Type of Job being analyzed:Installation of Impulse Line, Air Tubing and Pressure Testing
JSA Members: HSE Department, Construction Manager
Department/Section originating JSA
JOB Performers: Supervisor, Electricians, Riggers, Helpers
Normal approvals: Name Signature DATE GENERAL JOB REQUIREMENTS
JSA By: Johan Moller COMMON PPE
3/29/2009
S. Vijayakumar GENERAL JOB REQUIREMENTS
Additional Approvals (Determined by JOB Supervisor in correlation with CTJV EHSS Manager) 1 CTJV EHSS Inducted workforce
Name Signature Date 2 Dodsal HSE Inducted
3 Daily TBT
4 Adequate supervision
Discipline Superintendent (CTJV) 5 Third Party certified, colour coded lifting
EHSS Representative (CTJV) equipments and lifting tools & tackles.
EHSS Representative (Company) 6 Valid Qatari Licenses for drivers & operators
CTJV I.H. 7 Third Party certified, competent operators,
Other (List Below) electricians, riggers.
PPE
NOMEX Coveralls, Safety shoes, Helmets
Notes: EHSS sign when required for hazardous Safety Goggles , Appropriate Hand gloves
Work details as required by CTJV PTW.
APPROVAL REQUIRED FOR HAZARDOUS WORK DETAILED IN THE CTJV WORK PERMIT PROCEDURE
CHANGING CONDITIONS & EMERGENCY PROCEDURStop Work, Switch Off Equipment, Supervisor Directs Personnel to Nearest and Safest
Muster point Considering Wind direction. Supervisor accounts for all Workers.
Missing persons are reported to CTJV EHSS Dept. When all clear is given check with CTJV EHSS before resuming to work.
EMERGENCY TELEPHONE NO: Ras Gas - 473 8999,JOC NO -474 1999
Note: If any of the tasks involves biological, physical or chemical hazards, then CTJV Industrial Hygienist must also approve the work
Use additional sheets as necessary
Details on safety (PPE, Hazards etc) and environmental requirements can be found in CTJV and Ras Gas Safety and Environmental procedure.
SEQUENCE OF BASIC
SAFETY ANALYSIS SAFETY ANALYSIS CONTROL RESPONSIBLE PARTY
ACTIVITY STEPS
Working with Welding Ensure welding /drilling machines inspected and approved, grounded.
machine/Drilling machine Use fire blanket to cotrol sparks.
Electricity Ensure trained and experienced operators are assigned to the job
Welding operation/ Drilling Damaged/ uninsulated power Keep loose material away from rotating parts.
3.0 3.1 3.1.1 Site supervisor
operation cables Ensure machines are checked for their good working condition prior
Rotating Parts. to the start of the job by operators
Fire, electrocution Provide fire extinguisher, fire watch, deadman switch for electric
Hand injury, thermal burn drill, use leather gloves
DOD-MST-INS-004 INSTALLATION OF IMPULSE LINE, AIR TUBING AND PRESSURE TESTING (REV-4) "NO WATER NO WORK" Page 2 of 6
Doc. #: DOD-MST-INS-004
SEQUENCE OF BASIC
SAFETY ANALYSIS SAFETY ANALYSIS CONTROL RESPONSIBLE PARTY
ACTIVITY STEPS
Working with hand tools Ensure all hand tools are inspected and approved
(steel/plastic lead hammer, Ensure trained and experienced operators are assigned to the job
4.0 Tools and Equipment 4.1 4.1.1 Site supervisor
pliers, screw drivers, tools for Ensure all hand tools are checked for their good working condition
hand excavation) prior to the start of the job by operators
Placing safety sign board and Unwanted disturbance in the Ensure safety sign board is provided and no unwanted
6.0 controlling vehicular/personnel 6.1 work area 6.1.1 vehicular/personnel movement in the work site Site supervisor
movement if required No access Ensure access and egress are available.
DOD-MST-INS-004 INSTALLATION OF IMPULSE LINE, AIR TUBING AND PRESSURE TESTING (REV-4) "NO WATER NO WORK" Page 3 of 6
Doc. #: DOD-MST-INS-004
SEQUENCE OF BASIC
SAFETY ANALYSIS SAFETY ANALYSIS CONTROL RESPONSIBLE PARTY
ACTIVITY STEPS
Working at height Ensure personnel working at height are using Fall protection
Installation of Cable tray and
9.0 9.1 Loose gears/tools at height 9.1.1 appliances Site supervisor
cover
Falling objects/ personnel 100% tie off during hazards tasks.
DOD-MST-INS-004 INSTALLATION OF IMPULSE LINE, AIR TUBING AND PRESSURE TESTING (REV-4) "NO WATER NO WORK" Page 4 of 6
Doc. #: DOD-MST-INS-004
SEQUENCE OF BASIC
SAFETY ANALYSIS SAFETY ANALYSIS CONTROL RESPONSIBLE PARTY
ACTIVITY STEPS
Tripping hazards Remove all the debris from site. All members
13.0 Housekeeping 13.1 13.1.1
Fire hazards. Maintain periodical housekeeping. in the crew
DOD-MST-INS-004 INSTALLATION OF IMPULSE LINE, AIR TUBING AND PRESSURE TESTING (REV-4) "NO WATER NO WORK" Page 5 of 6
Doc. #: DOD-MST-INS-004
SEQUENCE OF BASIC
SAFETY ANALYSIS SAFETY ANALYSIS CONTROL RESPONSIBLE PARTY
ACTIVITY STEPS
EMS 4738999
EMERGENCY CONTACT NOS. DODSAL HSE (M) 588 2734 All
JOC NO 474 1999
DOD-MST-INS-004 INSTALLATION OF IMPULSE LINE, AIR TUBING AND PRESSURE TESTING (REV-4) "NO WATER NO WORK" Page 6 of 6