure night shift personnel get proper sleep/rest at day time.

[General outdoor area-54 Lux,General construction area-108


HSE
Lux,Area of Technical work-216 Lux] to be recorded.

Tested and approved equipments and tools shall be used


Damage to Equipment
Experienced and skilled workers shall be deputed for the job.
16.0 Pressure Testing 16.1 Rupture of Testing line 16.1.1 Site Supervisor
Barricade and evacuate the area, install hazard warning signage.
Injury to personnel
Follow and provide proper PPE's.

EMS 4738999
EMERGENCY CONTACT NOS. DODSAL HSE (M) 588 2734 All
JOC NO 474 1999

DOD-MST-INS-004 INSTALLATION OF IMPULSE LINE, AIR TUBING AND PRESSURE TESTING (REV-4) "NO WATER NO WORK" Page 6 of 6